Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.6 LAccepted-AOC R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.4 L+₹31,950 (3.51%)Rejected-Finance VILLAGE CHAMYANA P O KAMLA NAGER BHATTA KUFER DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹9.5 L+₹40,400 (4.44%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | 3 | Rejected-Finance 3 | |
| 4 | Rejected-Technical N A | PALWAL | HARYANA | 121004 | - | Rejected-Technical Reject |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
3 Aug 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Nog under JSV Sub-Division Bilaspur in Tehsil Sadar District Bilaspur (SH Operation and maintenance of pumping machinery and distribution of water supply from water storage tanks at various locations, minor repair of rising main and
2024_HPIPH_90946_1
BLP-BLP-00736 NIT No. 5022-5119 dated 23/07/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Bilaspur Section Store
Please refer Tender documents.
8 documents required · 8 mandatory
₹250
Yes
EE JSV Bilaspur
₹17,000
Yes
29 Oct 2024
24 Jul 2024
3 Aug 2024
24 Jul 2024
3 Aug 2024
24 Jul 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Nog whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 3 Nos pump house, main storage tank=3Nos.sector storage tank 2No Rising main: 50mm dia=1700 Rmt,65mm=3810Rmt, 65mm dia=2100Rmt, Distribution system:21KM Pumping machinery: Booster stage:2x2=4HP, 1st stage 40HP, Booster stage 3HP, 1st stage: 50 HP, Booster stage: 3 HP 1st stage 75HP. No of storage tanks: 5 Nos, 27 Nos habitations, Total working hours 36 per day : through , 6 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 310 KLr). Pumping hours per day ( 26) comulative for 3 Nos pump house and energy consumptoin per day Unit.
Surinder Singh
Sukh Dev
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .