Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹28.0 L (15.7%)Admitted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | ₹2.1 Cr+₹28.0 L (15.7%) | L2 | Admitted-Finance |
| 3 | L3₹9.4 Cr+₹7.6 Cr (425.0%)Admitted-Finance | ₹9.4 Cr+₹7.6 Cr (425.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Spectrum Techno Consultants Pvt Ltd L3 | Casta Engineers Pvt Ltd L1 | Chaitanya Projects Consultancy Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | ||||||
| 2.00PROFESSIONAL Staff | ||||||
| 3.00 | Team Leader cum Senior Bridge Engineer | 4 | Man Months | 6,00,000 ₹24,00,000 | 1,20,000 ₹4,80,000 Lowest | 2,20,000 ₹8,80,000 |
| 4.00 | Bridge Structural Engineer | 2 | Man Months | 10,00,000 ₹20,00,000 | 1,00,000 ₹2,00,000 Lowest | 1,20,000 ₹2,40,000 |
| 5.00 | Highway cum Pavement Engineer | 4 | Man Months | 5,00,000 ₹20,00,000 | 1,00,000 ₹4,00,000 Lowest | 1,20,000 ₹4,80,000 |
| 6.00 | Material-cum-Geotechnical Engineer-Geologist | 4 | Man Months | 10,00,000 ₹40,00,000 | 75,000 ₹3,00,000 Lowest | 1,20,000 ₹4,80,000 |
| 7.00 | Senior Survey Engineer | 2 | Man Months | 5,00,000 ₹10,00,000 | 50,000 ₹1,00,000 Lowest | 1,20,000 ₹2,40,000 |
| 8.00 | Senior Geologist | 2 | Man Months | 5,00,000 ₹10,00,000 | 50,000 ₹1,00,000 Lowest | 1,00,000 ₹2,00,000 |
| 9.00 | Environmental Specialist | 2 | Man Months | 8,00,000 ₹16,00,000 | 50,000 ₹1,00,000 Lowest | 1,00,000 ₹2,00,000 |
| 10.00 | Quantity Surveyor/Documentation Expert | 2 | Man Months | 8,00,000 ₹16,00,000 | 50,000 ₹1,00,000 Lowest | 1,00,000 ₹2,00,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
16 Jan 2023, 3:00 pmClosed
Devender Kumar
NHIDCL HQ, New Delhi
Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of Up-gradation Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (Meghalaya) through Banglade
2022_NHIDC_724207_1
NHIDCL/HQ/DPR/ Hilli-Mahendraganj/2022
Open Tender
Consultancy
Item Rate
120 days
Meghalaya
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
16 Feb 2023
18 Nov 2022
17 Jan 2023
18 Nov 2022
16 Jan 2023
13 Dec 2022
19 Nov 2022 - 30 Nov 2022
2 Dec 2022
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
PROFESSIONAL Staff
Team Leader cum Senior Bridge Engineer
Bridge Structural Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer-Geologist
Senior Survey Engineer
Senior Geologist
Environmental Specialist
Quantity Surveyor/Documentation Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Assistant Bridge Engineer
Assistant Highway Cum Pavement Engineer
Assistant Material-cum-Geotechnical Engineer-Geologist
Survey Engineer
Assistant Quantity Surveyor/Documentation Expert
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed Costs)
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 4months each)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.
Net Work Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Chaitanya Projects Consultancy Private Limited
Spectrum Techno Consultants Pvt Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .