Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.1 LRejected-Finance VILL HARINMARA P O KULAI BAZAR AMBASSA DHALAI TRIPURA PIN 799204 | AMBASSA | DHALAI | TRIPURA | 799204 | ₹3.1 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.1 LRejected-Finance AMBASSA COLONY P O AMBASSA AMBASSA DHALAI TRIPURA | AMBASSA | DHALAI | TRIPURA | 799289 | ₹3.1 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹3.2 LRejected-Finance VILL P O BALIGAON KAMALPUR DHALAI TRIPURA PIN NO 799278 | DHALAI | TRIPURA | 799278 | ₹3.2 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹3.2 LRejected-Finance | ₹3.2 L | L5 | Rejected-Finance Being L5 |
Tender Value
₹5.4 L
EMD Value
₹10,797
Closing Date
31 Jan 2026, 3:00 pmClosed
Executive Engineer, PWD (WR D-V), Kamalpur
Executive Engineer, PWD (WR D-V), Kamalpur
FDR Restoration of Brick Line Cannel at Harinmara F III LI scheme under WR subdivision Ambassa SH Renovation of BLC at Harinmara F III LI scheme at Purba Nalicherra GP during the year 2025 26.
2026_CEWR_69335_1
32/EE/WR/D-V/KMP/2025-26
Open Tender
Civil Works - Water Works
30 days
Ambassa
Please refer to the tender documents
4 documents required · 4 mandatory
₹1,000
₹10,797
Yes
17 Mar 2026
17 Jan 2026
31 Jan 2026
17 Jan 2026
31 Jan 2026
17 Jan 2026
Earth work in excavation in foundation, trenches or drain(not exceeding 1.50 m in width or 10 sqm on plan ) including dressing of sides and ramming of bottom lift up to 1.50 mtr including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 mtr. a) All kind of soil. By manual means
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
First class brick work in foundations and plinth including cost of all materials as required complete:- In cement mortar 1:6 ( 1 cement : 6 fine sand ).
Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc. complete as per direction of the Engineer- in-charge.
Demolishing cement concrete manually / by mechanical means including disposal of material with all lifts and upto 50m lead etc . complete as per direction of the Engineer-in-charge:- Nominal concrete 1 :3:6 or richer mix (i/ c equivalent design mix)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: i)1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
Providing and laying cement concrete 1:2:4 (1 cement : 2fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips etc .complete. i) 25 mm thick with 12.5 mm well burnt brick aggregate.
12 mm cement plaster of mix. Cement mortar 1:6 (1 cement : 6 fine sand)
Neat cement punning.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_70552.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
DNIT.pdf
Tender Documents • 2.30 MB
BOQ_70552.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid