Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.7 L+₹23,188.94 (9.39%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
28 Sept 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
DEVELOPMENT OF CFC CENTER AT KITCHAMA UNDER ADP-DDC 2026-2027, P/H KITCHAMA . BLOCK NARWHA
2026_RDPR_325391_1
232/Xen/Rew/Bla/2026-27 Dated 21/09/2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹6,000
29 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging of labour for cleaning of toilets ,tile work and rooms and other garbage | 20 | No. | 650 | ₹13,000 |
| 2 | P/ fixing of 4mm thick glass of approved brand in window shutters | 45 | sft | 75 | ₹3,375 |
| 3 | Providing /laying of stone soling handpacked in foundation trenches including dressing, watering, compacting and all carriage up to site of work complete job | 1.49 | Cum | 1,250 | ₹1,862.5 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size crushed stone agg.) incluiding head load and dewatering if any | 1.11 | Cum | 5,202.9 | ₹5,775.22 |
| 5 | Providing and fixing Ist quality vetrified floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades 600mm* 600mm | 37.17 | sqm | 1,395 | ₹51,852.15 |
| 6 | P/fixing of grill work using iron hallow sections ,pipes etc incl applying of two or more coats of steel primer | 437.5 | KG | 138 | ₹60,375 |
| 7 | Structural steel work welded in built up sections, trusses and frame work including cutting, hoisting fixing in position and applying a priming coat of approved steel primer all complete in angles / flats / tubes / channels etc. | 955 | KG | 120 | ₹1,14,600 |
| 8 | P/applying of synthetic enamel paint over steel work two or more coats | 92.88 | sqm | 131.85 | ₹12,246.23 |
| 9 | P/applying of cement paint over brick over and plasterd portion paint over steel work two or more coats | 231.9 | sqm | 98.75 | ₹22,900.13 |
| 10 | add provision for ppr fitting,cp,pvc pipes and other allied items to b paid as per actual | 1 | LS | 5,000 | ₹5,000 |
stage.html
html • 0.02 MB
finance_1099270.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_1099270.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .