| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹3.1 Cr−₹47.6 L (13.2%)Accepted-Finance NALAKATH HUB AREECODE MALAPPURAM 673639 | MALAPPURAM | KERALA | 673639 | ₹3.1 Cr−₹47.6 L (13.2%) | L2 | Accepted-Finance Financiallly Qualified |
| 2 | L1₹3.6 CrRejected-Finance | ₹3.6 Cr | L1 | Rejected-Finance Financiallly Qualified |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not submitted required documents |
| Sl No | Description | Qty | Unit | NALAKATH INFRASTRUCTURE LLP L1 | ALBIN MATHEW L2 |
|---|---|---|---|---|---|
| 1.00CREMATORIUM CIVIL WORKS | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 129.1 | cum | 387 ₹49,960.15 Lowest | 430 ₹55,511.28 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 41.08 | cum | 141 ₹5,791.72 Lowest | 157 ₹6,448.93 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 84.77 | cum | 342 ₹28,989.63 Lowest | 381 ₹32,295.47 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,215 | kilogram | 119 ₹5,01,585 Lowest | 134 ₹5,64,810 |
| 1.00 | OD256079/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work upto plinth level Concrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | 12.15 | cum | 10,000 ₹1,21,470 Lowest | 13,280 ₹1,61,312.16 |
| 1.01 | OD256080/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | 6.44 | cum | 10,200 ₹65,677.8 Lowest | 15,721 ₹1,01,227.52 |
| 1.01 | OD313413/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | 17.31 | cum | 8,800 ₹1,52,345.6 Lowest | 13,066 ₹2,26,198.59 |
| 1.01 | OD256080/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | 9.57 | cum | 9,200 ₹88,034.8 Lowest | 15,508 ₹1,48,396.05 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 13.25 | sqm | 415 ₹5,498.75 Lowest | 463 ₹6,134.75 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Apr 2026, 4:00 pmClosed
Managing Director
IMPACT Kerala Ltd TVPM
Please refer Tender documents
2026_IKL_844135_1
IKL/CTM/2025/15
Open Tender
Civil Works - Buildings
Item Rate
365 days
Karukutty GP, Ernakulam District
Please refer Tender documents
6 documents required · 6 mandatory
₹9,800
₹1 L
1 Sept 2026
10 Mar 2026
8 Apr 2026
10 Mar 2026
6 Apr 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CREMATORIUM CIVIL WORKS | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.4 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.003 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.005 | OD256079/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work upto plinth level Concrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | - | cum | - | - |
| 1.006 | OD256080/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | - | cum | - | - |
| 1.007 | OD313413/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | - | cum | - | - |
| 1.008 | OD256080/2025-2026:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All work above plinth level upto floor V levelConcrete of M30 grade with minimum cement content of 350 kg /cum (Excess or less cement used as per design mix will not be payable or recoverable separately ) | - | cum | - | - |
| 1.009 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
KarukuttyGCSBD.pdf
Tender Documents • 1.41 MB
PaymentDeclaration.pdf
Other Document • 0.24 MB
Drawings.pdf
Additional Documents • 12.81 MB
BOQ_1425168.xls
BOQ • 0.52 MB
DateExtension.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .