Tender Value
₹10.3 L
EMD Value
₹10,345
Closing Date
9 Sept 2026, 6:00 pm
Executive Engineer Public Health Works Division GWSSB Lunawada
Removal of Existing 508 mm Dia MS pipeline Dahyapur Chockdi To 66 kv Getco Main Gate. Santrampur, TA-SANTRAMPUR DIST-MAHISAGAR
338122
Year-2026-27
Open
Civil Works - Water Works
Works
Mahisagar
3 documents required · 3 mandatory
₹900
Executive Enginer, Public Health Works Division, GWSSB, Lunawada, Mahisagar
₹10,345
23 Aug 2026
23 Aug 2026
23 Aug 2026
9 Sept 2026
23 Aug 2026
Sr No Description Unit Quantity SOR Rate Amount
Removal of Existing Pipeline - Kadana to sangari
Excavation forPipeline trenches
Excavation for pipe line trenches for water supply, sewerage line,
manhole etc. all with shoring and struting if required as per
required gradient and line including safety provisions using site
rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
1 Up to 1.5m depth
508 mm dia MS Pipe Thickness 6.00 mm
GWSSB SOR 2022-23, Part-1&2B Labour sec, Pg.no.32, It.No.
1A1m And Tribal Area 5% Add
In Soft soil and soft murrum (75 %) CUM 2175.00 93.45
In Hard Rock and CC 1:2:4 or RCC With Blasting, Breaking,
Chiseling or by chiseling/breaking only(25 %)
Removing of Existing Pipeline
Removing of existing pipeline incl. removal of specials, valves
jointing material including carting and stacking of removed material
2 from site of work to the department store as directed excl.
excavation and refilling
D.I/ C. I. S.& S. Spun Pipes suitable fortyton joints.
GWSSB SOR 2022-23, Part-1G(M&R), Pg.no.81, It.No. 15a, And
Tribal Area 5% Add
508 mm dia MS Pipe Thickness 6.00 mm RMT 2900.00 139.65
Refilling the pipe line trenches
Refilling the pipe line trenches incl. Ramming 'watering
consolidating disposel of surplus stuff as 'directed within a radius
Less for Volume of Pipe
GWSSB SOR 2022-23, SEC B, Pg.no.40, It.No.14, And Tribal
508 mm dia MS Pipe Thickness 6.00 mm CUM 2312.52 23.10
Carrige of material over distance exceeding 0.5 Km. .Including
loading,unloading and stacking (for all material other than
4 asphalt,cement & steel ) (ZALAPADEDI STORE )
As Per Calculation Sheet Rate Analysis And Tribal Area 5%
GWSSB SOR 2022-23, SEC- 2E,B- Pg.no.107, SR.NO.16,
Deputy Ex.Engineer,
P.H.Sanitary Sub Division(GWSSB),
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Technical Bid.pdf
Dahyapur-Schedule-B.pdf
Specification pipeline dahyapur.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].