Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | L1 | Accepted-AOC AWARDED | |
| 2 | L2₹1.0 L+₹1,865 (1.88%)Rejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | L2 | Rejected-Finance DUE TO HIGHER RATE QUOTED | |
| 3 | L3₹1.0 L+₹3,915 (3.96%)Rejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | L3 | Rejected-Finance DUE TO HIGHER RATE QUOTED |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Repair work of Hyva(water tanker) | ||||||
| 1.01 | Description of work: 1. Rear and front spring leaf (06 sets) removing, necessary recambering and fitting. 2. Rear and front spring leaf (10 Nos.) cutting & hole making.3. Rear and front spring leaf (08 Nos. welding and grinding.4. Rear and front spring bell crank 04 Nos. removing and fitting.
5. Rear and front spring hanger 06 Nos. removing, hanger and bolt changing and fitting. 6. Rear and front spring shackle 06 nos. removing and fitting.7. Rear and front spring bell crank 04 nos. damage hole new making. Welding, machining proper size & all bell crank, bush raimring, machining and fitting. 8. Rear and front spring balance rod lever welding, making, repairing & bush raimring, fitting and repairing. 9.Complete Alternator removing, overhauling and fitting.10. Engine Tappet cover removing, Gasket changing, Tappet adjusting, setting and fitting.
11. Rear and front engine mounting removing, changing and fitting.
12. Front chassis Cross member cutting, removing, changing, fitting and welding.
Materials to be replaced:
Rear spring bell crank bush 04 set, Rear spring bell crank pin big size 06 no, Rear spring pin 08 no, Rear spring bush 08 no, Front spring pin 04 no, Front spring bush 04 no, Rear and front spring centre bolt 06 no, Quotter pin bolt 22 no, Spring U bolt 04 no, Rear & front spring clamp with bolt 8 inch 08 no, Rear & front spring clamp with bolt 6 inch 08 no, Spring hanger 03 no, Spring shackle 03 no, Spring side washer 8 MM 48 no, Spring side washer 6 mm 52 no, Rear spring leaf main 02 no, Rear spring leaf 2nd 01 no, Rear spring leaf Aux A 02 NO, Rear spring leaf Aux B 01 no, Alternator rotor assy. 01 no, Regulator 01 no, Alternator rectifier assy. 01 set, Alternator carbon with 01 holder 01 set, Alternator bearing 01 no, Engine mounting with bolt 04 set, Front cross member with bolt nut 01 set etc. Repairing work should be completed with all required materials and manpower. | 1 | Nos | 98,985 ₹98,985 Lowest | 1,00,850 ₹1,00,850 | 1,02,900 ₹1,02,900 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹98,985
EMD Value
₹1,237
Closing Date
9 Aug 2025, 5:00 pmClosed
Incharge, AAW KUSUNDA AREA
Office of the GM,Kusunda Area
Repair work of Hyva (Water Tanker) Reg.No-JH10AE-0310 of ADIC, Kusunda Area
2025_BCCL_340535_1
BCCL/KA-VI/TRPT/E-NIT/25-26/07
Open Tender
Miscellaneous Works
Item Rate
7 days
ADIC
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,237
Yes
21 Aug 2025
30 Jul 2025
11 Aug 2025
30 Jul 2025
9 Aug 2025
30 Jul 2025
Amount
Repair work of Hyva(water tanker)
Description of work: 1. Rear and front spring leaf (06 sets) removing, necessary recambering and fitting. 2. Rear and front spring leaf (10 Nos.) cutting & hole making.3. Rear and front spring leaf (08 Nos. welding and grinding.4. Rear and front spring bell crank 04 Nos. removing and fitting. 5. Rear and front spring hanger 06 Nos. removing, hanger and bolt changing and fitting. 6. Rear and front spring shackle 06 nos. removing and fitting.7. Rear and front spring bell crank 04 nos. damage hole new making. Welding, machining proper size & all bell crank, bush raimring, machining and fitting. 8. Rear and front spring balance rod lever welding, making, repairing & bush raimring, fitting and repairing. 9.Complete Alternator removing, overhauling and fitting.10. Engine Tappet cover removing, Gasket changing, Tappet adjusting, setting and fitting. 11. Rear and front engine mounting removing, changing and fitting. 12. Front chassis Cross member cutting, removing, changing, fitting and welding. Materials to be replaced: Rear spring bell crank bush 04 set, Rear spring bell crank pin big size 06 no, Rear spring pin 08 no, Rear spring bush 08 no, Front spring pin 04 no, Front spring bush 04 no, Rear and front spring centre bolt 06 no, Quotter pin bolt 22 no, Spring U bolt 04 no, Rear & front spring clamp with bolt 8 inch 08 no, Rear & front spring clamp with bolt 6 inch 08 no, Spring hanger 03 no, Spring shackle 03 no, Spring side washer 8 MM 48 no, Spring side washer 6 mm 52 no, Rear spring leaf main 02 no, Rear spring leaf 2nd 01 no, Rear spring leaf Aux A 02 NO, Rear spring leaf Aux B 01 no, Alternator rotor assy. 01 no, Regulator 01 no, Alternator rectifier assy. 01 set, Alternator carbon with 01 holder 01 set, Alternator bearing 01 no, Engine mounting with bolt 04 set, Front cross member with bolt nut 01 set etc. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
SHRI DURGA AUTOMOBILES (BID ID -1172914)
Q-TECH SALES AND SERVICE (BID ID -1172924)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_353010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .