| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | ₹11.3 L | L1 | Accepted-AOC Lowest rate quoted at 2 percentage below estimate including GST |
| 2 | L2₹12.1 L+₹81,936.40 (7.24%)Rejected-AOC | ₹12.1 L+₹81,936.40 (7.24%) | L2 | Rejected-AOC Second Lowest rate quoted at 5.10 percentage above estimate including GST |
Tender Value
₹9.8 L
EMD Value
₹24,450
Closing Date
11 Mar 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakad
Providing HT line using ABC From Mankundayam to Palamukku under Electrical Section, Kallara of Electrical Division, Nedumangad under Electrical Circle, Kattakada
2026_KSEB_841595_1
EE/PMU(KTDA)/ET-47/2025-26 dated 27.02.2026
Open Tender
Electrical Works
Percentage
120 days
Kallara
6 documents required · 6 mandatory
₹2,360
₹24,450
4 Jun 2026
27 Feb 2026
16 Mar 2026
27 Feb 2026
11 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 28 | E | 164.67 | ₹4,610.76 |
| 2 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 2 | No | 8,735.82 | ₹17,471.64 |
| 3 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. | 2 | No | 481.95 | ₹963.9 |
| 4 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 114 | No | 762.14 | ₹86,883.96 |
| 5 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). | 2 | No | 4,805.95 | ₹9,611.9 |
| 6 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 20 | No | 1,923.64 | ₹38,472.8 |
| 7 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 25 | No | 879.23 | ₹21,980.75 |
| 8 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 15 | No | 1,778.32 | ₹26,674.8 |
| 9 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 80 | No | 3,274.36 | ₹2,61,948.8 |
| 10 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 2 | No | 2,795.55 | ₹5,591.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1419284.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BID.pdf
Tender Documents • 0.87 MB
BOQ_1419284.xls
BOQ • 0.26 MB
Corrigendum2.pdf
PDF • 0.27 MB
datecorri47.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .