Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | MCCB, DC, 3 POLE, Rated Operational Voltage : 250V DC, Rated Operational Current : 20A , Rated Insulation Voltage: 690V DC, Type of release : Thermo magnetic, Ics equal to Icu equal to 5KA, pertaining to IS 13947-2/IEC 60947-2, Utilization Category-A, Suitable for 40C ambient temperature, Make: Havells, Loadline model(GN Frame) | BS ELECTRICALS | 1 | ₹3,056.20 |
| 2 | MCCB, DC, 3 POLE, Rated Operational Voltage : 250V DC, Rated Operational Current : 40A , Rated Insulation Voltage : 690V DC, Type of release Thermo magnetic, Ics equal to Icu equal to 5 KA, pertaining to IS 13947-2/IEC 60947-2, Utilization Category-A, Suitable for 40C ambient temperature, Make: Havells, Loadline model(GN Frame) | BS ELECTRICALS | 1 | ₹3,056.20 |
| 3 | MCCB, DC, 3 POLE, Rated Operational Voltage : 250V DC, Rated Operational Current : 75A , Rated Insulation Voltage : 690V DC, Type of release : Thermo magnetic, Ics equal to Icu equal to 5 KA, pertaining to IS 13947-2/IEC 60947-2, Utilization Category-A, Suitable for 40C ambient temperature, Make: Havells, Loadline model(GN Frame) | BS ELECTRICALS | 1 | ₹3,115.20 |
Tender Value
Refer Docs
Closing Date
28 Nov 2024, 12:00 amClosed
CE OM SLBHES SRISAILAM
Supply of required 20A, 40A & 75A rated, 3 pole, DC MCCBs for all the Main, Unit and GIS DC distribution boards at SLBHES, Srisailam Dam West, NagarKurnool (Dist) - 509326, TELANGANA
559352
E-12/24-25/CE/O&M /SLBHES/SLMW/DE/A&P/AE/P/S1
Goods
Telangana
7 Apr 2025
28 Nov 2024
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .