Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.3 LAccepted-AOC | L1 | Accepted-AOC RATES ARE FOUND REASONABLE AND BEING L1 BIDDER | |
| 2 | L2₹30.6 L+₹1.3 L (4.28%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 3 | L3₹36.7 L+₹7.4 L (25.0%)Rejected-Finance MINISTRY OF DEFENCE MES JALPAIGURI WEST BENGAL | L3 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 4 | L4₹36.9 L+₹7.6 L (25.8%)Rejected-Finance VILL DEPOPARA BINNAGURI PO BINNAGURI DIST JALPAIGURI W B PIN 735 203 | JALPAIGURI | WEST BENGAL | 735203 | L4 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 5 | L5₹37.2 L+₹7.9 L (26.8%)Rejected-Finance | L5 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | L. B. SHARMA L7 | P .BANERJEE AND CO L8 | P. CHAKRABORTY CONSTRUCTION L5 | AKASH PRASAD GUPTA L1 | NARAYAN MAJUMDER L3 | R.MANJIT& CO L6 | M/S D S CONSTRUCTION CO L4 | AYAN DAS L9 | SALEMAN ALAM L2 | ROZI KHAN L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||||||||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of 3 Nos of single JCOs accn (single storey) in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R). | 1 | Lumpsum | 28,20,110.76 ₹28,20,110.76 | 29,03,876.46 ₹29,03,876.46 | 28,48,032.65 ₹28,48,032.65 | 22,21,000 ₹22,21,000 Lowest | 27,92,188.88 ₹27,92,188.88 | 28,48,032.65 ₹28,48,032.65 | 28,06,149.82 ₹28,06,149.82 | 29,31,798.32 ₹29,31,798.32 | 23,03,555 ₹23,03,555 | 29,94,000 ₹29,94,000 |
| 2.00SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||||||||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24. | 1 | Lumpsum | 1,02,154.73 ₹1,02,154.73 | 1,06,822 ₹1,06,822 | 1,05,784.59 ₹1,05,784.59 | 74,671 ₹74,671 Lowest | 1,06,303.15 ₹1,06,303.15 | 1,04,750.36 ₹1,04,750.36 | 1,06,821.7 ₹1,06,821.7 | 1,08,895.9 ₹1,08,895.9 | 95,000 ₹95,000 | 1,05,000 ₹1,05,000 |
| 3.00SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT) | |||||||||||||
| 3.01 | Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25(R). | 1 | Lumpsum | 1,34,144.1 ₹1,34,144.1 | 1,38,210 ₹1,38,210 | 1,39,564.07 ₹1,39,564.07 | 1,08,000 ₹1,08,000 Lowest | 1,37,531.58 ₹1,37,531.58 | 1,35,499.1 ₹1,35,499.1 | 1,38,209.08 ₹1,38,209.08 | 1,39,464.07 ₹1,39,464.07 | 1,11,000 ₹1,11,000 | 1,32,540 ₹1,32,540 |
| 4.00SCHEDULE 'A' PART-IV (AREA DRAINAGE) | |||||||||||||
| 4.01 | Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26. | 1 | Lumpsum | 22,846.28 ₹22,846.28 | 23,000 ₹23,000 | 23,303.18 ₹23,303.18 | 20,000 ₹20,000 Lowest | 24,902.42 ₹24,902.42 | 23,856.52 ₹23,856.52 | 25,130.88 ₹25,130.88 | 25,150.68 ₹25,150.68 | 20,150 ₹20,150 | 22,570 ₹22,570 |
| 5.00SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION) | |||||||||||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 27 to 32. | 1 | Lumpsum | 2,46,695.75 ₹2,46,695.75 | 23,100 ₹23,100 Lowest | 2,44,669.35 ₹2,44,669.35 | 1,97,273 ₹1,97,273 | 2,19,162.74 ₹2,19,162.74 | 2,44,669.35 ₹2,44,669.35 | 2,20,264.07 ₹2,20,264.07 | 2,44,669.35 ₹2,44,669.35 | 2,13,000 ₹2,13,000 | 2,21,450 ₹2,21,450 |
Tender Value
₹36.9 L
EMD Value
₹73,800
Closing Date
25 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
PROVN OF SINGLE JCOS LIVING ACCN AT BINNAGURI MIL STN UNDER GE (SOUTH) BINNAGURI
2025_MES_706473_1
8230/E8
Open Tender
Civil Works
Lump-sum
180 days
BINNAGURI MIL STATION
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (S) BINNAGURI
₹73,800
Yes
14 Aug 2025
2 May 2025
26 Jun 2025
2 May 2025
25 Jun 2025
18 Jun 2025
Amount
SCHEDULE 'A' PART-I (BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of 3 Nos of single JCOs accn (single storey) in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R).
SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24.
SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT)
Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25(R).
SCHEDULE 'A' PART-IV (AREA DRAINAGE)
Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26.
SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 27 to 32.
SCHEDULE 'A' PART-VI (HOT WATER SUPPLY)
Lump sum price worked out by the contractor for (HOT WATER SUPPLY) as listed in Schedule ‘A’ Part-VI of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VI on Serial Page No. 33.
SCHEDULE 'A' PART-VII (SEWAGE DISPOSAL)
Lump sum price worked out by the contractor for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-VII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VII on Serial Page No. 34 to 35.
SCHEDULE 'A' PART-VIII (EXTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-VIII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VIII on Serial Page No. 36.
SCHEDULE 'A' PART-IX (INTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for (INTERNAL WATER SUPPLY) as listed in Schedule ‘A’ Part-IX of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IX on Serial Page No. 37 to 40.
SCHEDULE 'A' PART-X (EXTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for (EXTERNAL ELECTRIFICATION) as listed in Schedule ‘A’ Part-X of (Representing ________________% ____________________ Persentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-X on Serial Page No. 41.
SCHEDULE 'A' PART-XI (MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (TO BE QUOTED BY CONTRACTOR))
S&F of Modular TV socket, 1 module 6 Amp one way, ISI marked, complete all as specified and as directed by Engineer-in-charge.
S&F non-metallic rigid PVC medium grade 20mm dia conduit and conduit accessories (ISI Marked) concealed in wall, complete all as specified and as directed by Engineer-in-charge.
M&L for sheet metal enclosure fabricated out of 2.0 mm thick CRCA sheet, totally enclosed type, dust & vermin proof, with suitable sized supporting MS angles & suitable openings at top & bottom for entry of outgoing / incoming cables, fixed with nuts & bolts, front side openable with hinged shutter with suitable locking arrangement duly painted with 2 coats of powder coated paint over a coat of red oxide primer (spray paint) with minimum dimensions (90 x 75 x 20 cm ) flush to wall for incorporating 01 No TPN DB, 05 Nos electronic meters etc complete all as specified and as directed by Engineer-in-charge.
M & L for horizontal boring across the existing road without disturbing the road surface for inserting GI pipe, Complete all as specified and directed by Engineer-in-Charge. Note :- GI pipe Shall be measured and paid respective
SALEMAN ALAM (BID ID -3335882)
NARAYAN MAJUMDER (BID ID -3334368)
M/S D S CONSTRUCTION CO (BID ID -3334330)
P. CHAKRABORTY CONSTRUCTION (BID ID -3334544)
R.MANJIT& CO (BID ID -3329226)
L. B. SHARMA (BID ID -3334342)
P .BANERJEE AND CO (BID ID -3336947)
AYAN DAS (BID ID -3336032)
ROZI KHAN (BID ID -3329145)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .