Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance MUTHABERIA BKTPP SADAIPUR BIRBHUM 731104 | SADAIPUR | BIRBHUM | WEST BENGAL | 731104 | L1 | Admitted-Finance | |
| 2 | L2₹10.2 L+₹60,149.45 (6.24%)Admitted-Finance 0 BAIRAJBANI VADI HIFALI ROAD HIRAMAMANA BANGALANI BAJUMA BOTAD BHAVNAGAR GUJARAT 364710 | BOTAD | GUJARAT | 364710 | L2 | Admitted-Finance | |
| 3 | L3₹10.5 L+₹86,702.95 (9.00%)Admitted-Finance 142 HAHIHARPUR KENSHILI USTHI SOUTH 24 PARGANAS WEST BENGAL 743375 | 24 PARAGANAS SOUTH | WEST BENGAL | 743375 | L3 | Admitted-Finance | |
| 4 | L4₹10.7 L+₹1.1 L (11.3%)Admitted-Finance A 1 1 BKTPP CHP AREA BKTPP BIRBHUM 731104 | BIRBHUM | BIRBHUM | WEST BENGAL | 731104 | L4 | Admitted-Finance | |
| 5 | L5₹11.0 L+₹1.3 L (13.9%)Admitted-Finance BARABAGAN SAJANO PALLY BIRBHUM WEST BENGAL INDIA 731103 | BIRBHUM | BIRBHUM | WEST BENGAL | 731103 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ROY CONTRACTORS PRIVATE LIMITED L5 | R. K. ENTERPRISE L2 | M/S PRIYA CONSTRUCTION L1 | PROJECT CONSTRUCTION SERVICES L4 | A. R. ENTERPRISE L3 | AGSB CORPORATE MANPOWER MANAGEMENT LIMITED L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Painting of ( Stringer channel, stringer post, gusset plates, tie angles, pulley frame, toe guard, railing, cross-over bridge, canopy, apron cover, take-up structure, brackets of idlers, carrying side deck sheet surface of Conveyor Structure (1A,1B,6A,6B ,7A, 101B,111A,111B,112A,112B,DE 2 ,DE 103A ,DE 103B,VF 1A/1B/1C/1D , VF 2A/2B, Roller Screen - 1 nos. of Stg -II , Crusher with chute - 1 nos. of Stg - II , Ventilation System-1 nos. of Stg -II of CHP with one coat primer and two coats of synthetic enamel. Job scope includes patch painting at different equipment, steel structure of CHP also. ) | 11,545 | Sq Mtr | 95.06 ₹10,97,467.7 | 88.7 ₹10,24,041.5 | 83.49 ₹9,63,892.05 Lowest | 92.9 ₹10,72,530.5 | 91 ₹10,50,595 | 112 ₹12,93,040 |
| 2.00GST extra as applicable | |||||||||
Tender Value
Refer Docs
EMD Value
₹24,094
Closing Date
15 Jun 2026, 5:00 pmClosed
The General Manager,BKTPS
Bakreswar Thermal Power Project P.O. - BkTPP, District - Birbhum Pin - 731104
PAINTING WORK AT CONVEYOR STRUCTURE, CRUSHER BODY, ROLLER SCREEN BODY ,VENTILATION (VF) and DUST EXTRACTION (DE) SYSTEM, BKTPS
2026_WBPDC_1023908_1
WBPDCL/BKTPP/NIT/E4221/26-27
Open Tender
Miscellaneous Services
Item Rate
180 days
at Bakreswar Thermal Power Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹24,094
Yes
Off Line- At the chamber of HOD -CC,BKTPS
20 Aug 2026
20 May 2026
18 Jun 2026
20 May 2026
15 Jun 2026
30 May 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Painting of ( Stringer channel, stringer post, gusset plates, tie angles, pulley frame, toe guard, railing, cross-over bridge, canopy, apron cover, take-up structure, brackets of idlers, carrying side deck sheet surface of Conveyor Structure (1A,1B,6A,6B ,7A, 101B,111A,111B,112A,112B,DE 2 ,DE 103A ,DE 103B,VF 1A/1B/1C/1D , VF 2A/2B, Roller Screen - 1 nos. of Stg -II , Crusher with chute - 1 nos. of Stg - II , Ventilation System-1 nos. of Stg -II of CHP with one coat primer and two coats of synthetic enamel. Job scope includes patch painting at different equipment, steel structure of CHP also. ) | 11,545 | Sq Mtr | - | - |
| 2 | GST extra as applicable | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_2516487.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .