| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L Quoted ₹2.4 L | L1 | Accepted-AOC Award |
| 2 | L2₹2.6 LRejected-Finance | ₹2.6 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹2.6 LRejected-Finance | ₹2.6 L | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | BILBIR SINGH L2 | Munish Dwivedi L3 | Vikram Guleria L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge. | 3.91 | Cum | 390 ₹1,524.90 | 390 ₹1,524.90 | 365 ₹1,427.15 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts | 1.57 | Cum | 8,800 ₹13,816 | 8,600 ₹13,502 | 8,400 ₹13,188 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 1.28 | Cum | 9,100 ₹11,648 | 8,900 ₹11,392 | 8,600 ₹11,008 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts. | 39.76 | Sqm | 450 ₹17,892 | 460 ₹18,289.60 | 420 ₹16,699.20 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts | 2 | Sqm | 650 ₹1,300 | 610 ₹1,220 | 630 ₹1,260 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts. | 11.2 | Rmt. | 152 ₹1,702.40 | 130 ₹1,456 | 120 ₹1,344 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand) 3 graded stone aggregate 20 mm in all leads and lifts. | 9.54 | Cum | 10,200 ₹97,308 | 10,000 ₹95,400 | 9,800 ₹93,492 |
| 8.00 | Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15º landings, balconies, shelves, chajjas, lintels bands, plain window sills, staircases and spir stair cases above plinth level up to floor five leve excluding the cost of entering, shuttering, finishi and reinforcement, with 1:1.5:3 (1 cement : coarse sand): 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 0.52 | Cum | 10,650 ₹5,538 | 10,200 ₹5,304 | 9,900 ₹5,148 |
| 9.00 | Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. | 1,020.6 | Kg | 96 ₹97,977.60 | 99 ₹1.0 L | 92 ₹93,895.20 |
| 10.00 | Providing and Fixing of Precast SFRC Man Cover with Frame conforming to IS-12592 (F I)-1998 with latest ammendments 560 mm (Heavy Duty) in all leads and lifts | 2 | Nos | 3,800 ₹7,600 | 3,600 ₹7,200 | 3,450 ₹6,900 |
Tender Value
₹2.5 L
EMD Value
₹5,100
Closing Date
23 Mar 2026, 10:00 amClosed
Executive Engineer
EE JSV Mandi
C/O RCC Pillar Ejecting of Manhole Platform and C/O RCC Manhole Chamber at Lagni near House of Ashok Katoch
2026_HPIPH_131399_1
21931-22030
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹5,100
6 May 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work.chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights Suspended floors, roofs, landings, balconies and access platform in all leads and lifts
Centering and shuttering including strutting, propping etc. and removal of form for all heights Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand) 3 graded stone aggregate 20 mm in all leads and lifts.
Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15º landings, balconies, shelves, chajjas, lintels bands, plain window sills, staircases and spir stair cases above plinth level up to floor five leve excluding the cost of entering, shuttering, finishi and reinforcement, with 1:1.5:3 (1 cement : coarse sand): 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts.
Providing and Fixing of Precast SFRC Man Cover with Frame conforming to IS-12592 (F I)-1998 with latest ammendments 560 mm (Heavy Duty) in all leads and lifts
Please Enable Macros to View BoQ information
Terms and conditions
The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge.
The cement and Steel shall be issued by the department from JSV Divisional Store Raghunath Ka Padhar Mandi cement @ 368/- per bag, Steel Rs.7615/-only per qtl.
The Contractor will be fully responsible for watch and ward of material at site of work.
Nothing shall be paid for rejected/sub-standard material at site of works.
Concrete work shall be done by using vibrator and concrete mixing plant.
Crushed aggregate will be used in concrete work.
Material should be used of approved quarry.
The work should be completed in the stipulated period.
The rates should be inclusive with GST and carriage
1% labour cess will be deducted from the bill of the contractor.
GST as applicable will be borne by the contractor.
No deviation will be allowed without the prior permission of the Engineer-in-charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Form6.pdf
Tender Documents • 0.67 MB
Form8.pdf
Tender Documents • 1.05 MB
BOQ_194244.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid