Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SHEESHMAHAL KATHGODAM ALMORA | Admitted-Finance |
| 2 | Admitted-Finance DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Aug 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, EDD, Almora
EDD, Laxmeshwar, Almora
Fixing of 250 KVA T/F at Chaughanpata
2021_UPCL9_34370_1
27/2021-22/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
Chaughanpata
As per Tender Document
2 documents required · 2 mandatory
₹295
Yes
Executive Engineer, EDD, Almora
Exempted
4 Aug 2021
12 Jul 2021
3 Aug 2021
12 Jul 2021
2 Aug 2021
12 Jul 2021
60 days
Amount
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End 10 Km ST pole SP-33
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End 10 Km ST pole SP-21
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End 10 Km other Small Material
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End 10 Km T/F 11/0.04 KV 250 KV
Head load cartage of following materials from Dump store to pitsite ava. Lead distance 0.5 KmST Pole SP-33
Head load cartage of following materials from Dump store to pitsite ava. Lead distance 0.5 KmST Pole SP-21
Head load cartage of following materials from Dump store to pitsite ava. Lead distance 0.5 KmOther small materials
Head load cartage of following materials from Dump store to pitsite ava. Lead distance 0.5 KmT/F 11/0.4 KV 250 KVA
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.767x11=8.347 cum)
Erection of following Single Support Pole of SP-33 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.
Erection of following Single Support Pole of SP-21 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.(0.190*11=2.09)
Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc.
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.432x4=1.732 cum)
Fixing, Tightneing and nozzling of stay with pole and stay rod on required tension as per drawing/RESPO Norms.
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.
Mounting/Fixing of Fuse set on double pole structure including making of connection complete work
Mounting/Fixing of Lightning arrestor set (3 nos.) on Double pole structure including making all connections by GI strip size 35x6 mm to earth point(including cost of GI Strip).
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.Excavation of earth of size 2.1x2.1x1.2 meter
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.Cement Concreting work in ratio 1:4:8
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.Brick work in 1:4 ratio
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.RR massonary work in 1:6 ratio
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.RCC work of 1:2:4 ratio 15 cm thickness
Construction of transformer plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as per RESPO Norms.Cement Plaster on side walls in 1:4 ratio
Installation of new transformer on plinth and fixing of channel etc. and making all connection of HT and LT side and its complete commissioning.250 KVA
Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contrector), connecting the same with GI strip(to be supplied by contrector) of size 35x6mm for a minium length 6m, treatment of soil with highly conductive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in MB before and after installation of earthing . The earth resistance after earthing should be less then 1 Ohm.
Erection, providing and fixing of 50x35mm wire mesh of size 2(2+4) meter around plinth and toe wall duly welded with frame of MS angle iron 35x35x6mm and strip of size 35x6mm in mid of each side along with wire mesh (width od wire mesh 1.5 meter) with the hight of 1.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangement in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravelling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminum paint with two coat (including th ecost of cement and all materials).
Laying,Sagging & binding of AB cable LT Line complete including fixing of LT Distribuion box,
J D M ENTERPRISES
MAA JAGDAMBA TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .