| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 LAccepted-AOC | ₹32.8 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹33.4 L+₹63,276.66 (1.93%)Rejected-Finance | ₹33.4 L+₹63,276.66 (1.93%) | L2 | Rejected-Finance 2 Lowest |
| 3 | L3₹34.7 L+₹1.9 L (5.93%)Rejected-Finance | ₹34.7 L+₹1.9 L (5.93%) | L3 | Rejected-Finance 3 Lowest |
| 4 | L4₹35.1 L+₹2.3 L (7.12%)Rejected-Finance | ₹35.1 L+₹2.3 L (7.12%) | L4 | Rejected-Finance 4 Lowest |
| 5 | L5₹35.3 L+₹2.5 L (7.68%)Rejected-Finance | ₹35.3 L+₹2.5 L (7.68%) | L5 | Rejected-Finance 5 Lowest |
| Sl No | Description | Qty | Unit | SHYJU N L5 | J SHAJI L4 | J Raju L2 | ANEESH S V L3 | RAHUL RAJENDRAN L1 | SURESH KUMAR P L7 | BALUKRISHNA L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Premonsoon Works | ||||||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.78 | Hectare | 45,277.38 ₹35,497.47 | 45,039.53 ₹35,310.99 | 42,858.39 ₹33,600.98 | 40,000 ₹31,360 Lowest | 42,053.76 ₹32,970.15 | 48,000 ₹37,632 | 45,494.98 ₹35,668.06 |
| 1.00 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 50 | sqm | 28.08 ₹1,404 | 27.94 ₹1,397 | 26.58 ₹1,329 | 31 ₹1,550 | 26.09 ₹1,304.5 | 25 ₹1,250 Lowest | 28.22 ₹1,411 |
| 1.00 | OD303027/2024-2025:Tipper for removal of all debris and excavated waste materials away from site | 15 | Day | 2,717.53 ₹40,762.95 | 2,703.26 ₹40,548.9 | 2,572.34 ₹38,585.1 | 3,037 ₹45,555 | 2,524.05 ₹37,860.75 Lowest | 2,900 ₹43,500 | 2,730.6 ₹40,959 |
| 1.00 | OD303022/2024-2025:Engaging wood cutters of trees and removal of fell down trees and branches etc complete | 20 | Day | 986.31 ₹19,726.2 | 981.13 ₹19,622.6 | 933.61 ₹18,672.2 | 1,102 ₹22,040 | 916.09 ₹18,321.8 Lowest | 1,000 ₹20,000 | 991.05 ₹19,821 |
| 1.00 | OD303023/2024-2025:Hire charges for wood cutting equipment | 20 | Day | 1,082.59 ₹21,651.8 | 1,076.9 ₹21,538 | 1,024.74 ₹20,494.8 | 1,210 ₹24,200 | 1,005.51 ₹20,110.2 Lowest | 1,100 ₹22,000 | 1,087.79 ₹21,755.8 |
| 1.01 | OD303024/2024-2025:Clearing chocked up drain by manual means and transporting the debris to safe distance | 607.5 | cum | 431.93 ₹2,62,397.48 | 429.67 ₹2,61,024.53 | 408.85 ₹2,48,376.38 | 375 ₹2,27,812.5 Lowest | 401.18 ₹2,43,716.85 | 450 ₹2,73,375 | 434.01 ₹2,63,661.08 |
| 1.01 | OD303025/2024-2025:Engaging Man Mazdoor | 64 | each | 1,031.06 ₹65,987.84 | 1,025.64 ₹65,640.96 | 975.97 ₹62,462.08 | 1,152 ₹73,728 | 957.65 ₹61,289.6 Lowest | 1,000 ₹64,000 | 1,036.02 ₹66,305.28 |
| 1.01 | OD303026/2024-2025:Lifting and replacing old slabs over existing drain for cleaning the drain | 50 | cum | 2,574.95 ₹1,28,747.5 | 2,561.42 ₹1,28,071 | 2,437.37 ₹1,21,868.5 | 2,200 ₹1,10,000 Lowest | 2,386.63 ₹1,19,331.5 | 2,500 ₹1,25,000 | 2,587.32 ₹1,29,366 |
| 1.01 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 22 | cum | 5,076.38 ₹1,11,680.36 | 5,049.71 ₹1,11,093.62 | 4,805.16 ₹1,05,713.52 | 4,500 ₹99,000 Lowest | 4,714.95 ₹1,03,728.9 | 5,167 ₹1,13,674 | 5,100.77 ₹1,12,216.94 |
Tender Value
₹39.5 L
EMD Value
₹50,000
Closing Date
12 Aug 2025, 2:00 pmClosed
Executive Engineer
WD Roads Division Thiruvananthapuram
GENERAL RM 2025 26 RC-2 Phase 1 Cluster 2 One year Running Contract in PWD Roads under Malayinkeezhu Section Malayinkeezhu Pappanamcode Road Malayinkeezhu Ooruttambalam Road Santhanmoola Machel Road 18 Km RCGeneral Civil Work
2025_PWD_782028_1
PWD/RB/TR/5825/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
360 days
TVPM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
10 Oct 2025
2 Aug 2025
14 Aug 2025
2 Aug 2025
12 Aug 2025
2 Aug 2025
Amount
Premonsoon Works
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD303027/2024-2025:Tipper for removal of all debris and excavated waste materials away from site
OD303022/2024-2025:Engaging wood cutters of trees and removal of fell down trees and branches etc complete
OD303023/2024-2025:Hire charges for wood cutting equipment
OD303024/2024-2025:Clearing chocked up drain by manual means and transporting the debris to safe distance
OD303025/2024-2025:Engaging Man Mazdoor
OD303026/2024-2025:Lifting and replacing old slabs over existing drain for cleaning the drain
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD303121/2024-2025:Providing and fixing of DLP board for running contract work with non- retro-reflectorised sign with 1 year warranty manufactured by vinyl printed sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
Preventive Maintenance works
12.1.A.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3 m - Manual Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD303020/2024-2025:Supplying and filling up pot holes with Bitumen ready mix compound (bag of 25 kg )and compaction by ramming to get a compact surface including cost of materials , laying charges , trasportation to site etc complete (rate is arrived for a bag of 25 kg )
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD303019/2024-2025:Supplying RS emulsion at site
OD303021/2024-2025:MoRD Data-5.11.1.A.2a. Mix Seal Surfacing - Manual Means - Type A - Bitumen VG-30 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (VG-30)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
OD431/2025-2026:Dry Rubble for Side protection works such as retaining wall
Emergency Work
OD303028/2024-2025:Hire Charges of Mobile Crane
OD101460/2025-2026:Engaging JCB (Hydraulic Excavator) for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriageway and clearing the road surface for traffic worthy etc complete
J Raju (BID ID -2283953)
ANEESH S V (BID ID -2284602)
J SHAJI (BID ID -2281972)
SHYJU N (BID ID -2281763)
BALUKRISHNA (BID ID -2284706)
SURESH KUMAR P (BID ID -2278683)
Bidder Name
J Raju
J SHAJI
SURESH KUMAR P
BALUKRISHNA
ANEESH S V
SHYJU N
RAHUL RAJENDRAN
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1282719.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .