| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹10.9 L (5.27%)Rejected-AOC | ₹2.2 Cr+₹10.9 L (5.27%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 Cr+₹13.0 L (6.27%)Rejected-AOC | ₹2.2 Cr+₹13.0 L (6.27%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.2 Cr+₹17.2 L (8.30%)Rejected-AOC | ₹2.2 Cr+₹17.2 L (8.30%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.3 Cr+₹21.2 L (10.2%)Rejected-AOC | ₹2.3 Cr+₹21.2 L (10.2%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | RATHEESH S S L3 | K BABY NAIR L4 | S.Santhamma L1 | SASI KUMAR NATARAJA PILLAI L2 | S.SUDHEER L5 | THAJUDEEN L6 | Majestic constructions L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Drainage and Protection works | ||||||||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 615 | cum | 67.03 ₹41,223.45 | 68.31 ₹42,010.65 | 63.07 ₹38,788.05 Lowest | 66.4 ₹40,836 | 69.52 ₹42,754.8 | 77 ₹47,355 | 75.33 ₹46,327.95 |
| 1.00 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 279 | cum | 97.19 ₹27,116.01 | 99.04 ₹27,632.16 | 91.45 ₹25,514.55 Lowest | 96.27 ₹26,859.33 | 100.79 ₹28,120.41 | 111.07 ₹30,988.53 | 109.22 ₹30,472.38 |
| 1.00 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | 0.28 | Hectare | 1,90,005.56 ₹53,201.56 | 1,93,624.72 ₹54,214.92 | 1,78,786.19 ₹50,060.13 Lowest | 1,88,214.08 ₹52,699.94 | 1,97,062.91 ₹55,177.61 | 2,17,149.22 ₹60,801.78 | 2,13,530.06 ₹59,788.42 |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 200 | cum | 824.9 ₹1,64,980 | 840.61 ₹1,68,122 | 776.19 ₹1,55,238 Lowest | 817.12 ₹1,63,424 | 855.54 ₹1,71,108 | 942.74 ₹1,88,548 | 927.03 ₹1,85,406 |
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 210 | cum | 52.42 ₹11,008.2 | 53.41 ₹11,216.1 | 49.32 ₹10,357.2 Lowest | 51.92 ₹10,903.2 | 54.36 ₹11,415.6 | 59.9 ₹12,579 | 58.9 ₹12,369 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 272.5 | cum | 7,857.2 ₹21,41,087 | 8,006.86 ₹21,81,869.35 | 7,393.25 ₹20,14,660.63 Lowest | 7,783.12 ₹21,20,900.2 | 8,149.04 ₹22,20,613.4 | 8,979.66 ₹24,46,957.35 | 8,830 ₹24,06,175 |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 127.36 | cum | 9,104.3 ₹11,59,523.65 | 9,277.71 ₹11,81,609.15 | 8,566.71 ₹10,91,056.19 Lowest | 9,018.46 ₹11,48,591.07 | 9,442.45 ₹12,02,590.43 | 10,404.91 ₹13,25,169.34 | 10,231.49 ₹13,03,082.57 |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 52.5 | cum | 9,510.71 ₹4,99,312.28 | 9,691.87 ₹5,08,823.18 | 8,949.13 ₹4,69,829.33 Lowest | 9,421.04 ₹4,94,604.6 | 9,863.96 ₹5,17,857.9 | 10,869.38 ₹5,70,642.45 | 10,688.22 ₹5,61,131.55 |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 25 | cum | 9,891.13 ₹2,47,278.25 | 10,079.53 ₹2,51,988.25 | 9,307.08 ₹2,32,677 Lowest | 9,797.87 ₹2,44,946.75 | 10,258.51 ₹2,56,462.75 | 11,304.14 ₹2,82,603.5 | 11,115.74 ₹2,77,893.5 |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
19 Sept 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, PWD Roads South Circle, TVPM
GENERAL Budget work 2025 26 20 Provision Improvements to Vamanapuram Kuttara Panthiplavikonam road from 2 700 3 250 and Edamala Vattayam Panchayath road from 0 000 1 200 to BM and BC standards General Civil Work 1
2025_PWD_795727_1
PWD/RB/TR/7204/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
210 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
1 Nov 2025
10 Sept 2025
22 Sept 2025
10 Sept 2025
19 Sept 2025
10 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .