Loading…
Loading…
22 results • Latest
SDF 2025-26 Grant-Construction of New School Complex Building to ZPHS and MPPS Schools at Kondareddypally Village of Vangoor Mandal, Nagarkurnool District , Estimate Cost Rs.600.00lakhs
Civil Items -Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges and contractors profit & over heads but excluding GST & seignorage charges etc., complete. Mechanical Means Upto 3 m depth
Construction of Major interconnecting Roads, link Roads, slip Roads and Drains in Achampet Municipality Under Nagarabhivrudhi Grants.(2nd Call)
Development of Park in Achampet Municipality under NAGARABHIVRUDHI Grants(2nd Call)
MGKLIS Dismantling of damaged ventilation duct and supply, erection, testing and commissioning of new ventilation duct and all necessary auxiliaries - Repair of P and V system (90,000 CFM)
Air Distributeion items
Providing Chainlink Mesh Bit-1 (917 Mtrs), Bit-2 (1482 Mtrs), Bit-3 (727 Mtrs) = 3126 mtrs, for CA Land of Deccan Cement in Charakonda village at Charakonda beat and Section of Nagarkurnool Range, Achampet Division of Nagarkurnool District, ATR Cirlce
CRR 2024-25 Grant- Construction of HLB on Dundubhi Vagu at Sirsawada Village, Tadoor Mandal, Nagarkurnool District, Estimate Cost Rs.2020.00 Lakhs.
Bridge Portion- Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge. For Soils - Upto 3m depth