| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹1,465.47 (0.37%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.0 L+₹2,116.98 (0.54%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | VIJAYAKUMAR V K L3 | AZHAR C I L1 | Joby Abraham L2 |
|---|---|---|---|---|---|---|
| 1.00Annual maintenance | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 195 | sqm | 8.7 ₹1,696.5 | 8.65 ₹1,686.75 | 4 ₹780 Lowest |
| 1.00 | OD11107/2025-2026:RING BUND -Putting up ring bund as per approved shape 1.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 1.5m including labour dismantling the bund after completion of the work etc. complete. | 2 | metre | 1,053.33 ₹2,106.66 | 683.99 ₹1,367.98 | 100 ₹200 Lowest |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 6 | hour | 427.56 ₹2,565.36 | 425.28 ₹2,551.68 | 100 ₹600 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 26.47 | cum | 241.66 ₹6,396.98 | 240.37 ₹6,362.83 Lowest | 250 ₹6,617.75 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.3 | cum | 8,037.85 ₹1,87,241.72 | 7,995.01 ₹1,86,243.76 Lowest | 8,000 ₹1,86,360 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 195 | sqm | 362.22 ₹70,632.9 | 360.29 ₹70,256.55 | 350 ₹68,250 Lowest |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 352.95 | sqm | 322.47 ₹1,13,815.79 | 320.76 ₹1,13,212.24 Lowest | 340 ₹1,20,003 |
| 2.00Sluice pipe rectification - Chemmalappady | ||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 5.4 | cum | 241.66 ₹1,304.96 | 240.37 ₹1,298 Lowest | 250 ₹1,350 |
Tender Value
₹4.2 L
EMD Value
₹10,586
Closing Date
29 Sept 2025, 5:30 pmClosed
Assistant Executive Engineer
PVIP Subdivision No 4 Aluva
Rectification works to prevent leakage of canal lining between Ch. 5.400 km and Ch. 5.467 km of Thamarachalpuram sub branch canal
2025_Irrig_801858_1
25/AEE4/PVIP/2025-26
Open Tender
Civil Works - Canal
Item Rate
180 days
Aluva
7 documents required · 7 mandatory
₹935
Yes
₹10,586
Yes
6 Nov 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
29 Sept 2025
24 Sept 2025
24 Sept 2025 - 29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1331858.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .