Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹48.2 L+₹4.4 L (9.99%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹50.8 L+₹7.0 L (16.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified | ||
| 5 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
₹43.8 L
EMD Value
₹87,558
Closing Date
5 Aug 2026, 1:00 pmClosed
Executive_Engineer_Kolkata_North_Division_PWD
O/O_Executive_Engineer_Kolkata_North_Division_PWD 166_10 BT Road Dunlop Kolkata_108
Restoration for Trail Trench Work at 8 nos locations from Palta IGWTP to Tallah TPS for the proposed Baranagar Ex to Barrackpore Metro corridor project under Kolkata North Division PWDte In the district of North 24 Pgs
2026_WBPWD_5017111_1
WBPWD/EE/KND/NIeT-09/2026-2027
Open Tender
CIVIL WORKS
Percentage
60 days
BT Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹87,558
Yes
24 Aug 2026
21 Jul 2026
7 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course
i) Depth upto 2000 mm | 89.04 | cum | 309.76 | ₹27,581.03 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Manual Means
Granular courses | 273.46 | cum | 582.01 | ₹1,59,156.45 |
| 3 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). | 633.9 | cum | 84.7 | ₹53,691.33 |
| 4 | Granular Sub-Base with Graded Material (Table:- 400-1)
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401
Rate per cum for grading-III Material | 66.78 | cum | 2,892.12 | ₹1,93,135.77 |
| 5 | Rate per cum for grading-II Material | 66.78 | cum | 2,786.01 | ₹1,86,049.75 |
| 6 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406. | 111.3 | cum | 2,982.18 | ₹3,31,916.63 |
| 7 | Water Bound Macadam Sub Base
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening. | 3.6 | cum | 2,665.15 | ₹9,594.54 |
| 8 | Prime Coat
Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to IS:8887 on prepared porous granular surface including clearing of road surface and spraying primer using mechanical means (Reference to MORT&H's specification clause 502).
i) On WMM/WBM surface @ 0.70-1.0kg /sqm. | 319.2 | sqm | 128 | ₹40,857.6 |
| 9 | Tack Coat
Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
ii)On Granular surface treated with primer @ 0.25kg-0.30 /sqm. | 319.2 | sqm | 25.24 | ₹8,056.61 |
| 10 | i)On bituminous surface @ 0.20kg0.3kg /sqm. | 638.4 | sqm | 23.36 | ₹14,913.02 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
2911iiason01122019.pdf
Tender Documents • 0.54 MB
AnnexureXnew.pdf
Additional Documents • 0.01 MB
BOQ_5087162.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .