| Sl No | Description | Qty | Unit | Hussain. TK L1 | V. KUNHIMUHAMMED L2 |
|---|---|---|---|---|---|
| 1.00PROTECTION WALL TO POND | |||||
| 1.00 | 60.2.2
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection,cost of fuel, lubrication oil and other stores,
pay of staff etc complete | 80 | hour | 419.69 ₹33,575.2 Lowest | 419.69 ₹33,575.2 Lowest |
| 1.00 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 159.29 | cum | 236.63 ₹37,693.74 Lowest | 236.63 ₹37,693.74 Lowest |
| 1.00 | 2.26.1
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated
or stacked materials.All kinds of soil | 55.2 | cum | 120.34 ₹6,642.77 Lowest | 120.34 ₹6,642.77 Lowest |
| 1.00 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 24.18 | cum | 3,668.07 ₹88,693.93 Lowest | 3,668.07 ₹88,693.93 Lowest |
| 1.00 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.22 | cum | 7,086.51 ₹51,157.52 Lowest | 7,286.51 ₹52,601.32 |
| 1.01 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 6.04 | cum | 8,483.41 ₹51,282.21 Lowest | 8,483.41 ₹51,282.21 Lowest |
| 1.01 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 362.7 | kg | 103.26 ₹37,452.4 Lowest | 103.26 ₹37,452.4 Lowest |
| 1.01 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 9.3 | sqm | 354.69 ₹3,298.62 Lowest | 354.69 ₹3,298.62 Lowest |
| 1.01 | 50.6.7.1
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials,
labour charges etc. | 117.39 | cum | 7,489.25 ₹8,79,193.01 Lowest | 7,489.25 ₹8,79,193.01 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,833
Closing Date
26 Aug 2025, 4:00 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
Malappuram District Panchayath-Project No. 197-24- Rejuvenation of Ozhur Vishnu Temple Pond in Ozhur GP, Malappuram District
2025_KEL_788464_1
KRO/BDC/2084/2025
Open Tender
Civil Works - Others
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹29,833
Yes
28 Aug 2025
19 Aug 2025
27 Aug 2025
19 Aug 2025
26 Aug 2025
19 Aug 2025
19 Aug 2025 - 26 Aug 2025
Amount
PROTECTION WALL TO POND
60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.6.7.1 Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
OD59108/2025-2026 Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering & fixing
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
7.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
V. KUNHIMUHAMMED (BID ID -2303095)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .