| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC | ₹14.1 L Quoted ₹14.4 L | L1 | Accepted-AOC L1 Party |
| 2 | L2₹18.2 L+₹3.8 L (26.5%)Rejected-AOC | ₹18.2 L+₹3.8 L (26.5%) | L2 | Rejected-AOC L2 Party |
Tender Value
₹10.1 L
EMD Value
₹25,330
Closing Date
26 Sept 2022, 3:00 pmClosed
HOU(T)
KMML, CHAVARA
Chipping,PCC above soling, RCC for footing, Encasing steel sections in RCC, Plastering,epoxy painting, scaffolding
2022_KMML_506979_1
KMML/TP/M/C/T/06/2022, Dtd 05/09/2022
Open Tender
Civil Works - Others
Item Rate
120 days
KMML, CHAVARA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
₹25,330
23 Dec 2022
9 Sept 2022
27 Sept 2022
9 Sept 2022
26 Sept 2022
9 Sept 2022
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Supplying and filling in plinth with red earth under floors, including watering, ramming consolidating and dressing complete.
Soling with rough stone of size 200 mm, well packed and filling voids with stone chips and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:<br>1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size).Cement supplied by KMML.
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Providing and laying in position specified grade of reinforced cement concrete(precast), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:<br>1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size(Excluding cost of cement)
Encasing rolled steel sections, in beams and columns with reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 12.5mm/20 mm nominal size) upto 16 meter from GL as per the direction of Engineer in charge, excluding cost of all scaffolding's, centering and shuttering, finishing, complete (reinforcement TMT bars and cement shall be issued by the company free of cost)
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete .Thermo - Mechanically Treated bars of grade Fe-500D or more (TMT steel bars shall be supplied by company)
Chemical plastering from 0-10 m heightProviding, mixing and applying chemical plastering by SBR polymer (of approved make) modified Cement mortar in proportion of 1:3 (1 cement: 3 graded coarse sand with polymer minimum 2% by wt. of cement used) for a height of 0 to 10m level as per specifications and directions of Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument
Chemical plastering from 10-13 m heightProviding, mixing and applying chemical plastering by SBR polymer (of approved make) modified Cement mortar in proportion of 1:3 (1 cement: 3 graded coarse sand with polymer minimum 2% by wt. of cement used) for a height of 10 to 13 m level as per specifications and directions of Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument
Chemical plastering from 13-16 m heightProviding, mixing and applying chemical plastering by SBR polymer (of approved make) modified Cement mortar in proportion of 1:3 (1 cement: 3 graded coarse sand with polymer minimum 2% by wt. of cement used) for a height of 13 to 16m level as per specifications and directions of Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work
Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
1Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
Labour charges for unskilled worker for chipping, cleaning, earth work excavation, dismantling brick/carpentary work,uprooting overgrowth from the building and unforeseen work if any.<br>
U. AZEEZKUNJU
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .