| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹167.0 CrAccepted-AOC B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW UTTAR PRADESH 226010 | LUCKNOW | UTTAR PRADESH | 226010 | ₹167.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹183.6 CrRejected-AOC | ₹183.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹197.5 CrRejected-AOC | ₹197.5 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹213.4 CrRejected-AOC | ₹213.4 Cr | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 825 GANDHI CHOWK RANIKHET ALMORA | - | - | Rejected-Technical Technically Disqualified |
Tender Value
₹132.8 Cr
EMD Value
₹3.8 Cr
Closing Date
25 Oct 2021, 12:00 pmClosed
Chief Engineer (Ganga)
Chief Engineer (Ganga) Uttarakhand PeyJal Nigam, 11, Mohini, Dehradun
Interception and Diversion works of 6 Nos Polluted Stretches To Rejuvenate River Bhela, Dhela Kichha Kosi Nandhor and Pilakhar of district Udham Singh Nagar Uttarakhand India up to prescribed time and date as per terms and conditions under Nam
2021_MDPEY_36912_1
262/ Mu Aa Go- Karya Ganga/27 Dated 16.09.2021
Open Tender
Composite Works
730 days
Udham Singh Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Chief Engineer (Ganga) Uttarakhand PeyJal Nigam
₹3.8 Cr
Dehradun
24 Jul 2025
27 Sept 2021
26 Oct 2021
27 Sept 2021
25 Oct 2021
6 Oct 2021
1 Oct 2021
Amount
Price Schedule : Part A Design, Build, Operate, Transfer work for INTERCEPTION & DIVERSION WORK and STP including all allide works .
Design, development, built, tested and commissioned including supply of equipment, erection of equipment, civil, electro mechanical and instrumentation control works, including testing, commissioning of STPs to treat the sewage & septage upto the standard mentioned in bid document and comprehensive sludge management & handling facility. Break-up of works of item No. 1.01 as follows :-
PROCESS DESIGN ENGINEERING AND DRAWINGS :- Process & Instrumentation Diagrams, Flow Charts, Hydraulic Diagram and Complete Process Design, Site Layout Plan and Site Grading Plan, Single line Diagrams, Control Philosophy & Basic Electrical and Instrumentation Drawings, Preparation of “QA” and construction procedure manual along with “Test Plan”, Civil and Mechanical General Arrangement Drawings, Architectural Drawings, Structural Designs and Drawings and Construction Drawings, Mechanical and Piping data sheets and Drawings, Detailed Electrical and Instrumentation and control Systems, Drawings and datasheets including PLC and SCADA, Ancillary Works and Non-Technology Structural Drawings including roads and drainage and compound wall bypass + treated effluent disposal arrangement like pipe line etc. RCC drain, external electrification plans, As-Built Drawings, Operation and Maintenance Manuals and Training Program and Manuals, etc. complete (To be submitted in 6 Nos. sets).
Construction of I&D and STPs Includes all works such as Site Development & Infrastructure Works including site Cleaning / Grading / Levelling and Reclamation Compound Wall with Gates as shown in Drawings, Roads along boundary all as shown in site plan, bypass + treated effluent pipe as shown in site plan, Internal Roads & Pathways, Internal Sewerage Network and Internal Storm Water Drains, Landscaping and Gardening, Piping & Valves, all Liquid Retaining Structures (Such as receiving chamber coarse and fine screen channels, grit chambers) and other liquid retaining as required in treatment technology proposed by bidder and as specified in bid document). It also includes others various Buildings / Sheds such as administration cum MCC and Control Building, building for E&M equipment as per norms / practice and sample testing laboratory complete with equipments etc. disposal of bypass sewage to drain & disposal of treated effluent to drain/ river as per bid document, piping between different units of STP complete. Break-up of works of item above item as follows :-
01 MLD STP at Jaspurkhurd, Kashipur based on Open Technology with additional cotreatment facility @ 2% septage load of STP capacitya and I&D works of Jaspurkhurd nala
02 MLD STP at Hempur Ismail Kashipur based on Open Technologywith additional cotreatment facility @ 2% of STP capacity and I&D works Hempur ismail nala1 and Hempur ismail nala2
10 MLD STP at Kashipur based on Open Technologywith additional cotreatment facility @ 2% septage load of STP capacity and advanced sludge management plant(feed capacity 5tons/perday@20-22% solid consistency) and I&D works of Beljudi nala,Gularia Nala1 and gularia nala2 and online monitoring system with OCEMS.
500 KLD STP at Beljudi Village based on Johkasou Technologyand I&D works of Gabiya nala
300 KLD STP at Gularia Village based on Johkasou Technologyand I&D works of icefactory nala
3 MLD STP at Kiccha based on Open Technologywith additional cotreatment facility @ 2% septage load of STP capacity and I&D works of Drains 6no.1(Bedi mohalla ward no. 6), Maharana pratap chowk se khatima ki or jane wala nala-1,Maharana pratap chowk se khatima ki or jane wala nala-2,near Bankhadi Mandir(purani mandir wala nala-1)ward no.17,near Bankhadi Mandir(purani mandir wala nala-1)ward no.17,Shivnagar mandi wala nala(ward no.17)
500 KLD STP at Mukundpur Village based on Johkasou Technologyand I&D works of Mukundpur nala.
3 MLD STP at Sitargang based on Open Technology with additional cotreatment facility @ 2% of STP capacity and I&D works of Ukrouli drain
10 MLD STP at Ghoga Nala, Bazpur based on Open Technology with additional cotreatment facility @ 2% septage load of STP capacity and advanced sludge management plant(feed capacity 5tons/ perday @ 20-22% solid consistency) and I&D works of Ghoga nala and online monitoring system with OCEMS.
Price Schedule PART B :-Annual O & M Prices of I&D and STPs excluding Electricity and Fuel charges (The cost included herein are the yearly cost for plant Operation & maintenance including fixed cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Electrical items, Field & Laboratory Instruments, Supply of Laboratory Chemicals / Glassware / Consumable / Spares etc.) and Variable Cost (Including cost of Chemicals & Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc) Break-up of works of item No. 1.02 as follows :-
01 MLD STP at Jaspurkhurd, Kashipur based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
02 MLD STP at Hempur Ismail Kashipur based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
10 MLD STP at Kashipur based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
500 KLD STP at Beljudi Village based on Johkasou Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
300 KLD STP at Gularia Village based on Johkasou Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
3 MLD STP at Kiccha based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
500 KLD STP at Mukundpur Village based on Johkasou Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
3 MLD STP at Sitargang based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
10 MLD STP at Ghoga Nala, Bazpur based on Open Technology
For 1st year of operation
For 2nd year of operation
For 3rd year of operation
For 4th year of operation
For 5th year of operation
For 6th year of operation
For 7th year of operation
For 8th year of operation
For 9th year of operation
For 10th year of operation
For 11th year of operation
For 12th year of operation
Fo13th year of operation
For 14th year of operation
For 15th year of operation
Aquatech Solutions Pvt. Ltd.
Khilari Infrastructure Private Limited
Toshiba Water Solutions Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid