Loading…
Loading…
Tender Value
₹41.0 L
EMD Value
₹96,900
Closing Date
29 Aug 2026, 5:00 pm6d left
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Restoration of rain damages on Bhadhaghat Kotla Sohni Devi road km 0/00 to 5/500 SH Repair of Pot Hole road and laying of B.C. km 0/00 to 2/00 Under PDNA Year 2023
2026_PWD_141731_5
5476-81 dt. 20/8/2026
Open Tender
Civil Works
Percentage
60 days
GHUMARWIN
AS PER SBD
12 documents required · 12 mandatory
₹2,000
₹96,900
22 Aug 2026
22 Aug 2026
30 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
22 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying bituminous macadam for correction layer and pot hole with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto all lead laid over a previously prepared surface and alignment and rolled to achieve the desired compaction as per Technical Specification MORD 2014 Clause 504 with an average output of 75 tonnes (seventy five tonnes) per hour using crushed aggregates of specified grading, premixed with bituminous binder @ minimum 3.3 (three Point Three) per cent VG-30 (Viscosity grade thirty) of mix and filler, transporting the hot mix to work site, laying the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per IRC-29-1988 complete in all respects as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 86.65 | Per Cubic metre | 9,406.78 | ₹8,15,097.49 |
| 2 | Providing and applying tack coat with bitumen emulsion(RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg (Zero point two five to zero point three zero kilogram) per Square metre as per table 500.2 of MORD technical specification 2014, on the prepared bitumenious surface cleaned with hydraulic broom as per technical specification clause 503. of MORD technical specification 2014, as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 7,012.8 | Per square metre | 25.42 | ₹1,78,265.38 |
| 3 | Providing and laying 30 mm (thirty millimetre) thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes (seventy five tonnes) per hour using crushed aggregates of specified grading, premixed with bituminous binder @ minimum 5.4 to 5.6 (five point four to five point six) per cent VG-30 (Viscosity grade thirty) of mix and filler, transporting the hot mix to work site to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per IRC-29-1988 complete in all respects as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 207.89 | Per Cubic metre | 14,957.63 | ₹31,09,541.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
sbd5.pdf
Tender Documents • 6.18 MB
BOQ_210404.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].