| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 L+₹43,952.28 (5.53%)Admitted-Finance | ₹8.4 L+₹43,952.28 (5.53%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 L+₹67,709.89 (8.52%)Admitted-Finance KALPAKANCHERY 676 551 | MALAPPURAM | KERALA | 676551 | ₹8.6 L+₹67,709.89 (8.52%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shamsudheen P L1 | ANOOP KUMAR P L2 | MOHAMMED RIYAS K L3 |
|---|---|---|---|---|---|---|
| 1.00pond | ||||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil | 18.62 | cum | 328.35 ₹6,115.52 Lowest | 346.5 ₹6,453.56 | 357 ₹6,649.13 |
| 1.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 18.62 | cum | 3,649.6 ₹67,973.8 Lowest | 3,851.4 ₹71,732.33 | 3,961 ₹73,773.63 |
| 1.03 | OD18730/2026-2027
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 54.01 | cum | 9,250.5 ₹4,99,647.26 Lowest | 9,761.8 ₹5,27,264.1 | 10,040 ₹5,42,290.52 |
| 1.04 | 100.3.1.4
Earthwork in open well excavation (above water) for wells of diameter up to 2.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. | 233.8 | cum | 779 ₹1,82,130.2 Lowest | 822.15 ₹1,92,218.67 | 845 ₹1,97,561 |
| 1.05 | 60.2.6
BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP - Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 32 | hour | 1,216.8 ₹38,937.6 Lowest | 1,284 ₹41,088 | 1,320 ₹42,240 |
Tender Value
₹10 L
Closing Date
8 Jun 2026, 5:00 pmClosed
Baiju T.P
Forest Industries Travancore Limited , Aluva
Construction of Pond
2026_FITL_853335_1
FIT/CP-14/2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
Valanchery Muncipality
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
Exempted
Forest Industries Travancore Limited
17 Jun 2026
29 May 2026
9 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
29 May 2026 - 3 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1pond | |||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.03 | OD18730/2026-2027
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.04 | 100.3.1.4
Earthwork in open well excavation (above water) for wells of diameter up to 2.50m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. | - | cum | - | - |
| 1.05 | 60.2.6
BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP - Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1442106.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .