| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹22.2 L+₹1.1 L (5.00%)Rejected-Finance | L2 | Rejected-Finance l2 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
29 Feb 2024, 6:00 pmClosed
AMBILI N S
Office of the Assistant Engineer LID EW Section, Uzhamalakkal Grama Panchayat
UZML234/24 Paruthikuzhi Stadium Manthikuzhi Anganavadi Kunninpuram Charuvallikkonam Kanjirampara - Kooppil Paruthikuzhi roads rennovation
2024_LSGD_661773_3
5/AE/LSGD/UZML/23-24 Phase V
Open Tender
Civil Works - Roads
Item Rate
180 days
Uzhamalakkal GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 Mar 2024
22 Feb 2024
4 Mar 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
22 Feb 2024 - 29 Feb 2024
Amount
Detailed Estimate
OD326319/2023-2024::Surface dressingof the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal od rubbish , lead up to 50m and lift up to 1.5m. All kinds of soil
OD326353/2023-2024:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and a lead upto 1000 m as per Technical Specification Clause 301.5
OD326316/2023-2024:Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, levelling the top at site and consolidation by ramming ,etc complete for improving the CBR value of subgrade
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65)
5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.9.1.2a:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 <br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
75.5.12.A.3.2Z:Seal Coat - Manual Means - Type C - Bitumen S-65 and Antistripping Agent <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case - III : Type C <br> (II) Bitumen (S-65)
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD373416/2023-2024:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer. GI. pipes
12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 <br> For height upto 5 m <br> I. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
OD326315/2023-2024:Supplying and fixing information board 75x60 cm using GI pipes as post and MS sheet surrounded by MS angles including painting, lettering and fixing in position as per the direction of Engineer - in- charge
AMBADI CONTRACTS
Bidder Name
AMBADI CONTRACTS
Satheesan T
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1025767.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .