Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.4 L+₹8,160 (6.09%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.5 L+₹13,345 (9.97%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
₹1.4 L
EMD Value
₹2,892
Closing Date
13 Jun 2022, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Servicing,Repair,reconditioning of Liquid Rotor Starter of 300KW H.T motor and replacement of worn out 3-phase segregator with allied works HT motor installed on pumping unit No 1 and 3 at Lift Irrigation Station Rajal.
2022_IFC_172722_1
19/MID/AN
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Rajal
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹2,892
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
20 Jun 2022
6 Jun 2022
16 Jun 2022
6 Jun 2022
13 Jun 2022
7 Jun 2022
9 Jun 2022
Servicing, Repairing of Liquid Rotor starters (L.R.S.) type L.F.500, 300 K.W capacity of H.T 400 H.P, 6.6 K.V, and B.H.E.L make strip wounded slip ring type motor installed at L.I.S Rajal of pumping unit No 1 & 3 by way of draining out the old electrolyte from the L.R.S. Chamber, washing the internal and external surfaces of chamber by removing, sludge, corrosion, carbon deposit and then cleaning the internal surface of chamber with emery paper as required & then cleaning with cloth. Filling of new electrolyte up to reqd. level in the L.R.S. chamber. Job includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job /handling the components with hire charges for deployment of tools and tackles at site. Complete Job
Providing & fitting of insulator set (Male & Female)with copper pin (bush rod),nut and washers as per sample & specifications provided to L.R.S of pumping unit No 1at LIS Rajal. Job including dismantling/cutting of damaged, old burnt/ worn out copper pin from the L.R.S. job includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job /handling the components with hire charges for deployment of tools and tackles at site. Complete Job
Providing and Fitting of moving copper contact (1 set of 3 pcs) to L.R.S of pumping unit No 1as per sample& specifications provided at L.I.S Rajal. Job including dismantling/removing of old burnt/worn out/ damaged moving contacts from the L.R.S job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job /handling the components with hire charges for deployment of tools and tackles at site. Complete Job
Providing and Fitting of fixed copper contact along with copper support on base steel strip, tension support with nut, bolts and washers as per sample & specifications provided to L.R.S. of pumping unit No1at LIS Rajal. Job including dismantling/removing/cutting of old burnt/worn out/damaged fixed contacts from the L.R.S. job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job after proper alignment also handling the components with hire charges for deployment of tools and tackles at site Complete Job
Providing and Fitting of copper shunt coil as per sample & specifications provided to L.R.S. Type L.F. 500 300 KW capacity of unit No 1 at L.I.S. Rajal. Job including dismantling/cutting of old burnt/ worn out /damaged copper shunt coils from the L.R.S Job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job /handling the components with hire charges for deployment of tools and tackles at site. Complete Job
Providing and Fitting of copper phase C-connector below the existed steel strips with p/f of insulators after tightening with new nuts, bolts& washers as per sample & specifications provided to L.R.S. of pumping unit No 1 at LIS Rajal. Job including dismantling/removing/cutting of old burnt/worn out/damaged copper C-connector fixed from the L.R.S. job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job after proper alignment also handling the components with hire charges for deployment of tools and tackles at site Complete Job
Providing and Fitting of copper phase rectangular flats (right side& left side to LRS) with p/f of insulator after tightening with new nuts, bolts & washers as per sample & specifications provided to L.R.S. of pumping unit No 1 at LIS Rajal. Job including dismantling/removing/cutting of old burnt/worn out/damaged copper C-connector fixed from the L.R.S. job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job after proper alignment also handling the components with hire charges for deployment of tools and tackles at site Complete Job
Fabrication of phase segregator out of Bakelite material as per sample specifications & fitting to 400 HP /300 KW BHEL make 6.6 KV,HT motor installed on pumping unit No 1 at L.I.S. Rajal, job includes the cost of fine threaded nut bolts for fitting the phase segregator to the motor. Job also includes the dismantling & removing of old phase segregator. Complete Job.
Providing and fitting of carbon brushes to slipring assembly of 300KW/400HP BHEL make solid shaft vertical motors installed on pumping unit No 1 & 3 as per sample & specifications provided at LIS Rajal. Job including dismantling/removing/cutting of old damaged carbon brushes from the slip ring assembly. job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job after proper alignment also handling the components with hire charges for deployment of tools and tackles at site Complete Job
Fabrication/providing & fitting of carbon brush holder with locking arrangement, make of material with required grade composition and specifications as per sample to 400HP/300KW BHEL make 6.6 KV, HT motor installed on pumping unit No 1.. Job including dismantling/removing/cutting of old damaged/ worn out carbon brush holder etc from the slip ring assembly. job also includes the cost of material , transportation charges, labour charges for skilled and semi-skilled workers for execution of job after proper alignment also handling the components with hire charges for deployment of tools and tackles at site .Complete Job
M/S FASTTRACK ENGINEERS
PERFECT ELECTRICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .