Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance LEVEL III WHITEHALL 143 AUGUST KRANTI MARG OPERA HOUSE MUMBAI MAHARASHTRA 400036 | 400036 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
4 Dec 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Admiral Superintendent
Naval Ship Repair Yard, Naval Base, Karwar
UNDERTAKING REPAIR RATE CONTRACT FOR REPAIR /MAINTENANCE OF REPLENISHMENT/ FUELING AT SEA (RAS/FAS) SYSTEM FOR A PERIOD OF ONE YEAR AND EXTENDABLE UPTO TWO MORE YEARS ONBOARD NAVAL VESSEL
2024_NAVY_684886_1
REG-PGES-1001-RRC-2024-RAS-FAS
Limited
Marine Services
Item Rate
1095 days
Naval Ship Repair Yard, Naval Base, Karwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.4 L
Yes
5 Dec 2024
21 Nov 2024
5 Dec 2024
21 Nov 2024
4 Dec 2024
22 Nov 2024
Amount
Maintenance Scheduled For Hydraulics :- Half Yearly Maintenance:- For Hydraulic valves, motors, pumps and actuators :-
Check the individual units, inspect, and subject the same to pressure test and record the same. Per pump / per motor.
Check the individual units, inspect, and subject the same to pressure test and record the same. Per Manifold.
After liquidation of defects, recheck the system. Start the Power pack unit again and run 30 minutes for full working pressure and observe for the above faults and record. Per pump / per motor
After liquidation of defects, recheck the system. Start the Power pack unit again and run 30minutes for full working pressure and observe for the above faults and record. Per manifold.
Check hydraulic oil contamination and oil level.
Flush Oil to NAS 7( including filter elements)
Functional checks for performance of following Manifold blocks:-
Power Unit Manifold block
Pump Filter Manifold Assembly
Neutral By pass Manifold
Saddle Winch brake manifold
Spanwire/highline brake manifold
Inboard saddle winch Manifold
Span wire / Highline antislack Manifold
Antislack manifold assembly
Antislack motor manifold
Inhaul/ Outhaul Brake Manifold
Inhaul/Outhaul Motor Manifold
Sliding Trolley Block Auxiliary Manifold
Inboard Saddle winch manifold
Hydraulic Pumps:- Inspection, testing and recording of following hydraulic pumps for performance onboard :-
Main pumps :
Aux. pumps :
Hydraulic Motors :- Inspection, testing and recording of following hydraulic motors for performance onboard :-
Sliding Trolley Motor HMB 3.9
Midspan Motor HMB 3.2
Span wire Motor HMB 12B
Antislack Motor
Antislack Motor M60F
Inboard saddle motor (Charlym)
Hydraulic Cylinders / actuators:- Carry out functional test for leakages and record :-
Main RAMS ( Ram Tensioner Cylinder)
Antislack Hydraulic Cylinder
Hydraulic Hose assemblies :-
To replace, wherever the hoses wherever weak, damaged or leaking
Anti-Vibration mounts of Hydraulic Power Pack :-
Check and replace if necessary
Fasteners, check & replace if necessary:-
M16, M12, M10, M8& M6
M18, M19, M20, M21,M22 , M23, M24
M27, M28, M29, M30, M31, M32, M33, M34, M35 , M36
Yearly Maintenance:-
Change hydraulic oil and fill new oil by using filtration unit.
Change 'O' rings of flanges/joints wherever leaking.
Change ball valves wherever required.
Change filter elements
Carry out chemical cleaning of the Heat Exchanger - scope of works includes the following activities. (a) Removal of Heat exchanger from Position on ship, (b) Removal of all the plates, (c) Clean all plates with chemical / water, (d) Renew all the seals. (Seal kit to be supplied by NSRY / Ship staff), (e) Refit all the plates, (f) Pressure test the Heat exchanger and check for leakages, (g) Refit Heat exchanger on ship in position
Accumulator gas charging
Weak/ damaged MS Seamless pipes to be replaced. Size up to 30 mm OD pipe.
Replace O rings sizes: ID 10, 18, 22, 26, 28, 30, 38, 42, 50, 58 mm. Copper washers, pipe joints etc. wherever required.
Replace Copper Washers: ¼, ⅜, ½, ¾" & 1" BSP. Wherever required.
Check pipe clamps and replace, wherever necessary. Sizes: OD 20mm , 30 mm 40 mm & 50 mm
Check Clog indicators and service/ replace, as necessary.
Overhauling / setting of Manifold blocks - Work on all the blocks includes the following: (i) Remove the manifold from ship , (ii) Transport manifold to workshop, (iii) Check the manifold on test bed, (iv) Rectify the defects based on the defects, (v) Renew all the rubber parts (seals), (vi) Check the overhauled manifold on the test bed, (vii) Transport the manifold back to the ship, (viii) Check functioning of system onboard ship.
Power Unit Manifold block
Pump Filter Manifold Assembly
Neutral By pass Manifold
Saddle Winch brake manifold
Span wire/highline brake manifold
Inboard saddle winch Manifold
Span wire / Highline antislack Manifold
Antislack manifold assembly
Antislack motor manifold
Inhaul/ Outhaul Brake Manifold
Inhaul/Outhaul Motor Manifold
Sliding Trolley Block Auxiliary Manifold
Inboard Saddle winch manifold
Carryout overhaul of hydraulic pumps for winches. Overhaul to include following:- (a) Decouple pump from electric motor, (b) remove pump and shift to workshop, (c) Check pump's performance on test bed, (d) Dismantle pump and carry out gauging and survey of internal parts, (e) replace spares (supplied by NSRY (Karwar) /ship staff) as required and box up the pump, (f) Test pump on test bed for satisfactory performance, (g) Fit pump back on the ship and take trials, (h) records of all trials to be handed over to the ships staff
P6 Pump
P14 Pump
P24 Pump
Carryout overhaul of hydraulic motors for winches. Overhaul to include following:- (a) Decouple motor from electric pump, (b) remove motor and shift to workshop, (c) Check motor's performance on test bed, (d) Dismantle motor and carry out gauging and survey of internal parts, (e) replace spares as required (supplied by ship staff) and box up the motor, (f) Test motor on test bed for satisfactory performance, (g) Fit motor back on the ship and take trials, (h) records of all trials to be handed over to the ships staff
HMB 3.2 Motor
HMB 3.9 Motor
HMB 12B Motor
Antislack Motor
Antislack Motor M60F
Inboard Saddle Motor
ASD Hydraulic Motor
STBD Hydraulic Motor
Repair / Overhaul of Probe Receiver
Repair /Overhaul of Fuelling Probe
Maintenance Scheduled For Mechanical :- Half Yearly Maintenance :-
Check the condition of wire ropes of all the winches
Prepare record for inspection of wire rope
Check the tightness of all fasteners, replace the fasteners wherever necessary.
Check the clamp of wire ropes on winch
Inspect the Plummer blocks and record the same
Unwind complete wire ropes, clean and apply new grease and rewind
Yearly Maintenance :-
Check the condition of wire ropes of all the winches
Prepare record for inspection of wire rope
Check the tightness of all fasteners, replace the fasteners wherever necessary.
Check the clamp of wire ropes on winch
Inspect the Plummer blocks and record the same
Unwind complete wire ropes, clean and apply new grease and rewind
Replace the Sheaves/Plummer Block wherever required.
Cleaning of complete structural member of winch only and check for DP Test.
Maintenance Scheduled For Electrical:- Half Yearly Maintenance :-
Functional test of all Push Button Switches / Signals and all Indication Lamps of all Control Panels.
Functional test of all Emergency switches of all panels.
Functional test of all Control Panels
Functional test of all load cells and proximity /limit & instrumentation switches
Securing all load cells and proximity & instrumentation switches at various Junction box terminals.
Functional test of RAS FAS Winch Indicator.
Functional test of all Float Switches and Thermostats
Functions test of all filter clogging indicator
Securing all fuses
Functional test of all solenoid valves
Yearly Maintenance :-
Functional test of all Push Button Switches / Signals and all Indication Lamps of all Control Panels.
Functional test of all Emergency switches of all panels.
Securing all cables of push button switches, indication lamps and electrical joints
Functional test of all Control Panels
Functional test of all load cells and proximity /limit & instrumentation switches
Securing all load cells and proximity & instrumentation switches at various Junction box terminals.
Functional test of RAS FAS Winch Indicator.
Functional test of all Float Switches and Thermostats
Functions test of all filter clogging indicator
Functional test of all solenoid valves
Securing all fuses
Breakdown Maintenance.
Repair / Overhaul of Ram Tensioner Cylinder. The scope of work includes the following activities. (a) Remove the RAM tensioner cylinder from ship, (b) Transport the RAM tensioner cylinder to our works, (c) Dismantle the cylinder at our works, (d) Overhaul the cylinder depending on the problem. This may involve chrome plating - grinding of rod / honing of tube, (e) Renew all the seals, (f) Test the cylinder on test bed, (g) Transport cylinder back to the ship, (h) Fit cylinder in place on ship and take trials.
Repair/Overhaul of ASD Hyd. Cylinder.
Repair/Overhaul of Pump Servo Valve including removal and fitment.
Repair/Overhaul of pump displacement feedback potentiometer including removal and fitment
Repair/Overhaul of brake solenoid valve including removal and fitment
Repair/Overhaul of control solenoid valve including removal and fitment
Repair/Overhaul of ASD solenoid valve including removal and fitment
Pressure testing and charging of accumulators
Repair/Overhauling of ASD Sheave Assembly
Flushing of oil in hydraulic tank
Carry out serviceability check/calibration of RAM pressure sensor
Carry out serviceability check/calibration of RAM position sensor
Carryout serviceability check/calibration of pressure switch
Carry out serviceability check/calibration of Cable position sensor
Repair of solid/ liquid valve position proximity sensors including removal and fitment
Undertake routines of one number Rigs control cabinet. Routines to include following:- (a) Cleaning of all panels with alcohol, (b) Tightness checks of all terminals, (c) Check condition of all cables (d) Check condition of all JBs, (e) Cleaning of all JBs with alcohol, (f) Check conditions of LEDs, (g) Check functioning of PLC and control panel.
Unscheduled Maintenance Support (Mandays Charges) :- Deputation of specialists for defect identification only of the RAS FAS Equipment’s at Karwar. Charges for Per day (including Travelling and Stay charges)
Service Engineer / Technicians
Millennium Aero Dynamics Pvt Ltd (BID ID -3180197)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .