Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | L1 | Accepted-Finance reasonable | |
| 2 | L2₹1.4 L+₹300 (0.22%)Rejected-Finance | L2 | Rejected-Finance Not reasonable | |
| 3 | L3₹1.4 L+₹600 (0.44%)Rejected-Finance | L3 | Rejected-Finance Not reasonable |
Tender Value
Refer Docs
Closing Date
4 Mar 2022, 4:00 pmClosed
SAURABH GUPTA
GE (WEST) COLABA
REPAIR/REPLACEMENT OF UNSERVICEABLE PARTS OF VEH BA NUMBER 14D194006N (Eicher) UNDER GE(WEST) COLABA MUMBAI
2022_MES_510538_1
3007B11
Limited
Miscellaneous Services
Supply
60 days
GE WEST COLABA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
8 Mar 2022
25 Feb 2022
5 Mar 2022
25 Feb 2022
4 Mar 2022
25 Feb 2022
Amount
REPAIR/REPLACEMENT OF UNSERVICEABLE PARTS OF VEH BA NUMBER 14D194006N (Eicher) UNDER GE(WEST) COLABA, MUMBAI (a) Taking the vehicle at repair centre (work shop) thoroughly checking the suspension system and carry out the following repair/replacement of Eicher 10.75 unit as per existing model (i) Silencer mufler& tail pipe - 01, (ii) Differential assembly – 01 No (iii) Wheel bearing rear – 04 Nos, (iv) Brake linear – 02 Set, (v) Steering ball joint – 02 Nos, (vi) Tie rod bearing – 01 No, (vii) Steering tie rod centre line assembly – 01 No, (viii) Wheel balancing and alignment – 01 Job (b) Taking down diesel tank cleaning thoroughly and refixing after cleaning complete – 01 Job (i) Fuel filter – 01 No, (ii) Oil Filter – 01 No, (iii) Engine Oil 20W40 – 08 Ltr, (iv) Replacement of hose pipe – 01 No (c) Taking down gear axle system, replacement of worn out parts and refixing after repair – 01 Job (i) Cross bearing – 03 Nos, (ii) Mounting bearing – 01 No, (iii) Poplar bearing – 01 Set (d) Taking down wheels, cleaning, greasing, replacing unserviceable parts, refixing/testing complete – 04 Job (i) Brake cylinder – 08 Nos, (ii) Master brake cylinder – 01 No, (iii) Packing – 01 Set, (iv) Brake linear – 02 Set, (v) Hydraulic break booster assembly – 01 Set (e) Tacking down clutch plate assembly, replacing unserviceable parts, refixing complete – 01 Job (i) Clutch plate and pressure plate assembly – 01 Set, (ii) Clutch Cylinder – 02 Nos, (iii) Clutch bearing – 01 No, (iv) Packing – 01 Set (f) Checking of electrical system and replacement of following unserviceable parts – 01 Job (i) Ignition switch assembly – 01 No, (ii) Side indicator assembly – 02 Nos Auth:- CWE (A) Mumbai letter No 4053/W/31/E4 dt 30 Dec 21 Chargeable: 01/495/04
JAISON ENG CONSTRUCTION AND SUPPLIER
Netcom Systems
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .