Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹52.5 LAccepted-AOC | ₹52.5 L | 1 | Accepted-AOC L1 Qualified |
| 2 | 2₹58.6 L+₹6.0 L (11.5%)Rejected-Finance WARD NO 19 BRAHMNAGAR GAFI NO 2 ROBERTSGANJ DIST SONBHADRA | ROBERTSGANJ | SONBHADRA | UTTAR PRADESH | ₹58.6 L+₹6.0 L (11.5%) | 2 | Rejected-Finance 2nd lowest |
| 3 | 3₹60.0 L+₹7.5 L (14.3%)Rejected-Finance 104 DOON ROYAL APPARTMENTS SEWLA KALAN DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹60.0 L+₹7.5 L (14.3%) | 3 | Rejected-Finance 3rd lowest |
| 4 | 4₹62.6 L+₹10.0 L (19.1%)Rejected-Finance 379 MOHIT NAGAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹62.6 L+₹10.0 L (19.1%) | 4 | Rejected-Finance 4th lowest |
| 5 | 5₹67.1 L+₹14.6 L (27.8%)Rejected-Finance 254 DOON VIHAR JAKHAN RAJPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹67.1 L+₹14.6 L (27.8%) | 5 | Rejected-Finance 5th lowest |
| Sl No | Description | Qty | Unit | M.R.ENGINEERS AND CONTRACTORS L5 | M/s S.P. Agarwal and Co. L3 | Ms Ankita Construction L4 | S. M. Construction L2 | SHREE JEE BUILDERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Over Head Tank 'Supply of all materials, T&P etc.and construct an RCC over head tank of following size with RCC two column staircase & 1 m wide balcony, G.I. pipes railing consisting of 3 rows of 20 mm dia. G.I. pipe and angle iron posts around balcony & at the dome periphery, M.S. ladder from balcony to top of tank and inside the tank, supply and fixing M.H. cover with locking device, 1.2m dia ventilator, lightening conductor, water level indicator, supply and fixing of pipes, CI D/F pines, supply and fixing M.S. clamps with RCC column 40mm PCC 1:2:4 over 80 mm PCC 1:4:8 in apron, 150 mm semicircular drain around the tank, escape channel of 20 m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of apex paint and testing of tank for water tightness and also including cost of supply and fixing of all necessary pipes and valves etc. all complete with inlet, outlet, overflow and washout pipes with bypass arrangement and necessary fittings and specials and testing of bearing capacity. | ||||||||
| 1.01Inlet Pipe DI,D/F- 150 mm | ||||||||
| 1.02Outlet Pipe DI,D/F- 250 mm | ||||||||
| 1.03Over flow DI,D/F- 250 mm | ||||||||
| 1.04Wash out DI,D/F- 100 mm | ||||||||
| 1.05 | 18 m staging (500 KL) | 500 | KL | 12,400 ₹62,00,000 | 11,151 ₹55,75,500 | 11,700 ₹58,50,000 | 10,900 ₹54,50,000 | 9,780 ₹48,90,000 Lowest |
| 2.00 | Supply of all materials,labour and construction of pump house as per departmental drawing design. | 1 | Nos. | 5,02,000 ₹5,02,000 | 4,24,001 ₹4,24,001 | 4,00,000 ₹4,00,000 | 4,00,000 ₹4,00,000 | 3,56,224.4 ₹3,56,224.4 Lowest |
| 3.00 | Construction of Boundary Wall including all Material Labour as per Departmental Drawing Design. | 1 | Mtr | 9,777 ₹9,777 | 5,421 ₹5,421 | 5,400 ₹5,400 Lowest | 6,000 ₹6,000 | 5,500 ₹5,500 |
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
22 Jun 2021, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer Construction Division Uttarakhand Peyjal Nigam Haridwar
CONSTRUCTION WORK OF OHT PUMP HOUSE AND BOUNDARY WALL AND ITS APPUTEMENT WORKS OF ATMALPUR BONGLA BLOCK BAHADARABAD
2021_MDPEY_33267_1
Letter No. 1252/NIVIDA/430, dated 25.05.2021
Open Tender
Civil Works
Item Rate
180 days
Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Executive Engineer Construction Division UKPJN
₹1.5 L
Haridwar
8 Aug 2025
7 Jun 2021
24 Jun 2021
7 Jun 2021
22 Jun 2021
11 Jun 2021
9 Jun 2021
Amount
Over Head Tank 'Supply of all materials, T&P etc.and construct an RCC over head tank of following size with RCC two column staircase & 1 m wide balcony, G.I. pipes railing consisting of 3 rows of 20 mm dia. G.I. pipe and angle iron posts around balcony & at the dome periphery, M.S. ladder from balcony to top of tank and inside the tank, supply and fixing M.H. cover with locking device, 1.2m dia ventilator, lightening conductor, water level indicator, supply and fixing of pipes, CI D/F pines, supply and fixing M.S. clamps with RCC column 40mm PCC 1:2:4 over 80 mm PCC 1:4:8 in apron, 150 mm semicircular drain around the tank, escape channel of 20 m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of apex paint and testing of tank for water tightness and also including cost of supply and fixing of all necessary pipes and valves etc. all complete with inlet, outlet, overflow and washout pipes with bypass arrangement and necessary fittings and specials and testing of bearing capacity.
Inlet Pipe DI,D/F- 150 mm
Outlet Pipe DI,D/F- 250 mm
Over flow DI,D/F- 250 mm
Wash out DI,D/F- 100 mm
18 m staging (500 KL)
Supply of all materials,labour and construction of pump house as per departmental drawing design.
Construction of Boundary Wall including all Material Labour as per Departmental Drawing Design.
S. M. Construction
M/s S.P. Agarwal and Co.
Ms Ankita Construction
M.R.ENGINEERS AND CONTRACTORS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .