| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC H 99 6TH CROSS STREET R M COLONY DINDIGUL | ₹1.7 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹1.8 Cr+₹6.5 L (3.74%)Rejected-Finance MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | ₹1.8 Cr+₹6.5 L (3.74%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.7 Cr+₹2.2 L (1.30%)Rejected-Finance | ₹1.7 Cr+₹2.2 L (1.30%) | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
19 May 2023, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Upgradation/ Strengthening of 2 nos Rural Roads in Dindigul Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-69
2023_RDTN_309549_1
DIPR/2018/Tender/2023 DINDIGUL DISTRICT
Open Tender
Civil Works
Item Wise
180 days
DINDIUGL DISTRICT
Upgradation/ Strengthening of 2 nos Rural Roads in Dindigul Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-69
6 documents required · 6 mandatory
₹0
₹1.8 L
DRDA,DINDIGUL
13 Jul 2023
2 May 2023
19 May 2023
2 May 2023
19 May 2023
2 May 2023
15 May 2023
Amount
1. Strengthening of the Road from Nallamanaickenpatty to Alagar Naickenpatty Road KM 0/0 - 1/300 (R-37) Estimate amount Rs.53.82 lakhs Part A - Construction Work Clearing the light jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete. MORD Specification 111, 112, 201 km 0/0-0/94
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on back with an iniEarth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Road Marking without applied Thermoplastic compound with Reflector Glass based on Bitumenous Surface
Suppy of Kilometre Stone of size 1.65m x0.45 x0.15m including all charges etc,
Suppy of Hectametre Stone of size 0.90 x 0.15cx 0.15 m including all charges etc,
Provision for Name board cum Citizen Information Board
Provision for 60 cm Equilateral triangle cautionary Sign Board
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
2. Strengthening of the Road from Kannapatty to Kalakkanuthampatty Susaipatty Road KM 0/0 - 2/150 Estimate Amount Rs. 116.60 lakhs Part A - Construction Work Clearing the light jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Macadum 50mm thick using IRC size machine broken HBG metal 0.20 cum of 26.5 - 13.2mm , 0.43 cum 13.2 - 2.36mm and 0.08 cum of 2.36mm& bvelow metal with 36kg of of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Road Marking without applied Thermoplastic compound with Reflector Glass based on Bitumenous Surface
Suppy of Kilometre Stone of size 1.65m x0.45 x0.15m including all charges etc,
Suppy of Hectametre Stone of size 0.90 x 0.15cx 0.15 m including all charges etc,
Construction of 1.50m Span Culvert CH 1800
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Below GL
Above GL
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Refilling the basement with excavated earth behind the Abutment & inbetween the wings including all labour charges etc., complete
Provision for Name Board cum Citizen information Board
Provision for Sign Board
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.RAVI CONTRACTOR
SRI KUMARAN CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .