Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | -2.51% | ₹1.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 L
EMD Value
₹4,219
Closing Date
20 Aug 2026, 3:00 pmClosed
AE
LID EW SECTION MUNDAKKAYAM GP
stadium basic facilities
2026_LSGD_841744_12
08/2025-26/AE/LIDEW/MKM
Open Tender
Civil Works - Others
Percentage
180 days
MUNDAKKAYAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,219
Yes
31 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Stadium maintanence | |||||
| 1.001 | 10.6.3:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x0.90 mm M.S. laths with 0.90 mm thick to cover | 1 | sqm | 3,409.54 | ₹3,406.13 |
| 1.002 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | 187.05 | ₹186.86 |
| 1.003 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | - | sqm | 248.82 | - |
| 1.004 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | - | sqm | 93.72 | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.80 MB
BOQ_1464011.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .