Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC MANGALATHU HOUSE PARATHODU P O | PARATHODU | KERALA | ₹3.9 L | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹4.0 LRejected-AOC | ₹4.0 L | L2 | Rejected-AOC 2nd lowest |
| Sl No | Description | Qty | Unit | Mangalathu Constructions L1 | ASHARUF K K L2 |
|---|---|---|---|---|---|
| 1.00protection works | |||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 3.68 | cum | 703.65 ₹2,589.43 | 712.07 ₹2,620.42 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 72.95 | cum | 239.3 ₹17,456.94 | 242.17 ₹17,666.30 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.58 | cum | 1,593.85 ₹4,105.76 | 1,612.93 ₹4,154.91 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 90.5 | cum | 3,709.5 ₹3.4 L | 3,753.85 ₹3.4 L |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.18 | sqm | 358.6 ₹2,931.56 | 362.99 ₹2,967.44 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.27 | cum | 9,743 ₹12,422.33 | 9,859.44 ₹12,570.79 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.29 | cum | 8,579.25 ₹11,101.55 | 8,681.81 ₹11,234.26 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 69.52 | kilogram | 104.4 ₹7,257.68 | 105.68 ₹7,346.66 |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
25 Feb 2026, 6:00 pmClosed
Assistant Executive Engineer
o/o of the Assistant Executive Engineer MI Sub Division Kottayam
DRM retaining wall of lengths of 8.5m and 26m with heights of 2.80m and 2.00 is near Triveni Bridge Ezhakunnel bhagom in ward no.4 of Parathodu panchayath
2026_Irrig_837226_1
IRR/IA/TR/4502/2024_5_2_1/1
Open Tender
Civil Works - Water Works
270 days
Parathodu
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,593
Yes
3 Mar 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
protection works
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1409777.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT23.pdf
Tender Documents • 0.02 MB
SBD23.pdf
Tender Documents • 2.99 MB
BOQ_1409777.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid