Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.1 LAccepted-AOC | ₹16.1 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SUNNY JOSEPH L1 |
|---|---|---|---|---|
| 1.00Biofertilizer plant | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 41.38 | cum | 335.7 ₹13,889.59 Lowest |
| 1.00 | OD133237/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size
in cement mortar 1:6 for foundation and basement including all cost of materials,
labour charges etc. (MOD 50.6.7.1 of DAR) | 4.52 | cum | 6,496.02 ₹29,375 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.51 | cum | 7,404.03 ₹85,220.39 Lowest |
| 1.00 | 11.19.1:Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand):Light shade pigment using white cement | 10.08 | sqm | 1,515.9 ₹15,280.27 Lowest |
| 1.00 | OD133108/2025-2026: Laterite neatly dressed stones of size 35x20x20cm in cement mortar 1:6 for
foundation
and basement or nearest size in cement mortar 1:6 for foundation and basement
including all cost of
materials, labour charges etc | 1.56 | cum | 6,815.1 ₹10,631.56 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 36.32 | cum | 297.24 ₹10,794.57 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 29.4 | sqm | 360.41 ₹10,596.05 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.11 | cum | 9,780 ₹1,37,976.24 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 67.2 | sqm | 941.31 ₹63,256.03 Lowest |
Tender Value
₹16.1 L
EMD Value
₹40,242
Closing Date
30 Aug 2025, 6:00 pmClosed
ASSISTANT ENGINEER
office of the assistant executive engineer lid and ew subdivision panoor
panoor bp annual plan project no.61/25-26-building construction for bio fertilizer unit-General Civil Work
2025_LSGD_777676_2
AE/PBP/1-2025-26/AP
Open Tender
Civil Works - Buildings
Item Rate
180 days
MOKERI VALLIYAYI
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹40,242
Yes
28 Jul 2026
22 Aug 2025
1 Sept 2025
22 Aug 2025
30 Aug 2025
22 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1300191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .