Tender Value
₹89.4 L
Closing Date
1 Sept 2026, 4:00 pm4d left
R G DESAI
Tender for Bi-Annual Rate Contract for the work of shifting of various 66/132/220 KV Class existing Transmission lines under deposit work under Himatnagar Circle.
337032
2026-27/HTC / 43
Open
Electrical and Maintenance Works
Works
Sabarkantha
18 documents required · 18 mandatory
₹5,900
GETCO,Himatnagar
20 Aug 2026
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
SR No. Amount
Tender for Bi-Annual Rate Contract for the work of
shifting of various 66/132/220 KV Class existing
Transmission lines under deposit work under
Himatnagar Circle
Welfare cess @ 1.00 %
Total in Rs
Item Wise Rate
DESCRIPTION QTY. UNIT RATE AMOUNT
The work of detail survey, preparation and submission of
profiles in 6 copies (PLSCAD as well as hardcopy),
Detail scope of Work :-
(a) Fixing of tower as per actual requirement, site
condition and plotting of line on profile having standard
details i.e. span length, lat-long (co-ordinate), chainage,
weight and wind span, all dimensions, scale, legends,
tower spotting data etc. as per requirement and along
with all require details.
(c) Preparation and submission of tower schedule as per
standard require details with all the Major - Minor crossing
details in profile drawing and tower schedule, along with
due care of clearance as per prevailing standards i.e., for
all electric line with pole, all type of track, river, pond,
nala, road, canal etc.
(d) Details of Right of Way in profile drawing. i.e. Building,
Temple, Well etc.
(g) Plotting line on TIKKA-MAP (Revenue Land map) -
Required TIKKA-MAP will be provided by GETCO.
Importantly, any work other than mentioned will align with
the specific requirements outlined by the Engineer-in-
Note : The survey report will be submit with sign and
stamp of the surveyor agency and engineer in
2 Check Survey 5 KM. 9277.00
Excavation excluding back filling but including, shoring
shuttering, dewatering tree cutting for tower footings etc.
4 {A} Normal Soil either Dry or Wet/ Sandy Soil 400 Cu.M. 307.00
5 {b}Black Cotton Soil either dry or wet. 400 Cu.M. 614.00
(c) Normal submerged/marine soil where dewatering is
(d) Black Cotton submerged/marine soil where dewatering
is necessary
8 (e) Soft Rock 1 Cu.M. 1066.00
9 (f) Hard Rock 1 Cu.M. 2212.00
Installation of steel reinforcement in concrete foundation
10 including supply of M.S. bars, binding wire & their cutting, 7 MT 99900.00
bending, binding and laying in position as per drawing
Stub Setting with prop or templet including back filling but
excluding excavation and concreting etc, for all types of
towers/extensions except special towers. (Weight of stub,
11 cleat & template with bolt & nuts of stub & template shall
be counted).for up to 6 mtr. ext.
Up to 6 Mtr Extn 15 MT 8206.00
12 Up to 9 to 25 Mtr Extension 5 MT 9918.00
Concreting of foundation by M-20/M15 mixture including
shoring, shuttering, dewatering etc for normal tower/tower
13 with extension up to 21 Mtr (Rates are with cement)
(a) M-20 mixture 135 Cu.m 12246.00
Concreting of foundation by M-20/M15 mixture including
shoring, shuttering, dewatering etc for normal tower/tower
14 with extension up to 21 Mtr (Rates are with cement)
(b) M-15 mixture 12 Cu.m 10306.00
Grounding of towers with pipe type earthing including
excavation and back filling and supply of all materials like
32mm dia heavy duty 3 mtr long GI Pipe & 50x6 mm GI
flat, bolt-nuts salt, coal/charcoal etc as per drawing
Grounding of towers with COUNTER POISE TYPE
including excavation and back-filling and supply of all
materials like GSS wire, lugs, bolt-nuts, salt, coke/charcoal
as per drawing.
Erection of Super Structure Upto 6 Meter extension
including tree cutting, fixing of tower accessories,
attachments except ACD/ DP/ NP/ CIP/ PP and excluding
tack welding of bolts. This includes taking delivery of tower
materials and bolt-nuts from Board's stores etc for normal,
extension & special towers at destination and keeping
them in safe custody and transporting the same to erection
Same as above but erection of 9/12/15/18/21 Mtr.
Extension portion only.
Stringing of one ground wire including
laying,joining,tensioning,clamping with
19 accessories,jumpering & sister wire,vibration 2 16843.00
damper,earth bond etc. and including tree cutting for
66/220kV Dog/Panther/Zebra/Al-59 tower
Stringing of ACSR/AAAC 3 (Three) conductors for single
circuit including laying, jointing, tensioning, clamping with
armour rods, hoisting of insulator string fixing of
20 jumpering, dampers etc. & with required tree cutting on 2 39916.00
entire length for adquate clearances / safe charging of
ACSR Dog Conductor
Same as above but stringing of ACSR Panther (Three) Route
conductor. Km.
Stringing of ACSR/AAAC 6 (Six) conductors for double
circuit including laying, jointing, tensioning, clamping with
armour rods, hoisting of insulator string fixing of jumpering, Route
dampers etc. & with required tree cutting on entire length Km.
for adquate clearances / safe charging of line.
ACSR Dog Conductor
Same as above but stringing of ACSR Panther (Six) Route
conductor. Km.
Dismantling of conductors and line materials of existing
line with :
A) Cold Condition
- 3 Conductors (S/C) Dog
30 - 3 Conductors (S/C) Panther 1.5 RKM 33506.00
31 - 6 Conductors (D/C) Dog 1.5 RKM 48354.00
32 - 6 Conductors (D/C) Panther 2 RKM 67012.00
33 - 1 Earthwire 1 RKM 9985.00
Complete Installation of OPGW cable (24/48 fibres)
including laying, providing required hardwares, in line
splices to be encased in Fibre Optic Splice Enclosures,
Laying and termination of a fibre optic approach cable
38 required to connect Overhead Fiber Optic Cable (OPGW) 1 KM. 97193.00
between the final iin line splice enclosure on the
gantry/tower and the Fibre Optec Distribution panel
(FODP) to be installed within the building at both the
substation ends as per technical specifications
39 Link up of OPGW cable including all related activities 1 KM. 8850.00
Fixing of Anti climbing devices including supply of barbed
40 wire (except special towers). 8 Loc 2596.00
Fixing of Anti climbing devices including supply of barbed
wire (except special towers).(b) 132KV
Fixing of Anti climbing devices including supply of barbed
42 wire (except special towers). 6 Loc 3589.00
Fixing of DP / NP / PP / CIP including supply of plates and
43 supply of G.I. bolts-nuts & tack welding as per drawings 12 Loc 1690.00
and as per instruction of EIC. i) S/C
Fixing of DP / NP / PP / CIP including supply of plates and
44 supply of G.I. bolts-nuts & tack welding as per drawings 12 Loc 3379.00
and as per instruction of EIC. i) D/C
Fixing of DP / NP / PP / CIP including supply of plates and
45 supply of G.I. bolts-nuts & tack welding as per drawings 12 Loc 6758.00
and as per instruction of EIC.1) M/C
Tack welding of nuts upto Approx 10 Mtrs height or two
bottom- most panel from ground level at three places on Per
nuts diametrically and applying zinc rich paint immediately Bolt
Dismantling of any type of tower including transportation &
47 crediting to nearest Board's store as per instruction of 5 Per MT 8434.00
Engineer in-charge.
Cutting of stubs of old tower to be dismantled including
breaking of chimney/cutting of RCC upto 450mm below Per
ground level & crediting stubs & steel bars to GEB Store Tower
including back-filling & leveling of site.
Painting of name of line,location number,colour code and
49 telephone number on tower etc.for information of 8 Loc 431.00
concerned substation incl. supply of paints etc. b) Two legs
Painting of name of line,location number,colour code and
50 telephone number on tower etc.for information of 10 Loc 862.00
concerned substation incl. supply of paints etc. a)Four legs
Erection of 'H' Frame structure with channels, bracing,
clamps etc for 'A'/'B' type location including excavation in
Normal/block cotton soil (Dry/Wet/Submerged) and back
filling of earth, ramming and with supply of bolts, nuts and
painting of the complete structure including required tree
51 cutting. Before erection, one coat of good quality primer 4 No 11771.00
must be applied to the complete structure and black Japan
paint of standard make should be applied up to 3 mtr. from
bottom. After erection, two coats of aluminium paint of
Asian/Burger/Nerolac make shall be applied to the
complete structure.
Same as above but for angular location up to 60 degree
deviation / dead end-" C' type.
original survey with route allignment (3 alternative route)
on survey of india toposheets; detailed survey; preparation
and submission of route allignment with modern
53 techniques in 6 copies & provinding precast permenant 1.00 KM. 5247.00
concret blocks/ stones of 600 mmx 300mmx 100 mm on
each deviation point on entire line with chaIn age painted
Erection of 105 Lbs/ Rail or RSJ 150x150 mm size single
pole as per work indicated in item sr No.1
Stringing of ACSR/AAA 3 (Three) Dog conductors for
single circuit including laying, jointing, tensioning, clamping
55 with armour rod, fixing of dampers etc. complete as per 3 KM. 27071.00
specification including required tree cutting with adequate
clearance.
Stringing of ACSR/AAA 3 (Three) Panther conductors for
single circuit including laying, jointing, tensioning, clamping
56 with armour rod, fixing of dampers etc. complete as per 3 KM. 36094.00
specification including required tree cutting with adequate
clearance.
Grounding of above 'H' frame/single pole structure with
pipe type earthing as per drawing including excavation by
augering & black filling & supply of all materials like
32mm dia.Medium duty 2 mtr. Long GI pipe (B Class -
Blue mark) & G.I. flat of 50 x 6 mm size including supply
of bolt, nuts salt, coal, charcoal etc. as per drawaing.
Erection of stay set complete with stay clamp, turn
58 buckle, eye bolt, anchor rod and binding with 7/8 or 7/10 25 Set 802.00
SWG earth wire.
Providing concerete for all the structures, with M15 mix.
Including stay sets with supply of materials like cement of
43 grade, sand, metal etc. with muffing (400 mm Dia x
300 mm Ht. above ground level for all the structures.
Tack welding of nuts at three places on the nuts
diametrically fitted to 'A', 'B' and 'C' TYPE structure and Per
applying red oxide & zinc rich paint on it immediately after bolt
tack welding.
Transportation of Grider / Rail from Board's nearest Store
61 Centre to one end of the line including loading and
unloading.
62 (i) Within range of 70 KMs. 4 20 16848.00
63 upto 70KMs (Beyond 6 MT) - proportionate 40 Per MT 2808
64 (ii) More then 70 KMS 300 22.00
Conversion of 'A' type 'H' frame structure into 'B' Type 'H'
frame structure in existing line by replacing necessary
channels etc, and termination and restringing of Dogs ot Job
Panther 3 conductors for making LILO arrangement with work
existing line or for change over of line during availibility of
specified outage only.
Dismantling of 'A' & 'B' type 'H' frame structure by
breaking of muffing upto 450mm depth from ground level
66 and cutting the griders from 450mm depth from ground 4 Loc 7656.00
level by gas cutting & crediting the material to Const.
Store as instructed by Engineer In-Charge
67 ---- DO ---- but for 'C' type structure 2 Loc 11055.00
Dismantling of all three conductors and line materials
such as insulators, hardwares etc. and crediting to the
Board's Store as per instruction of Engineer in-chargewith
submission of pole wise inventory for preparing C.R. note.
Providing & fixing of NP with name of line / DP including
69 supply of bolts & nuts and tack welding / punching as per 6 Loc 1195.00
Providing & fixing of ACD on Single Pole girders as per
drawing and as per instruction of EIC.
Providing & fixing of ACD on A / B Type H-Frame as per
drawing and as per instruction of EIC.
Providing & fixing of ACD on C Type H - Frame as per
drawing and as per instruction of EIC.
Work of Painting of Line name, Location No., two coat
Painting Color code of desired length and telephone no. on
73 Single Pole girder with letter of Gujarati language using ISI 6 Loc 108
marked Paint as per instruction of EIC including Supply of
paints and other require materials.
Work of Painting of Line name, Location No., two coat
Painting Color code of desired length and telephone no. on
74 H-Frame (2 Leg) with letter of Gujarati language using ISI 6 Loc 216
marked Paint as per instruction of EIC including Supply of
paints and other require materials.
Erection of 66KV Double C type H frame structure for
angular location upto 60-degree deviation/ dead end with
channels, bracings, clamps etc. for double C type location
including excavation, in normal/black cotton soil
(Dry/Wet/submerged) and backfilling of earth, ramming
and with supply of bolts, nuts, grounding with pipe type
earthing as per drawing including excavation and back
filling and supply of all materials like 32mm dia medium
duty 2 mtr. long GI pipe (B class - Blue mark) and GI Flat
of 50X6 mm size including supply of bolt nuts, salt, coal,
charcoal, providing and fixing of NP with name of line/DP
incl. supply of bolt and nuts and tack welding /punching as
per drawings, Tack welding of nuts at three places on the
nuts diametrically fitted to C ype structures and applying
red oxide and zinc rich paint on it immediately after tack
welding etc. as per drawing and painting of the complete
structure including required tree cutting and transportation
of all require materials as per instruction of EIC . Before
erection, one coat of good quality primer must be applied
to the complete structure and black Japan paint of
standard make should be applied upto 3 mtr. from bottom.
After erection. two coats of aluminum paint of Asian,
Burger, Nerolac make shall be applied to the complete
structure. (Work includes name of line , location number,
color code and telephone number on D.P.(2 legs) for
information of concerned S/S incl. supply of paints etc.
providing and fixing of ACD on all the girders as per
TOTAL(Rs.)
GST 18% (Rs.)
TOTAL(Rs.)
Remarks- Quantities are considered tentative, Once the exact fault is identified, a
separate sub-work order will be issue for specific quantities and costs.
(1) While calculating the weight of stub-setting, the weight of stub, cleat & templates shall also be added in stub weight.
(2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
(3) The above rates are with supply of GETCO approved cement and steel by the contractor.
(4) For concreting work, mixture machine is to be used as per site condition and as per inst. of EIC.
(5) Tower dismantling work should be carried out with help of using rust free spray and without cutting of any members
/ leg / stub and as per inst. of EIC,where applicable.
(6) While crediting of material, agency has to submit the original gate pass copy / CR copy with required documents
as per instruction of EIC.
(7) The rate indicated above includes taking delivery of all stringing material from contractor store/ GETCO’s store
keeping them in safe custody and transporting the same to erection site.
(8) For any crediting of material related work, agency has to submit the original gate pass copy / CR copy with required
documents as per inst. and as per requirement of EIC or when demanded.
(9) All ‘H’ frame A, B, C type structures, tension guys are to be fully concreted and wind guys shall be concreted for
mtr. height only.
(10) In case of excavation in SOFT / HARD ROCK for Item Sr. No. 29, 31,32 & 35, additional rate of Rs. 1021- / & 2118/-
per CMT respectively shall be paid separately.
(11) Except item No 39, all the rates indicated above includes taking delivery of all stringing material from GETCO’s store
at destination & keeping them in safe custody & transporting the same to erection site. Similarly the rates of erection
at Sr.No. 29, 31, & 32 above includes transportation of material from one end of line to erection site.
CERTIFICATE
I we am / are willing to carry out the above work at_______________________________________ % above / below (percentage)
should be written in figures and words. ___________________________________________________________Percentage above /
below the tender amount work out Rs. ______________________________________________Rupees in
words____________________________________________________________________________
Signature of Contractor,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026-27 HTC 43 Tech Bid.pdf
2026-27 HTC 43 Price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].