Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 CrAdmitted-Finance | ₹19.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹22.1 CrAdmitted-Finance 18 SANKAR BOSE ROAD KOLKATA 700 027 W B | KOLKATA | WEST BENGAL | 700027 | ₹22.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹22.5 CrAdmitted-Finance | ₹22.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹23.4 CrAdmitted-Finance | ₹23.4 Cr | L4 | Admitted-Finance |
| 5 | L5₹23.8 CrAdmitted-Finance | ₹23.8 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DASCON SOURAV COMMERCIAL PVT LTD L1 | M/S ANAND KUMAR SINGHANIA L4 | TRIBENI CONSTRUCTIONS LIMITED L6 | M.S. ENTERPRISE L2 | M/s JYOTI SARUP MITTAL L5 | KUMAR CREATIONS PRIVATE LTD L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | TOTAL PRICE FOR ENTIRE SCOPE OF WORK AS PER TENDER NO. BHEL/CPC/RTP/ENB_1/26/002 for -
PACKAGE-A- Immovable Items of manufacturing, supply, receipt at site, Civil & Architectural works including design, erection, internal electrification, painting & finishing works etc. and handing over to site of Removable/ Re-Erectable type Pre-engineered site office, Pre- fabricated Steel Closed Storage Sheds, Intermediate Closed Storage Shed, Development of storage yard with internal roads and drains, hard crusting, supply of precast concrete sleepers, Fencing and Gate for storage yard and BHEL Office area, Supply and installation of Weigh Bridge, Manufacturing, Supply, Receipt at Site, Erection, etc. and handing over to site Field Porta Cabin, High Mast Lighting Tower Foundation, Civil and architectural work of Safety park ,Civil Lab , Mess Building, Construction water storage sump etc. at 2x660 MW RAGHUNATHPUR TPS PH-II, WEST BENGAL.
PACKAGE-B- Movable Items of manufacturing, supply, receipt at site, Civil & Architectural works including design, erection, internal electrification, painting & finishing works etc. and handing over to site of Removable/ Re-Erectable type Pre-engineered site office, Pre- fabricated Steel Closed Storage Sheds, Intermediate Closed Storage Shed, Development of storage yard with internal roads and drains, hard crusting, supply of precast concrete sleepers, Fencing and Gate for storage yard and BHEL Office area, Supply and installation of Weigh Bridge, Manufacturing, Supply, Receipt at Site, Erection, etc. and handing over to site Field Porta Cabin, High Mast Lighting Tower Foundation, Civil and architectural work of Safety park, Civil Lab , Mess Building, Construction water storage sump etc. at 2x660 MW RAGHUNATHPUR TPS PH-II, WEST BENGAL. | 1 | Total Price | 19,05,35,000 ₹19.1 Cr | 23,40,00,000 ₹23.4 Cr | 27,25,33,520 ₹27.3 Cr | 22,10,00,000 ₹22.1 Cr | 23,79,88,888 ₹23.8 Cr | 22,50,00,000 ₹22.5 Cr |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
3 May 2025, 10:00 amClosed
Manager SCT
8th Floor, BHEL Sadan, Sector 16A, Noida
Enabling Works containing Open Storage Yard, Office Complex, Closed Storage Shed, Safety Park, Civil Quality Lab, Mess Building, etc. at 2x660 MW Raghunathpur TPS Phase-II, West Bengal
2025_BHEL_47459_1
BHEL/CPC/RTP/ENB_1/26/002
Open Tender
Power/Energy Projects/Products
240 days
2X660 MW DVC Raghunathpur Phase II
As per NIT
7 documents required · 7 mandatory
₹0
₹20 L
BHEL SADAN NOIDA
20 Mar 2026
18 Apr 2025
3 May 2025
18 Apr 2025
3 May 2025
18 Apr 2025
18 Apr 2025 - 23 Apr 2025
22 Apr 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TenderDocuments.rar
Tender Documents • 24.63 MB
BOQ_50721.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid