Loading…
Loading…
Tender Value
₹6.7 L
EMD Value
₹16,748
Closing Date
18 Sept 2023, 6:55 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer KyIP Subdivision Vadakara
GENERAL-KYIP Rectification of Syphon near Ch0/500km of Orkkatteri Distributary canal
2023_Irrig_601102_1
IRR/PI/TR/4275/2023_5_3_2/1
Open Tender
Civil Works - Canal
Item Rate
105 days
Vellikulangara
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,480
Yes
₹16,748
Yes
14 Mar 2024
8 Sept 2023
20 Sept 2023
8 Sept 2023
18 Sept 2023
8 Sept 2023
8 Sept 2023 - 18 Sept 2023
Amount
RR Side wall
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
18.72.25:Providing and laying S & S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329:700 mm dia Ductile Iron Class K - 9 pipes
18.70.12:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:700 mm dia pipes
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD15652/2023-2024:Laying spreading and consolidating quarry muck for road work
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD20610/2023-2024:20mm cement plaster 1:2(1 cement:2 stone dust) with rabbit mesh
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
C K AMMED
Bidder Name
P.T.USMAN
C K AMMED
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_893269.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .