Loading…
Loading…
Tender Value
₹17.6 L
EMD Value
₹17,600
Closing Date
30 Mar 2026, 6:00 pmClosed
Chairman / Secretary, A.P.M.C., Limbdi
Proposed Work of Kuttir for Seeting, Chips on Terrace and Compound Wall at The Limbdi A.P.M.C., Taluka : Limbdi, Dist : Surendranagar (Package No. 1)
288465
Online Tender Notice No. 1 / 2025-26
Open
Civil Works
Surendranagar
3 documents required · 3 mandatory
₹900
The Agricultural Produce Market Committee, Limbdi
₹17,600
20 Mar 2026
20 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
Name of work :- Proposed Work of Kuttir for Seeting, Chips on Terrace and Compound Wall at The Limbdi
A.P.M.C., Taluka : Limbdi, Dist : Surendranagar
RECAPITULATION SHEET
Sr. Sub Est. Description of Work Amount Put to Tender
1 1 Proposed Kuttir for Setting at The Limbdi A.P.M.C., Taluka : Limbdi, Dist :
2 2 Proposed Chips on Terrace on Office Building at The Limbdi A.P.M.C., Taluka : Limbdi,
Dist : Surendranagar
3 3 Proposed new compound wall construction work for 250.00 R.Ft. (822.02 R.Ft) As per
sketch (compound height above ground level upto 7 Feet) at The Limbdi A.P.M.C.,
Taluka : Limbdi, Dist : Surendranagar
Managing Director
Name of work :- Proposed Kuttir for Setting at The Limbdi A.P.M.C., Taluka : Limbdi, Dist : Surendranagar
Memorandum showing items works to be carried out :
SCHEDULE - " B "
Item Quantities Item of Works Estimated Rate Unit Total
No. Estimated Rs In Rs. in Amount
but may be Figures Words Accourding
more or to Estimated
less Rs. Ps Quantities
1 - Dismentale of Old IPS Flooring area etc - - L.S.
2 400.00 Providing and Fixing New Kuttir for setting 2300.00 Rs. Two Thousand Sq.Ft.
excavation , UCR Masonry , IPS Flooring, Three Hundred Only
Ruff for sit etc complete (20' x 20')
Contigency Charges of 2% as directed etc complete
Supervision Charges of 5% as directed etc complete
Goods Service Tax of 18% as directed etc. complete
Managing Director
Name of work :- Proposed Chips on Terrace on Office Building at The Limbdi A.P.M.C., Taluka : Limbdi, Dist :
Memorandum showing items works to be carried out :
SCHEDULE - " B "
Item Quantities Item of Works Estimated Rate Unit Total
No. Estimated Rs In Rs. in Amount
but may be Figures Words Accourding
more or to Estimated
less Rs. Ps Quantities
1 - Dismentale of Old IPS Flooring area etc - - L.S.
2 2450.00 Providing and Fixing Chips on Terrace with 105.00 Rs. One Hundred Sq.Ft.
C.M. Including curing etc complete Five Only
Contigency Charges of 2% as directed etc complete
Supervision Charges of 5% as directed etc complete
Goods Service Tax of 18% as directed etc. complete
Managing Director
Name of work :- Proposed new compound wall construction work for 250.00 R.Ft. (822.02 R.Ft) As per sketch
(compound height above ground level upto 7 Feet) at The Limbdi A.P.M.C., Taluka : Limbdi, Dist
: Surendranagar
Memorandum showing items works to be carried out :
SCHEDULE - " B "
Item Quantities Item of Works Estimated Rate Unit Total
No. Estimated Rs In Rs. in Amount
but may be Figures Words Accourding
more or to Estimated
less Rs. Ps Quantities
1 - Dismentle of old compound Wall and Stone - - L.S.
Masonnary etc. complete
2 750.00 Providing and Laying M.C.C. for foundation 90.00 Rs. Ninety Only Cu.Ft.
with mixing 40mm metal laying curing etc.
3 1687.00 U.C.R. Stone Masonary in C.M. 1:8 for S.S. 95.00 Rs. Ninety Five Only Cu.Ft.
upto plinth level (Above ground level upto
4 1750.00 Bela Stone Masonry for S.S. in C.M. 1:6 with 105.00 Rs. One Hundred Sq.Ft.
line , level, curing etc complete (above 7 Feet Five Only
5 375.00 Providing and laying D.P.C. in 1:2:4 on Plinth 100.00 Rs. One Hundred Sq.Ft.
include temping, curing etc complete Only
Contigency Charges of 2% as directed etc complete
Supervision Charges of 5% as directed etc complete
Goods Service Tax of 18% as directed etc. complete
Managing Director
I am / We are willing to carryout the work ...................................................% Above / Below
_________________ ____ percent (Should be written in figures and words ) Estimate rate mentioned above
amount of My / Our tender work put as under.
Estimate Amount Estimate Amount
[1] All work shall be carried out as per Public works Deptt. Hand Book and other specification or as directed
[2] Rates quoted include clearance of site (Prior commence of work and as its colse inall hold good for work
under all conditions, site moisture weather etc.
[3] The contractor shall exhibit a Board as per Govt. No.806/3277/1657 Dt. 26-04-78 (guj) RGR-No.TNC-1090/24-C
Dated 29-11-90 and GR. Dt. 18-11-91. involved at sitewith in any payment as directed by Engineer - in - Charge.
[4] Testing of materials shall be as per statement attached for quality control with specification., the materials shall be tested in
GREI for testing charges shall be paid byExecutive Engineer , and of amount put to tender after deducting the cost of
materialsas per Schedule - 'A' shall be recovered from contractor in Running bill as per G.R. of R&B Deptt. No. TNC/1085-4-
[5] The contractor shall be state even "NIL" precent of no reduction as offcered.
[6] One Percent of estimate cost put to tender for this work shall be recovered from the contract payment as "Labour Cess" in
terms of the Gujarat Government Gezette dated 12-12-2004 implementation of building & other construction worker's
(Rezolution of Employment and condition of service Act. 1996).
Signature of Managing Director
Contractor A.P.M.C.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1-Building_spe_Book.pdf
GR- Other.pdf
Index to Specification.pdf
NIVIDA-1_FULL 2025-26.pdf
NIVIDA-1_SHORT 2025-26.pdf
Qualification Criteria.pdf
SBD- Limbdi pack-1.pdf
Schedule-B pack-1.pdf
SITE VARIFICATION.pdf
TENDER NOTICE1- Parking Kuttir.pdf
tital-1.pdf
Download all tender documents and submit your bid