Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.2 L+₹1.0 L (14.0%)Rejected-Finance | ₹8.2 L+₹1.0 L (14.0%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.8 L+₹1.6 L (21.9%)Rejected-Finance | ₹8.8 L+₹1.6 L (21.9%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | T SURESH BABU L1 | K V Mammu L3 | RAHOOF C P L2 |
|---|---|---|---|---|---|---|
| 1.00Maintenance | ||||||
| 1.01 | 2.31:Clearing jungle including uprooting of rank vegitation grass brush wood,trees and sapling of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. | 112.5 | M2 | 15 ₹1,687.5 Lowest | 19.2 ₹2,160 | 18 ₹2,025 |
| 1.02 | 13.88 Removing white or colour wash by scrapping and sand papering and preparingthe surface smooth including necessary repairs to scratches etc. complete | 88.02 | M2 | 17 ₹1,496.34 Lowest | 22.4 ₹1,971.65 | 21 ₹1,848.42 |
| 1.03 | 50.10.1: Steel work in built up G I tubular(round,square or rectangular hollow tubes etc.) trussess etc. including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc. complete. | 677 | Kg | 199 ₹1,34,722.6 Lowest | 249 ₹1,68,572.5 | 233 ₹1,57,740.53 |
| 1.04 | 50.10.2:Steel work for purlin/single section with GI pipe including cutting ,hoisting,fixing the position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc. complete. | 495.54 | Kg | 169 ₹83,746.26 Lowest | 202 ₹1,00,099.08 | 189 ₹93,657.06 |
| 1.05 | 50.13.1: 9 mm cement plastering of mix 1:3(1cement,3 sand) including all cost of materials labour charges etc. complete. | 16.3 | M2 | 310 ₹5,053 Lowest | 370 ₹6,031 | 346 ₹5,639.8 |
| 1.06 | 18.48 Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI 12701marked,withcover and suitable locking arrangements and marking necessary holes for inlet,outlet and overflow pipe but without fittings and the base support for tank | 1,000 | Ltr | 10 ₹10,000 Lowest | 12.8 ₹12,800 | 12 ₹12,000 |
| 1.07 | 13.98.1 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 499.99 | M2 | 95 ₹47,498.67 Lowest | 123 ₹61,498.28 | 115 ₹57,498.39 |
| 1.08 | 13.111.1 Finishing walls with acrylic smooth exterior paint with silicon additives of required shade :Old work(Two or more coat applied @ 1.67ltr/10sqm)on existing cement paint surface. | 238.52 | M2 | 121 ₹28,860.92 Lowest | 151 ₹36,016.52 | 141 ₹33,631.32 |
| 1.09 | 13.99.1:Painting with synthetic enemel paint of approved brand and manufacture of required colour to give an even shade : one or moore coats on old work. | 97.48 | M2 | 97 ₹9,455.95 Lowest | 117 ₹11,405.63 | 110 ₹10,723.24 |
Tender Value
₹7.8 L
EMD Value
₹19,500
Closing Date
16 May 2026, 4:00 pmClosed
Divisional Forest Officer
Divisional Forest Officer South Wayanad Forest Division Pinangode Road, Kalpetta
Maintenance work for DFO Quarters Rattakolly in Meppady Range during 2026-27
2026_FD_849851_1
KFDDO/23091/2026-DFOWYNDS-G1
Open Tender
Civil Works - Buildings
Item Rate
45 days
Rattakolly
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,837
Yes
₹19,500
Yes
17 Jul 2026
8 May 2026
19 May 2026
8 May 2026
16 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.01 | 2.31:Clearing jungle including uprooting of rank vegitation grass brush wood,trees and sapling of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. | - | M2 | 16.97 | - |
| 1.02 | 13.88 Removing white or colour wash by scrapping and sand papering and preparingthe surface smooth including necessary repairs to scratches etc. complete | 1 | M2 | 19.12 | ₹19.1 |
| 1.03 | 50.10.1: Steel work in built up G I tubular(round,square or rectangular hollow tubes etc.) trussess etc. including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc. complete. | 0.2 | Kg | 215.54 | ₹43.11 |
| 1.04 | 50.10.2:Steel work for purlin/single section with GI pipe including cutting ,hoisting,fixing the position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc. complete. | - | Kg | 174.58 | - |
| 1.05 | 50.13.1: 9 mm cement plastering of mix 1:3(1cement,3 sand) including all cost of materials labour charges etc. complete. | - | M2 | 320.87 | - |
| 1.06 | 18.48 Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI 12701marked,withcover and suitable locking arrangements and marking necessary holes for inlet,outlet and overflow pipe but without fittings and the base support for tank | - | Ltr | 11.34 | - |
| 1.07 | 13.98.1 Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 0.4 | M2 | 106.35 | ₹42.43 |
| 1.08 | 13.111.1 Finishing walls with acrylic smooth exterior paint with silicon additives of required shade :Old work(Two or more coat applied @ 1.67ltr/10sqm)on existing cement paint surface. | - | M2 | 130.63 | - |
| 1.09 | 13.99.1:Painting with synthetic enemel paint of approved brand and manufacture of required colour to give an even shade : one or moore coats on old work. | 0.6 | M2 | 101.32 | ₹60.69 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1436010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
Pre.pdf
Tender Documents • 0.07 MB
epayment.pdf
Tender Documents • 0.04 MB
BOQ_1436010.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .