| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC 869B INDIAN CENTRIFUGE ENGINEERING SOLUTIONS PRIVATE LIMITED ETTUMANOOR KOTTAYAM KOTTAYAM KERALA 686631 UDYAM KL 07 0003937 | KOTTAYAM | KERALA | 686631 | ₹18.9 L | L1 | Accepted-AOC lowest |
| 2 | L2₹19.7 LRejected-Finance | ₹19.7 L | L2 | Rejected-Finance second |
| Sl No | Description | Qty | Unit | Indian Centrifuge Engineering Solutions Private Limited L1 | HARILAL P.V L2 |
|---|---|---|---|---|---|
| 1.00 | Appendix A
Maintenance to the droplet separator unit of each incinerator by dismantling the unit from the incinerator assembly , and de ashing the same using suitable chemical solution, Re assembling the unit using new high quality gasket, nuts, bolts and painting using heat resistant hammer tone painting .The work includes repairing and cleaning of ‘U’ bend connecting the droplet separator with ID fan consumables | 2 | Job | 42,000 ₹84,000 | 28,000 ₹56,000 |
| 2.00 | Maintenance to the ventury scrubbing unit of each incinerator by dismantling all the water inlet connections from the unit, cleaning the spray nozzles, inside surface, damper mechanism, thermo well and re assembling the unit using new gaskets, nuts bolts etc. the defective gaskets, nuts bots , . The rate inclusive of cost of consumables etc | 2 | Job | 16,500 ₹33,000 | 24,500 ₹49,000 |
| 3.00 | Dismantling, overhauling, cleaning, and repair works to the FD fan assembly .The work includes complete cleaning of the impeller, motor, coupling and re assembling , and necessary patch work to the casing and painting .The rate inclusive of all taxes transportation and cost of consumables. | 2 | Job | 34,000 ₹68,000 | 24,000 ₹48,000 |
| 4.00 | Maintenance, repairing and complete overhauling of primary chamber. (2 set) Cleaning the refractory lined furnace walls,&arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined charging door and ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats)of primary chamber out surface using heat resistant aluminium paint. The rates inclusive of charges for tools and tackles, consumables and transportation charges. | 2 | Job | 39,600 ₹79,200 | 48,000 ₹96,000 |
| 5.00 | Maintenance, repairing and complete overhauling of secondary chamber. (2 set)Cleaning the refractory lined furnace walls,&arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats)of secondary chamber out surface using heat resistant aluminium paint. The rates inclusive of charges for tools and tackles, consumables and transportation charges. | 2 | Job | 39,600 ₹79,200 | 43,000 ₹86,000 |
| 6.00 | Complete dismantling of mono -bloc burner assembly in primary and in secondary chamber for both the Incinerators , cleaning of electrodes, solenoid valves, blower fans, transformer, burner rod, nozzle, photocell, sight glass, diffuser plate, cone etc., Reassembling and tuning of burner assembly for proper combustion of system.The rate inclusive of all taxes. | 2 | Job | 26,000 ₹52,000 | 38,000 ₹76,000 |
| 7.00 | Labour charges for cleaning of fuel day tank, fuel lines, fuel filter , Rectification of leakages to the fuel line, valves, fuel pump, Replacement of gland packing, gaskets, oil seal for both the incinerators . The rate is inclusive of all taxes etc | 2 | Job | 10,000 ₹20,000 | 8,200 ₹16,400 |
| 8.00 | Labour charges for checking and necessary repairs of control panel board and related parts of Incinerator ensuring perfect and trouble free operation of all switches, contactors, OLR, MCBs, fuses, sequence controller, temperature controller, RTD, thermocouple, motors, photocell, visual and alarm monitors, limit switches, indication lamps, etc. and cleaning of all terminals using Carbon tetra chloride, painting of panel board. | 2 | Job | 40,000 ₹80,000 | 35,000 ₹70,000 |
| 9.00 | Dismantling overhauling cleaning and minor repair works to the ID fan assembly. The work includes reassembling the blower unit, motor, shaft, impeller, bearing block, in proper alignment and carrying out necessary cleaning and surface finishing for the outer casing, , necessary patch work to the casing and repainting using heat resistant hammer tone paint and labour charges for replacing of bearings ,greasing of bearing and dyanamic balancing of impeller .The rate inclusive of all taxes transportation and cost of consumables. | 2 | Job | 42,000 ₹84,000 | 41,000 ₹82,000 |
| 10.00 | APPENDIX-B (Spare Parts)
Thermocouple K Type (For primary chamber) | 2 | Each | 6,000 ₹12,000 | 6,200 ₹12,400 |
Tender Value
₹17.3 L
EMD Value
₹43,400
Closing Date
12 Sept 2023, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP Nilackal Envtl M and M Festival in 1199 ME Overhauling and operation of incinerator unit I and II including unit I and II including supply of spares and labour New Inc-retender
2023_TDB_591763_2
SDP/EE/ET-20/23-24
Open Tender
Civil Works - Others
90 days
Nilackal
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
₹43,400
26 Mar 2026
7 Sept 2023
14 Sept 2023
7 Sept 2023
12 Sept 2023
7 Sept 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
pgmnew.pdf
Tender Documents • 0.02 MB
20.pdf
Tender Documents • 0.60 MB
BOQ_881300.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid