Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.5 Cr+₹16.1 L (1.21%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.8 Cr+₹40.5 L (3.03%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹14.7 Cr+₹1.3 Cr (9.78%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical NON RESPONSIVE DUE TO NOT ATTACHED DOCUMENT |
Tender Value
₹14.7 Cr
EMD Value
₹29.3 L
Closing Date
23 Jul 2025, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Road strengthening work from Pech ki Bawdi to Pagara via Mahadev Temple in Bundi district
2025_CEPWD_466491_1
ACE PWD ZONE KOTA NITNO-02/2025-26
Open Tender
Civil Works
Percentage
300 days
BUNDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DIV. NAINWA
₹29.3 L
Yes
ACE PWD ZONE KOTA
7 Aug 2025
8 May 2025
25 Jul 2025
8 May 2025
23 Jul 2025
8 May 2025
14 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | 6 | Hectare | - | - |
| 2 | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 132 | Cum | - | - |
| 3 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 330 | Cum | - | - |
| 4 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 48,147.52 | Cum | - | - |
| 5 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 4,200 | Cum | - | - |
| 6 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 4,725 | Cum | - | - |
| 7 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-II Material | 5,268.75 | Cum | - | - |
| 8 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead | 11,283.75 | Cum | - | - |
| 9 | Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 45,135 | Sqm | - | - |
| 10 | Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 45,135 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 3.86 MB
BOQ.xls
BOQ • 0.31 MB
Tenderdocument_2.pdf
Tender Documents • 0.66 MB
Tenderdocument_3.pdf
Tender Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .