| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 CrAdmitted-Finance QUADIRIYA MANZIL MARA CHENGALA KASARAGOD | CHENGALA | KASARAGOD | KERALA | ₹27.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹30.3 Cr+₹2.7 Cr (9.71%)Admitted-Finance 34 426 H 1ST FLOOR LP BUILDING NEAR ST JOSEPH CHURCH THURAKKAL BAPPUTTY ROAD MANJERI MALAPPURAM 676121 | MANJERI | MALAPPURAM | KERALA | 676121 | ₹30.3 Cr+₹2.7 Cr (9.71%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TAN-B CONSTRUCTIONS L2 | M S BUILDER PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00Appendix A :- Bridge Proper | |||||
| 1.00 | OD52938/2023-2024:Bored cast-in -situ M 35 grade RCC pile of 1200 mm dia, using Batching plant, Transit mixer and concrete pump excluding Reinforcement complete as per drawing and technical specifications and removal of excavated earth all lifts and lead upto 1000m including socketing in hard rock for designed depth, chipping excess length of pile and conducting all mandatory and routine pile load test as per MORTH specification. | 2,968 | metre | 18,500 ₹5,49,08,000 | 15,000 ₹4,45,20,000 Lowest |
| 1.00 | OD125787/2023-2024:Providing Steel Liner 6 mm thick for pile foundation including Fabricating and Setting out as per Detailed Drawing. | 35.49 | MT | 1,25,000 ₹44,36,750 Lowest | 1,25,000 ₹44,36,750 Lowest |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 434.05 | cum | 92 ₹39,932.78 Lowest | 94 ₹40,800.89 |
| 1.00 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) | 29.39 | cum | 8,600 ₹2,52,745.4 | 8,000 ₹2,35,112 Lowest |
| 1.00 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 385.72 | cum | 9,000 ₹34,71,498 Lowest | 13,000 ₹50,14,386 |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 504.08 | MT | 1,06,000 ₹5,34,32,162 | 96,000 ₹4,83,91,392 Lowest |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 366.49 | cum | 10,000 ₹36,64,910 Lowest | 13,000 ₹47,64,383 |
| 1.01 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 52.35 | MT | 1,06,000 ₹55,49,100 | 98,000 ₹51,30,300 Lowest |
| 1.01 | 14.1F.1.B:"Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid slab/voided slab super-structure - Height 5m to 10m | 359.09 | cum | 12,000 ₹43,09,080 Lowest | 14,000 ₹50,27,260 |
Tender Value
₹28.2 Cr
EMD Value
₹5 L
Closing Date
11 Mar 2026, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2026_KRFB_840628_1
PWD/KR/TR/107488/2021_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
545 days
Malappuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
7 Aug 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A :- Bridge Proper | |||||
| 1.001 | OD52938/2023-2024:Bored cast-in -situ M 35 grade RCC pile of 1200 mm dia, using Batching plant, Transit mixer and concrete pump excluding Reinforcement complete as per drawing and technical specifications and removal of excavated earth all lifts and lead upto 1000m including socketing in hard rock for designed depth, chipping excess length of pile and conducting all mandatory and routine pile load test as per MORTH specification. | - | metre | - | - |
| 1.002 | OD125787/2023-2024:Providing Steel Liner 6 mm thick for pile foundation including Fabricating and Setting out as per Detailed Drawing. | 1 | MT | - | - |
| 1.003 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 0.8 | cum | - | - |
| 1.004 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) | 1 | cum | - | - |
| 1.005 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 0.8 | cum | - | - |
| 1.006 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 0.8 | MT | - | - |
| 1.007 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 0.4 | cum | - | - |
| 1.008 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | - | MT | - | - |
| 1.009 | 14.1F.1.B:"Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For solid slab/voided slab super-structure - Height 5m to 10m | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 4.28 MB
BOQ_1417782.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .