| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 CrAccepted-AOC 405 406 FF NILKANTH PALACE OPP KARMA SHRSTHAN TOWER 100 FT ROAD JODHPUR SATELLITE AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0017203 | AHMADABAD | GUJARAT | 380015 | ₹13.5 Cr | L1 | Accepted-AOC Contract is Awarded to L1 Overall Lowest techno commercially acceptable bidder |
| 2 | L2₹13.6 CrRejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹13.6 Cr | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹18.8 CrRejected-Finance | ₹18.8 Cr | L3 | Rejected-Finance L3 Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno-commercially not acceptable |
| Sl No | Description | Qty | Unit | BRITE INDUSTRIES L3 | Blue Star Limited L2 | M/s. PRANAM HVAC ENGINEERING PVT. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00Part-A (SITC of Both building) | ||||||
| 1.01SITC of HVAC OF CONTROL ROOM BUILDING | ||||||
| 1.02 | SITC of Water Cooled Screw compressor
SITC of Water-Cooled Screw compressor for Control Room Building Supply, Installation, Testing and Commissioning of Water Cooled Screw compressor, Capacity Minimum 110TR (upto+10%) , With Eco-friendly refrig R134a). Complete with Motor, Water cooled Condenser, Water Chiller with standard accessories refrigerant piping, fittings, valves, etc. as required
For further details, refer technical specifications and scope of work. | 3 | EA | 32,98,320 ₹1.2 Cr | 27,25,525 ₹96.5 L | 28,00,000 ₹99.1 L |
| 1.03 | SITC of Condensor Water Pump Set for CB
SITC of Condensor Water Pump Set for Control Room Building
Head: Mininmum 36 Mtrs
Each Unit Shall be capable of delivering complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundation
For further details, refer technical specifications and scope of work. | 3 | EA | 2,85,969 ₹10.1 L | 2,57,710 ₹9.1 L | 2,50,000 ₹8.8 L |
| 1.04 | SITC of Chiller Water Pump Set for CB
SITC of Chiller Water Pump Set for Control Room Building
Head: Mininmum 27 Mtrs
Each Unit Shall be complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC foundation, Insulation cladded with Aluminium sheet
For further details, refer technical specifications and scope of work. | 3 | EA | 2,36,759 ₹8.4 L | 2,11,105 ₹7.5 L | 1,90,000 ₹6.7 L |
| 1.05 | SITC of FRP Cooling Tower for CB
SITC of FRP Cooling Tower designed for Control Room Building,
Capacity: Minimum 150 TR
Each unit shall be complete with FRP water basin, PVC fillings with integral louvers and drift eliminators complete with hot water basin either fitted with dynamically balanced axial flow type fan-direct driven or driven through reduction gear box with TEFC induction motor, suction screen, make up quick fill arrangement, overflow and drain connections with necessary valves and suitable inspection ladder, motor, access arrangement for cooling tower interior, cement concrete foundation, steel/ masonry supporting structure, anti-vibration mountings etc. complete as per specifications and as required. Each shall be provided with MCB isolator in weather proof, 16SWG CRCA sheet steel enclosure Powder coated
For further details, refer technical specifications and scope of work. | 2 | EA | 8,44,171 ₹19.9 L | 3,08,110 ₹7.3 L | 6,50,000 ₹15.3 L |
| 1.06 | SITC of Air Handling Unit for CB
SITC of Air Handling Unit designed for Control Room
Capacity: 25000 cfm
Each unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency 'IE3' squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Control Room and Fresh air duct.
Three (3) set of filters shall be provided by contractor separately along with 25000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 25000 CFM AHU
For further details, refer technical specifications and scope of work. | 1 | EA | 14,38,227 ₹17.0 L | 11,41,225 ₹13.5 L | 10,40,000 ₹12.3 L |
| 1.07 | SITC of AHU designed for Office Room CB
SITC of Air Handling Unit designed for Office rooms in Control Room Building
Capacity: 7000 cfm
Each unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency 'IE3' squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Office space in Control Room Building and fresh air duct.
Three (3) set of filters shall be provided by contractor separately along with 7000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 7000 CFM AHU
For further details, refer technical specifications and scope of work. | 1 | EA | 4,84,722 ₹5.7 L | 3,78,125 ₹4.5 L | 3,58,282 ₹4.2 L |
| 1.08 | SITC of Condenser & Chilled Water Pipe<4
SITC of Condenser and Chilled Water Piping for Control Room Building
Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) Upto 4 Inch piping
For further details, refer technical specifications and scope of work. | 150 | ZR1 | 1,918 ₹3.4 L | 1,955 ₹3.5 L | 1,420 ₹2.5 L |
| 1.09 | SITC of Condenser & Chilled Water Pipe>4
SITC of Condenser and Chilled Water Piping for Control Room Building
Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) above 4 Inch piping
For further details, refer technical specifications and scope of work. | 250 | ZR1 | 1,918 ₹5.7 L | 4,245 ₹12.5 L | 3,340 ₹9.9 L |
Tender Value
Refer Docs
EMD Value
₹10.2 L
Closing Date
9 Mar 2026, 2:00 pmClosed
RAJEEV KUMAR
Hazira Compressor Station, Ichhapore Magdalla Road, PO- ONGCL, Hazira, Dist. Surat 394 518
REPLACEMENT OF HVAC SYSTEM INSTALLED AT CONTROL ROOM BUILDING AND ADMINISTRATIVE BUILDING OF HAZIRA COMPRESSOR STATION WITH NEW AIR CONDITIONING SYSTEM UNDER BUY-BACK
2026_GAIL_267340_1
GAIL/HZR/CNP/136061/66C/25-26
Open Tender
Miscellaneous Works
365 days
Hazira Compressor Station
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10.2 L
Hazira Compressor Station
28 Apr 2026
16 Feb 2026
10 Mar 2026
16 Feb 2026
9 Mar 2026
2 Mar 2026
25 Feb 2026
Part-A (SITC of Both building)
SITC of HVAC OF CONTROL ROOM BUILDING
SITC of Water Cooled Screw compressor SITC of Water-Cooled Screw compressor for Control Room Building Supply, Installation, Testing and Commissioning of Water Cooled Screw compressor, Capacity Minimum 110TR (upto+10%) , With Eco-friendly refrig R134a). Complete with Motor, Water cooled Condenser, Water Chiller with standard accessories refrigerant piping, fittings, valves, etc. as required For further details, refer technical specifications and scope of work.
SITC of Condensor Water Pump Set for CB SITC of Condensor Water Pump Set for Control Room Building Head: Mininmum 36 Mtrs Each Unit Shall be capable of delivering complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundation For further details, refer technical specifications and scope of work.
SITC of Chiller Water Pump Set for CB SITC of Chiller Water Pump Set for Control Room Building Head: Mininmum 27 Mtrs Each Unit Shall be complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC foundation, Insulation cladded with Aluminium sheet For further details, refer technical specifications and scope of work.
SITC of FRP Cooling Tower for CB SITC of FRP Cooling Tower designed for Control Room Building, Capacity: Minimum 150 TR Each unit shall be complete with FRP water basin, PVC fillings with integral louvers and drift eliminators complete with hot water basin either fitted with dynamically balanced axial flow type fan-direct driven or driven through reduction gear box with TEFC induction motor, suction screen, make up quick fill arrangement, overflow and drain connections with necessary valves and suitable inspection ladder, motor, access arrangement for cooling tower interior, cement concrete foundation, steel/ masonry supporting structure, anti-vibration mountings etc. complete as per specifications and as required. Each shall be provided with MCB isolator in weather proof, 16SWG CRCA sheet steel enclosure Powder coated For further details, refer technical specifications and scope of work.
SITC of Air Handling Unit for CB SITC of Air Handling Unit designed for Control Room Capacity: 25000 cfm Each unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency 'IE3' squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Control Room and Fresh air duct. Three (3) set of filters shall be provided by contractor separately along with 25000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 25000 CFM AHU For further details, refer technical specifications and scope of work.
SITC of AHU designed for Office Room CB SITC of Air Handling Unit designed for Office rooms in Control Room Building Capacity: 7000 cfm Each unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency 'IE3' squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Office space in Control Room Building and fresh air duct. Three (3) set of filters shall be provided by contractor separately along with 7000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 7000 CFM AHU For further details, refer technical specifications and scope of work.
SITC of Condenser & Chilled Water Pipe<4 SITC of Condenser and Chilled Water Piping for Control Room Building Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) Upto 4 Inch piping For further details, refer technical specifications and scope of work.
SITC of Condenser & Chilled Water Pipe>4 SITC of Condenser and Chilled Water Piping for Control Room Building Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) above 4 Inch piping For further details, refer technical specifications and scope of work.
SITC of Chilled Water Piping Insulation SITC of Chilled Water Piping Insulation for Control Room Building For chilled water line, providing and fixing with Nitrile Insulation complete with adhesive and to be seal with Alu cladding (UoM in sq mtr of pipe surface area) For further details, refer technical specifications and scope of work.
SITC of Balancing Valve for Control Room SITC of Balancing Valve for Control Room Building SITC of 2-way pressure induced balancing and control valves for chilled water control at AHU. For further details, refer technical specifications and scope of work.
SITC of Stainless Steel Expansion Tank SITC of Stainless Steel Expansion Tank Capacity: 1000 Liters for Control Room Building Complete with outlet for system connection, overflow, make-up connection, overflow connection , drain connection, vent connection, valves and fittings as required. For further details, refer technical specifications and scope of work.
SITC fof Electrical Panel for CB Supply Installation Testing and Commissioning of Electrical Panel for Control Room Building Cubical type main LT panel board suitable for 3 phase, 415 V, 50Hz AC supply, Common electrical panel shall be provided containg minimum following feeders: a) 02 nos. of incomer of 1000A each, 4P with Air Circuit Breaker (ACB) b) 01 no. of Bus Coupler of 1000A, 4P with Air Circuit Breaker (ACB) c) 04 nos. of outgoing for Compressor motors of suitable rating as per design, d) 03 nos. of outgoing for condenser water pumps of suitable rating as per design, e) 03 nos. of outgoing for chilled water pumps of suitable rating as per design, f) 03 nos. of outgoing for cooling tower of suitable rating as per design, g) 02 nos. of outgoing for AHU-1 of suitable rating as per design, h) 02 nos. of outgoing for AHU-2 of suitable rating as per design, i) 07 nos. of outgoing for existing Split AC Unit of 10 KW rating, j) 04 no. of outgoing for existing strip heater of 12 KW rating, k) 02 no. of outgoing for existing Fresh Air Fan of 1.1 KW rating, l) 04 nos. of outgoing for existing Exhaust fan of 1.0 KW rating, m) 03 nos. of outgoing for existing Pan humidifier of 2.3 KW rating, n) 01 no. of outgoing for capacitor bank of suitable rating as per design for maintaining the power factor >0.95, o) 01 no. of compartment for Capacitor Bank (APFC) as per design for maintaining the power factor >0.95, p) 230 V AC to 24 V DC converter with suitable feeder of suitable rating as per design For further details, refer technical specifications and scope of work.
SITC of Cable work (3.5C X 150 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 150 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (3.5C X 120 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays / supports as required including connections on both sides as per specifications and as required. 3.5C X 120 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (3.5C X 50 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 50 sqmm. For further details, refer technical specifications and scope of work.
SITC of Cable work (4C X 25 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 25 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (4C X 10 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 10 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (2Cx 1.5 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 2C X 1.5 sqmm Flexible control wiring For further details, refer technical specifications and scope of work.
SITC Perforated MS cable tray 150x50x1.6 SITC Perforated MS cable trays for Control Room Building 150mm (W) x 50mm (D) x 1.6 mm thickness For further details, refer technical specifications and scope of work.
SITC Perforated MS cable tray 300x50x1.6 SITC Perforated MS cable trays for Control Room Building 300mm (W) x 50mm (D) x 1.6 m thickness For further details, refer technical specifications and scope of work.
SITC Perforated MS cable trays 600x50x2 SITC Perforated MS cable trays for Control Room Building 600mm (W) x 50mm (D) x 2.0 mm thickness For further details, refer technical specifications and scope of work.
SITC of GI Strip, 25x4 mm SITC of GI Strip, 25mm x 4mm For further details, refer technical specifications and scope of work.
SITC of PLC Based Control Unit for CB SITC of PLC Based Control Unit for Control Room Building For further details, refer technical specifications and scope of work.
SITC of Civil work for CB SITC of Civil work during the execuation for Control Room Building For further details, refer technical specifications and scope of work.
Providing temporary cooling arrangement Providing of temporary cooling arrangement for Office space in Control Room Building as per SOW For further details, refer technical specifications and scope of work.
SITC of HVAC OF ADMINISTRATIVE BUILDING
SITC of Water Cooled Screw compressor AB SITC of Water Cooled Screw compressor for Administrative Building Supply, Installation, Testing and Commissioning of Water Cooled Screw compressor,Capacity 110TR (upto+10%), With Eco-friendly refrigerant (like R134a). Each Unit Shall be complete with motor, Water cooled Condenser, Water chiller with standard accessories refrigerant piping, fittings, valves, etc. as required For further details, refer technical specifications and scope of work.
SITC of Condensor Water Pump Set for AB SITC of Condensor Water Pump Set for Administrative building, Head: Mininmum 36 Mtrs Each Unit Shall be capable of delivering complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundation For further details, refer technical specifications and scope of work.
SITC of Chiller Water Pump Set for AB SITC of Chiller Water Pump Set for Administrative building, Head: Minimum 27 Mtrs Each Unit Shall be complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundation, Insulation cladded with Aluminium sheet, For further details, refer technical specifications and scope of work.
SITC of FRP Cooling Tower designed fr AB SITC of FRP Cooling Tower designed for Administrative building Capaicty: Minimum 150 TR. Unit shall be complete with FRP water basin, PVC fillings with integral louvers and drift eliminators complete with hot water basin either fitted with dynamically balanced axial flow type fan-direct driven or driven through reduction gear box with TEFC induction motor, suction screen, make up quick fill arrangement, overflow and drain connections with necessary valves and suitable inspection ladder, motor, access arrangement for cooling tower interior, cement concrete foundation, steel/ masonry supporting structure, anti-vibration mountings etc. complete as per specifications and as required. Each shall be provided with MCB isolator in weather proof, 16SWG CRCA sheet steel enclosure Powder coated For further details, refer technical specifications and scope of work.
SITC of Air Handling Unit designed fr AB SITC of Air Handling Unit designed for Administrative building, Capacity: 18000 cfm Each unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency 'IE3' squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct used for Administrative Building Office space Three (3) set of filters shall be provided by contractor separately along with 18000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 18000 CFM AHU For further details, refer technical specifications and scope of work.
SITC of Condenser&Chilled Water Pipe<4 SITC of Condenser and Chilled Water Piping for Administrative building Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) Upto 4 Inch piping For further details, refer technical specifications and scope of work.
SITC of Condenser&Chilled Water Pipe>4 SITC of Condenser and Chilled Water Piping for Administrative building Supplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) above 4 Inch piping For further details, refer technical specifications and scope of work.
SITC of Chilled Water Piping Insulation SITC of Chilled Water Piping Insulation for Administrative building For chilled water line, providing and fixing with Nitrile Insulation complete with adhesive and to be seal with Alu cladding (UoM in sq mtr of pipe surface area) For further details, refer technical specifications and scope of work.
SITC of Balancing Valve for AB SITC of Balancing Valve for Administrative building SITC of 2-way pressure induced balancing and control valves for chilled water control at AHU. For further details, refer technical specifications and scope of work.
SITC of Stainless Steel Expansion Tank SITC of Stainless Steel Expansion Tank, Capacity: 1000 Liters for Administrative building Complete with outlet for system connection, overflow, make-up connection, overflow connection, drain connection, vent connection, valves and fittings as required. For further details, refer technical specifications and scope of work.
SITC of Electrical Panel for AB Supply Installation Testing and Commissioning of Electrical Panel for Administrative Building Cubical type main LT panel board suitable for 3 phase, 415 V, 50Hz AC supply, Common electrical panel shall be provided containg minimum following feeders: a) 02 nos. of incomer of 1000A each, 4P with Air Circuit Breaker (ACB) b) 01 no. of Bus Coupler of 1000A, 4P with Air Circuit Breaker (ACB) c) 03 nos. of outgoing for Compressor motors of suitable rating as per design, d) 03 nos. of outgoing for condenser water pumps of suitable rating as per design, e) 03 nos. of outgoing for chilled water pumps of suitable rating as per design, f) 02 nos. of outgoing for cooling tower of suitable rating as per design, g) 02 nos. of outgoing for AHU of suitable rating as per design, i) 02 nos. of outgoing for existing Split AC Unit of 10 KW rating, j) 08 no. of outgoing for existing strip heater of 12 KW rating, k) 02 no. of outgoing for existing Fresh Air Fan of 1.1 KW rating, l) 02 nos. of outgoing for existing Pan humidifier of 2.3 KW rating, m) 02 nos. of outgoing for existing Exhaust fan of 5 KW rating, n) 01 no. of outgoing for existing Solar PV System of 30 KW rating, o) 01 no. of outgoing for capacitor bank of suitable rating as per design for maintaining the power factor >0.95, p) 01 no. of compartment for Capacitor Bank (APFC) as per design for maintaining the power factor >0.95, q) 230 V AC to 24 V DC converter with suitable feeder of suitable rating as per design For further details, refer technical specifications and scope of work.
SITC of Cable Works (3.5Cx150sqmm) SITC of Cable Works for Administrative Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 150 sqmm For further details, refer technical specifications and scope of work.
SITC of cable work (3.5Cx120sqmm) SITC of Cable Works for Administrative Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 120 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (3.5C X 50 sqmm) SITC of Cable Works for Control Room Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 50 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (4C X 25 sqmm) SITC of Cable Works for Administrative Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 25 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (4C X 10 sqmm) SITC of Cable Works for Administrative Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 10 sqmm For further details, refer technical specifications and scope of work.
SITC of Cable work (2C x 1.5 sqmm) SITC of Cable Works for Administrative Building Complete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 2C X 1.5 sqmm Flexible control wiring For further details, refer technical specifications and scope of work.
SITC Perforated MS cable tray 150x50x1.6 SITC Perforated MS cable trays for Administrative Building 150mm (W) x 50mm (D) x 1.6 mm thickness For further details, refer technical specifications and scope of work.
SITC Perforated MS cable tray 300x50x1.6 SITC Perforated MS cable trays for Administrative Building 300mm (W) x 50mm (D) x 1.6 m thickness For further details, refer technical specifications and scope of work.
SITC Perforated MS cable trays 600x50x2 SITC Perforated MS cable trays for Administrative Building 600mm (W) x 50mm (D) x 2.0 mm thickness For further details, refer technical specifications and scope of work.
SITC of GI Strip, 25x4 mm SITC of GI Strip, 25mm x 4mm For further details, refer technical specifications and scope of work.
SITC of PLC Based Control Unit for AB SITC of PLC Based Control Unit for Administrative Building For further details, refer technical specifications and scope of work.
SITC of Civil work during the execut AB SITC of Civil work during the execuation for Administrative Building For further details, refer technical specifications and scope of work.
Providing temporary cooling arrangement Providing of temporary cooling arrangement for Office space in Administrative Building For further details, refer technical specifications and scope of work.
Part-B (Service Visit During Warranty Period)
Monthly Service visit during Warranty AB Monthly Service visit during Warranty Period for Administartive Building For further details, refer technical specifications and scope of work.
Monthly Service visit during Warranty Monthly Service visit during Warranty Period for Control Room Building For further details, refer technical specifications and scope of work.
Part-C (AMC for both buildings)
AMC for 3 years for Administartive Build Quaterly Service visit during Comprehensive AMC for 3 years for Administartive Building For further details, refer technical specifications and scope of work.
AMC for 3 years for Control Room Building Quaterly Service visit during Comprehensive AMC for 3 years for Control Room Building For further details, refer technical specifications and scope of work.
Part-D (Buy-back for both equipment’s)
Buy back value for Old Equipment of Administrative Building For further details, refer technical specifications and scope of work.
Buy back value for Old Equipment of Control Room Building For further details, refer technical specifications and scope of work.
Control Room Building: Screw Compressor (110TR)
Control Room Building: Condenser Water Pump (36 Mfs)
Control Room Building: Chilled Water Pump (27 Mfs)
Control Room Building: Cooling Tower (150TR)
Control Room Building: AHU-1 (700 cfm)
Control Room Building: AHU-2 (25000 cfm)
Administrative Building: Screw Compressor (110TR)
Administrative Building: Condenser Water Pump (36 Mfs)
Administrative Building: Chilled Water Pump (27 Mfs)
Administrative Building: Cooling Tower (150TR)
Administrative Building: AHU (18000 cfm)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
TenderHVAC.pdf
Tender Documents • 3.61 MB
CBA.pdf
Other Document • 0.17 MB
BOQ_310849.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid