| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC TEHRI G | DEHRADUN | UTTARAKHAND | 248008 | ₹20.4 L | L1 | Accepted-AOC Qualified |
| 2 | L2₹21.9 L+₹1.5 L (7.36%)Rejected-Finance NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | ₹21.9 L+₹1.5 L (7.36%) | L2 | Rejected-Finance Not Qualified |
| 3 | L3₹24.5 L+₹4.1 L (20.2%)Rejected-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | ₹24.5 L+₹4.1 L (20.2%) | L3 | Rejected-Finance Not Qualified |
Tender Value
Refer Docs
EMD Value
₹62,000
Closing Date
10 Oct 2022, 2:00 pmClosed
SE
EDC TEHRI
Construction of 02 No. Transformer plinth and other misc. Civil Works at 33/11 KV S/s Lambgaon under EDSD Pratap Nagar
2022_UPCL4_50187_1
31/EDCT/2022-23
Open Tender
Civil Works
Item Wise
60 days
Pratap Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE
₹62,000
27 Jul 2023
1 Oct 2022
11 Oct 2022
1 Oct 2022
10 Oct 2022
1 Oct 2022
Electrical Items :
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5cm in width as well as 10sqm on plan including disposal of excavated earth pole upto 50m anf lift upto 1.5m, disposed soil to be levelled and neatly dressed.
For Switchyard ((NO.=2*1),L=5.50,B=2.00,H=0.00) = 22Qty
For Double Pole Plinth ((NO.=1*1),L=15.00,B=2.00,H=0.00) = 30Qty
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., upto floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement: 1½ coarse sand: 3graded stone aggregate 20mm nominal size). (No.=4,L=3.00,B=3.00,H=0.15)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all work up to plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size).
For Retaining Wall ((NO.=2*1),L=5.50,B=2.00,H=0.10) = 2.200 CUM
For Retaining Wall ((NO.=1*1),L=15.00,B=2.00,H=0.10) = 3.00 CUM
For Transformer Plinth ((NO.=2*2),L=3.92,B=0.50,H=0.10) = 0.780 CUM
For Transformer Plinth ((NO.=2*2),L=3.00,B=0.50,H=0.10) = 0.600 CUM
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- all work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size).
For Top of Retaining Wall ((NO.=1),L=15,B=0.60,H=0.05) = 0.450 Sqm.
For Top of Retaining Wall ((NO.=2),L=5.50,B=0.60,H=0.05) = 0.330 Sqm.
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level. (using cold twisted bars). (2*3*26*3.87*0.89Kg/R-m)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cemant : 4 coarse sand)
For Transformer Plinth (02 Nos.) ((NO.=4),L=3.92,B=0.46,H=0.65) = 4.688 CUM
For Transformer Plinth (02 Nos.) ((NO.=4),L=3.00,B=0.46,H=0.65) = 3.588 CUM
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
For Transformer Plinth (02 Nos.) ((NO.=4),L=3.92,B=0.46,H=2.55) = 18.393 CUM
For Transformer Plinth (02 Nos.) ((NO.=4),L=3.00,B=0.46,H=2.55) = 14.076 CUM
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concreate 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at plinth level with cement mortar 1:6 (1 cement : 6 coarse sand).
For R. R. Wall ((NO.=1),L=15.00,B=1.95,H=4.00) = 76.500 CUM
For R. R. Wall ((NO.=2),L=5.50,B=1.95,H=4.00) = 56.100 CUM
For Transformer Plinth inside (02 Nos.) ((NO.=2),L=3.00,B=3.00,H=2.55) = 45.900 CUM
12mm cement plaster finished with a floating coat of neat cement of mix : 1:3 (1 cement : 3 coarse sand)
For Transformer Plinth ((NO.=2*4),L=3.92,B=0.0,H=3.00) =94.08 Sqm
Supply of stone for masonry work ((NO.=1)
Supplying and stacking at site. Good Earth
For Switchyard ((NO.=1*1),L=15.00,B=5.50,H=3.00) = 247.500 CUM
Deduction for Transformer Plinth ((NO.=1*1),L=3.92,B=3.92,H=3.00) = -46.099CUM
Supply of belder for miscellaneous Civil Work (No.=1)
MS SHYAM SINGH
M/S R. B. ELECTRICALS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .