| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC KERALA KL KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.6 L+₹2.0 L (9.98%)Rejected-AOC 16061872 RAMAKRISHNAN M K 1606 SUB TREASURY PERAMBRA | L2 | Rejected-AOC L2 | |
| 3 | L3₹23.1 L+₹3.4 L (17.5%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹23.3 L+₹3.6 L (18.4%)Rejected-AOC KAYANNA BAZAR KAYANNA P O KOZHIKODE | L4 | Rejected-AOC L4 | |
| 5 | L5₹23.6 L+₹3.9 L (20.0%)Rejected-AOC KAMPURATH HOUSE KAKKODI P O KOZHIKODE 673611 | KOZHIKODE | KERALA | 673611 | L5 | Rejected-AOC L5 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
24 Apr 2023, 6:00 pmClosed
Executive Engineer,MI DVN KKD
Office of theExecutive Engineer,Minor Irrigation Division, Kozhikode
GENERAL-MI Class I Haritha Keralam - - Construction of VCB at Kadukkanthara thodu in Kayakkodi Panchayath,Nadapuram LAKozhikode District-General Civil Work
2023_Irrig_571868_1
IRR/IA/TR/9220/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
kayakkodi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
2 Jun 2023
13 Apr 2023
27 Apr 2023
13 Apr 2023
24 Apr 2023
13 Apr 2023
Amount
Construction of VCB
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
60.4:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
BINOY LUKOSE
P.SURESH
KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251
devanand
Bidder Name
devanand
BINOY LUKOSE
KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251
P.SURESH
JOSEPH SEBASTIAN
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_844261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .