PR & CC
This tender is being floated for construction of RCC approach road at Mahul LPG plant. Pl refer to Tender
20000012-HD-12350
20000012-HD-12350
Open Tender
Two Bid
Azamgarh, Uttar Pradesh
₹0
₹4 L
19 Oct 2020
24 Sept 2020
19 Oct 2020
19 Oct 2020
25 Sept 2020 - 16 Oct 2020
1 Oct 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — EXCAVATION-UPTO 1.5 MTR DEPTH EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL IN ANY TYPE OF SOIL EXCEPT HARD ROCK. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. | - | Cubic Meters |
| 2 | EXCAVATION OF EARTH | EXCAVATION OF EARTH — EXCAVATION FOR FOUNDATIONS, TRENCHES, DRAINS ETC IN ALL TYPES HARD MURRUM, ASPHALT PAVING, SOFT ROCK INCLUDING SHORING AS REQUIRED AS PER SITE CONDITION, PUMPING OR BAILING OUT WATER, LEVELLING/COMPACTION OF THE EXCAVATED SURFACE ETC COMPLETE. HARD ROCK WILL BE CLASSIFIED AS WHICH REQUIRES CHISELLING OR ANY MECHANICAL EQUIPMENTS.DEPTH UPTO 1.5 M | - | Cubic Meters |
| 3 | EXCAVATION F/FOUNDATION | EXCAVATION F/FOUNDATION — EXCAVATION HARD ROCK UPTO1.5M: EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL UP TO 1.5 M. DEPTH IN HARD ROCK BYCHISELLING/PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH OUTSIDE HPCL PREMDISES TO AN UNOBJECTIONABLE PLACE AS PER LOCAL BODY/MC NORMS, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE. THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTH. | - | Cubic Meters |
| 4 | SPLY AND LAYG OF MACADAM 12539-Mahul LPG Terminal | SPLY AND LAYG OF MACADAM 12539-Mahul LPG Terminal — CONSTRUCTION OF WET MIX MACADAM BY PROVIDING, LAYING, SPREADING AND COMPACTING OF GRADED STONE AGGREGATES IN LAYERS (USING 53 MM DOWN AGGREGATE AS PER SPECIFICATION) MIXED WITH 2% OF ORDINARY PORTLAND CEMENT BY WEIGHT OF AGGREGATE, MIXING IN A MECHANICAL WET MIX PLANT AT OMC, CARRIAGE OF MIXED MATERIAL TO WORK SITE IN TIPPER AND CONVEYING TO PAVER, LAID OVER A PREVIOUSLY PREPARED SURFACE WITH MECHANICAL PAVER FINISHED TO THE REQUIRED GRADE, LEVEL AND ALIGNMENT, COMPACTING WITH VIBRATORY ROLLER 8-10 TONNE TO ACHIEVE THE DESIRED DENSITY OF 98% INCLUDING PROTECTION OF EDGES OF WMM LAYER, COST OF ALL MATERIALS, LABOUR, HIRE CHARGES OF MACHINERY, LIGHTING, MAINTENANCE OF DIVERSION ROAD IF ANY, OBTAINING APPROVAL FROM MINING DEPARTMENT/APPLICABLE DEPARTMENTS BY SEIGNIORAGE, LOADING AND UNLOADING, ALL LEAD AND LIFT ETC., COMPLETE. JOB TO BE DONE AS PER MORTH SPECIFICATION NO. 406 (4TH REVISION).THE CONSOLIDATED THICKNESS SHALL BE 100-125 MM. | - | Cubic Meters |
| 5 | SPLY AND LAYG OF RUBBLE | SPLY AND LAYG OF RUBBLE — Providing and laying dry trap rubble stone soling 230 mm thick including hand packing, filling the interstices with chips, spalls and binding with grit and selected murrum, watering, compacting complete. | - | Cubic Meters |
| 6 | SPLY AND LAYG OF PCC | SPLY AND LAYG OF PCC — SUPPLY AND LAYING OF PLAIN CEMENT CONCRETE HAS TO BE DONE AS PER THE RATIO OF 1 (CEMENT): 3 (FINE AGGREGATE): 6 (COARSE AGGREGATE) RATIO. THE CEMENT TO BE USED IS APPROVED MAKE CEMENT ONLY. | - | Cubic Meters |
| 7 | SPLY AND LAYG OF RCC | SPLY AND LAYG OF RCC — RCC M25: PROVIDING AND LAYING REINFORCED CEMENT CONCRETE WITH M-25 GRADE DESIGN MIX AS PER IS456-2000 FOR FOOTINGS, COLUMNS, WALLS, KERBS, FLOORS, PEDESTALS, PUMP FOUNDATION ETC. AND AS DIRECTED BY EIC AT ALL HEIGHTS AND DEPTHS USING 20 MM AND DOWN SIZE GRADED CRUSHED AGGREGATE INCLUDING SUPPLY AND FIXING SHUTTERING FOR FORM WORK WITH APPROVED QUALITY SUPPORTS, SCAFFOLDING, MAKING PROVISION FOR POCKETS, FIXING OF INSERT PLATE, MACHINE MIXING, COMPACTING BY MECHANICAL VIBRATORS, CURING, ETC. COMPLETE AS PER ATTACHED TECHNICAL SPECIFICATION AND AS PER DIRECTION OF ENGINEER IN CHARGE. CONCRETE INGREDIENTS SHALL CONFORM TO IS 456- 2000. THE CEMENT CONTENT SHALL BE GOVERNED BY DESIGN MIX BUT MINIMUM CEMENT CONTENT SHALL BE 400KG/M3.SHUTTERING TO BE USED FOR RCC: PROVIDING, FIXING AND STRIPPING OF SHUTTERING OF GOOD QUALITY MARINE PLYWOOD OR STEEL PLATE ON STEEL FRAME FOR ALL TYPES OF STRUCTURES, ANCHOR POCKETS ETC. AT ALL DEPTHS AND HEIGHTS NOT COVERED IN RESPECTIVE ITEMS INCLUDING CENTERING / SCAFFOLDING, ALL COMPLETE AS PER DRAWINGS, SPECIFICATIONS AND DIRECTIONS OF THE ENGINEER SO AS TO OBTAIN A SMOOTH SURFACE OF CONCRETE FREE FROM HONEYCOMBING.RATE SHALL BE EXCLUSIVE OF THE COST OF STEEL REINFORCEMENT WHICH WILL BE PAID UNDER A SEPARATE ITEM. CONCRETE SHALL CONFORM TO IS 456 TO BE USED SHALL BE EITHER READY MIX CONCRETE OR WITH WEIGH BATCHER. THE SCOPE OF MIX DESIGN IS INCLUDED IN THE SCOPE OF BIDDER AND THE SAME TO BE VETTED BY REPUTED ENGINEERING INSTITUTE APPROVED BY HPCL. CEMENT SHALL BE PPC CONFORM TO IS: 1489 (LATEST EDITION) OR OPC CONFIRMING TO IS: 8112 LATEST EDITION (43/53 GRADE) AND MAKE SHALL BE AS PER VENDOR LIST. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION/CODAL PROVISIONS/ SOUND ENGINEERING PRACTICES AND AS DIRECTED BY EIC. | - | Cubic Meters |
| 8 | M25 RCC | M25 RCC — PROVIDING, MIXING AND PLACING IN POSITION R.C.C OF DESIGN MIX M-25 AS PER SPECIFICATIONS AND DRAWINGS WITH 20 MM DOWN GRADED COARSE AGGREGATES FOR RCC ROADS, PATHWAYS ETC. INCLUDING PROVIDING ISMC SHUTTERING, VIBRATING ( WITH SCREED VIBRATOR), REMOVING THE EXCESS WATER & FINISHING THE SURFACE WITH VACUUM DEWATERING MACHINE (TRIMIX CONCRETING METHOD), CURING COMPLETE AS PER TECHNICAL SPECIFICATIONS MENTIONED IN THE TENDER AND AS DIRECTED BY THE SITE-IN-CHARGE. (REINFORCEMENT WILL BE PAID SEPARATELY). | - | Cubic Meters |
| 9 | PROV TMT REINFORCEMENT | PROV TMT REINFORCEMENT — PROVIDING, TRANSPORTING, STACKING, STRAIGHTENING CLEANING, CUTTING, BENDING, PLACING & TYING IN POSITION TMT REINFORCEMENT BARS CONFORMING TO IS:1786, FE 500 FOR HEIGHT UP TO 4.0 M ABOVE FINISHED GROUND LEVEL AND DEPTH UP TO 1.0 M BELOW FINISH GROUND LEVEL INCLUDING LAPS, COVERS, CHAIRS, PROVIDING & TYING USING SOFT 16 GAUGE ANNEALED BINDING WIRE, ETC., COMPLETE AS PER DRAWINGS, SPECIFICATIONS & AS DIRECTED BY EIC. | - | Metric Ton |
| 10 | SPLY AND FIXG OF | SPLY AND FIXG OF — SUPPLY AND FIXING OF DOWEL/TIE ROD FOR JOINTS:DOWEL/TIE BARS ARE SHORT STEEL BARS THAT PROVIDE A MECHANICAL CONNECTION BETWEEN SLABS WITHOUT RESTRICTING HORIZONTAL JOINT MOVEMENT. THEY INCREASE LOAD TRANSFER EFFICIENCY BY ALLOWING THE LEAVE SLAB TO ASSUME SOME OF THE LOAD BEFORE THE LOAD IS ACTUALLY OVER IT. THIS REDUCES JOINT DEFLECTION AND STRESS IN THE APPROACH AND LEAVE SLABS. SUPPLY AND FIXING OF DOWEL/TIE BARS WITH SPECIAL ARRANGEMENTS INCLUDING EPOXY COATING TO FIX IN CONCRETE PAVEMENT AS PER MANUFACTURES INSTRUCTION, WORKS INCLUDING TOOLS, TACKLES, MANPOWER, MACHINERY ETC. SHALL BE COMPLETED AS PER DIRECTION OF ENGINEER-IN-CHARGE. DOWEL AND TIE BARS SHALL BE CONFIRMING WITH AS PER IRC-58-2000. SPACING AND SIZE OF ROD ALSO TO BE CONFIRMING WITH IRC58-2000. | - | Metric Ton |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000012-HD-12350.pdf
TENDER_DOCUMENT • 9.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .