Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC KARUKUNNATH HOUSE KANINADU PERINGALA ERNAKULAM DISTRICT 683565 | PERINGALA | ERNAKULAM | KERALA | 683565 | ₹14.1 L | L1 | Accepted-AOC LOWEST |
| 2 | Rejected-Technical KARUKUNNATH HOUSE KANINAD PERINGALA P O ERNAKULAM DISTRICT 682310 | ERNAKULAM | KERALA | 682310 | - | - | Rejected-Technical DISQUALIFIED |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | MUHAMMED ALSIFE K.S L1 |
|---|---|---|---|---|
| 1.00 | 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m
above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared and as directed by Engineer-incharge | 1,950 | sqm | 16.01 ₹31,219.50 |
| 2.00 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, and as directed by Engineer-incharge.- All kinds of soil | 2,300 | cum | 226.71 ₹5.2 L |
| 3.00 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials for the proper completion of work and as per the direction of Engineer in charge. All kinds of soil | 2,300 | cum | 115.3 ₹2.7 L |
| 4.00 | OD-1 Bailing out water Using 5HP Pump - Dewatering from excavated pit if required using diesel pump or any other pump set of suitable capacity without causing any damage to existing structures including supply, installation, operation, maintenance and shifting of pump set with all necessary accessories such as suction and delivery pipes connecting hoses as required clamps, fittings, diesel, engine oil, lubricants and other consumables along with operator and labour charges transportation loading unloading handling and all incidental works required for discharging water to a suitable location as directed by Rubber Park, officials and lowering the water level complete in all respects for the proper completion of the work and as per the direction and satisfaction of the Engineer in Charge Rubber Park.( Ref. Price item no. 60.2.2 ) | 30 | Hour | 417.82 ₹12,534.60 |
| 5.00 | OD-2 Desilting and removal of accumulated sludge from the bottom of pond using suitable means such as pumping or excavator or any other approved method without causing any damage to existing structures including removal of debris, impurities and vegetation and depositing the sludge in the pre excavated pit or any other suitable location as directed by Rubber Park officials and the work shall include deployment of all equipments required for desilting works,diesel pumps with necessary connecting hoses wherever required for pumping sludge mixed with water and supply of all materials, fuel, lubricants, consumables, labour, transportation, loading, unloading, handling and all other incidental charges including measurement of soudings etc complete in all respects for the proper completion of the work and as per the direction and satisfaction of the Engineer in Charge Rubber Park. | 4,000 | cum | 145.11 ₹5.8 L |
Tender Value
Refer Docs
EMD Value
₹40,100
Closing Date
2 May 2026, 5:00 pmClosed
Managing Director
Managing Director Rubber Park India Pvt Ltd. 2A Kautileeyam Rubber Park Valayanchirangara P O Irapuram Ernakulam Kerala Pin 683 556
Rubber Park India Private Limited Irapuram Ernakulam Removal of accumulated silt sludge from the bottom of Pond Sarovaram at Site A
2026_RPI_848422_2
RP/C/W/T/04/26
Open Tender
Civil Works - Water Works
25 days
Rubber Park Irapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹40,100
19 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
2 May 2026
24 Apr 2026
24 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m
above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared and as directed by Engineer-incharge | - | sqm | - | - | BI01010001010000000000000515BI0100001113 | |
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, and as directed by Engineer-incharge.- All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001114 | |
| 3 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials for the proper completion of work and as per the direction of Engineer in charge. All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | OD-1 Bailing out water Using 5HP Pump - Dewatering from excavated pit if required using diesel pump or any other pump set of suitable capacity without causing any damage to existing structures including supply, installation, operation, maintenance and shifting of pump set with all necessary accessories such as suction and delivery pipes connecting hoses as required clamps, fittings, diesel, engine oil, lubricants and other consumables along with operator and labour charges transportation loading unloading handling and all incidental works required for discharging water to a suitable location as directed by Rubber Park, officials and lowering the water level complete in all respects for the proper completion of the work and as per the direction and satisfaction of the Engineer in Charge Rubber Park.( Ref. Price item no. 60.2.2 ) | 30 | Hour | - | - | BI01010001010000000000000515BI0100001121 |
OD-2 Desilting and removal of accumulated sludge from the bottom of pond using suitable means such as pumping or excavator or any other approved method without causing any damage to existing structures including removal of debris, impurities and vegetation and depositing the sludge in the pre excavated pit or any other suitable location as directed by Rubber Park officials and the work shall include deployment of all equipments required for desilting works,diesel pumps with necessary connecting hoses wherever required for pumping sludge mixed with water and supply of all materials, fuel, lubricants, consumables, labour, transportation, loading, unloading, handling and all other incidental charges including measurement of soudings etc complete in all respects for the proper completion of the work and as per the direction and satisfaction of the Engineer in Charge Rubber Park. | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
NIT.pdf
Other Document • 0.82 MB
BOQ_1434429.xls
BOQ • 0.33 MB
TENDERDOCUMENT.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid