| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.4 L+₹7,873.32 (0.95%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.5 L+₹1.2 L (14.5%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹9.7 L+₹1.4 L (16.6%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | Rejected-Technical 173 SHAMLI SHIV VIHAR RAIL PAR SHAMLI UTTAR PRADESH 247776 | SHAMLI | UTTAR PRADESH | 247776 | - | Rejected-Technical Techno-Commercially Disqualified |
Tender Value
Refer Docs
EMD Value
₹8,750
Closing Date
26 Sept 2020, 5:30 pmClosed
AGM
THDCIL, VPHEP, Alaknandapuram, Siyasain, Pipalkoti, Chamoli, Uttarakhand
Fencing work in periphery of acquired land (Naap and Civil Van Bhoomi) by THDCIL at Haat Village
2020_THDC_579299_1
THDCIL/VPHEP/PKOTI/20-21/4
Open Tender
Civil Works
Works
180 days
Pipalkoti
As per NIT
11 documents required · 11 mandatory
₹590
Yes
THDC India Limited
₹8,750
Yes
26 Nov 2020
26 Aug 2020
30 Sept 2020
26 Aug 2020
26 Sept 2020
26 Aug 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level ,1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level , Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
M/S Shailendra Kumar
Upendra Kumar Pant
M/s darwan Singh Bhandari
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .