Tender Value
₹14.9 L
EMD Value
₹29,800
Closing Date
4 Mar 2025, 6:00 pmClosed
EE(C), CD-I, Hyderabad
Executive Engineer (civil), BSNL civil division-I, HYDERABAD 7th floor, BSNL Bhavan, Adarshnagar, Hyderabad-500063
Construction of 40 M Ground Based Tower including RCC foundation, erection of tower with available tower material at stores and painting at BSNL Compound, KOLLAPUR(MB5104) in Mahabubnagar OA , MEDAK BA
2025_BSNL_227930_1
NIT No. 26 /NIT/CECTSCZ/HYD/2025
Open Tender
Civil Works
Item Rate
90 days
Kollapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Accounts Officer (Cash), O/o GMT, BSNL Medak BA
₹29,800
6 Mar 2025
24 Feb 2025
6 Mar 2025
24 Feb 2025
4 Mar 2025
24 Feb 2025
24 Feb 2025 - 4 Mar 2025
Amount
Sub-Head : Earth Work Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge.
Ordinary rock
Hard rock (blasting prohibited)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
All kinds of soil
Ordinary or hard rock.
Sub-Head : Concrete Work Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Sub-Head : Reinforced Cement Concrete Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Sub-Head : Masonry Work Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundations and plinth in.
Cement mortar 1:4 (1 cement : 4 coarse sand)
Sub-Head : Steelwork Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Item is operated for Horizontal gantry)
Sub-Head : Finishing 12 mm cement plaster of mix :
1:6 (1 cement: 6 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.(Item is operated for Horizontal gantry)
Tower Work Labour charges for orienting and fixing assembly of 8 nos 32 mm dia anchor bolts in each of the 4 legs /pedastals of tower with the help of template, base plate and other base arrangements . A total of 32 numbers anchor bolts shall be oriented and fixed for each tower as per drawings of Genetic requirements No GR TWR- 12/01 June 2005. Rate includes cost of necessary scaffolding arrangement etc. all complete as directed by the Engineer -in-charge
Making and supplying at site, anchor bolts for fixing base of tower, manufactured from EN 8 Steel and of 32mm dia mild steel bar of required length conforming to IS:2062, threaded at top upto 150mm length and welded with lugs made from 100x100x10mm thick mild steel plate at 50mm from bottom including suitable hexagonal nuts 2 nos. (Nuts & Checknuts) and MS spring washer etc. all complete as directed by the Engineer-in-charge.
Erection of 40 mtrs height Ground based structural Steel Tower as per approved Genetic requirements No.GR TWR-12/01 June 2005 with all its necessary components Viz climbing ladder, platforms with railing and fixing with bolts, nuts, plain and spring washers. Cost includes necessary welding and alteration of any mismatching holes to the members wherever required complete in all respect as per direction of the Engineer -in-charge (NOTE: Rate includes cost of all operations involved in hoisting and erection of tower including hire and labour charges of tolls, plants and machineries all insurance, safety measures , offering and making necessary arrangements for acceptance testing, all incidental charges etc. all complete ) Tower material shall be supplied by department at site at no cost. (Weight about 8.30 MT) Insurance document for labour deployed shall be submitted along with the bill, failing which recovery of Rs.10000/- will be deducted from the bill
Applying priming coat with one coat of ready mixed Red oxide Zinc Chromate primer or equivalent of approved brand and manufacture for 40m tower (weight about 8.30MT)
Applying priming coat with one coat of Etch primer (BISON wash primer or equivalent) approved brand and manufacture for 40m tower (weight about 8.30MT).
Painting with High gloss synthetic enamel paint of approved brand and manufacture to give an even shade for 40m tower (weight about 8.30MT). a) Two or more coats on new work.
Providing and fabrication to required sizes of Structural steel work riveted, bolted or welded in build up sections, trusses and framed work, consisting of Angles, Flats, Plates and tubes including galvanisation, nuts & bolts per approved drawing. The galvanizing shall be as per IS: 4759 with average mass of zinc coating of 610 gm/sqm (approximately 85 micron). The steel sections shall be of M.S.grade 'A' as per IS: 2062. Cost of galvanization is inclusive. The payment shall be made as per the standard structural steel tables for the bare steel sectional weights. All complete as directed by the Engineer-in-Charge (Item is operated for any missing tower members including nuts and bolts of grade 5.6 or higher grade all as specified in the tower drawing with plain & spring washer as directed by Engineer in charge)
Extra for galvanising (of thickness not less than 120 microns) on M.S angles , flats, gussets plates, bolts, nuts and other fasteners etc., complete as per the tower drawing and as per directions of Engineer in charge.( Item is operated for Gantry etc. )
Mechanical transportation of dismantled 40 m GBT tower members comprising Galvanised Structural steel Tubes, MS angles , flats , plates, pipes nuts & bolts etc. of varying sizes and lengths and BTS shelter materials from stores at TE compound, Gadwal to Kollapur site (approx. distance is about 95 Km.). The entire lot of tower members shall be transported in a single lot . The Job includes cost of collection of all members with required lead, loading and unloading and stacking/depositing the tower members at the PROPOSED site of errection i.e. Kollapur TE compound site including all incidental charges etc. All complete, as directed by engineer in charge.
Within the lead of 95.00 Km.
Segregation and stacking of tower material at stores required for erection of 40 M Ground based NBL Tower in orderly manner as per bill of materials /erection drawings No.GR TWR - 12/01 June 2005 from a lot of tower materials( more than one tower) all complete as directed by the Engineer -in-charge.
K Naidu Babu (BID ID -824961)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .