₹16.6 L
EMD Value
₹17,000
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer, Navsari (R&B) Division, Navsari
Repairing / Renovation Work for Government Arts and Commerce College at Khergam, Ta.Khergam, Di.Navsari (Providing Drainage Line, Repairs to Compound Wall etc.)
288263
37 of 2025-26
Open
Civil Works - Buildings
Works
Navsari
9 documents required · 9 mandatory
₹900
Yes
Executive Engineer, Navsari (R&B) Division, Navsari
₹17,000
Yes
20 Mar 2026
20 Mar 2026
20 Mar 2026
6 Apr 2026
20 Mar 2026
Repairing/Renovation Work for Government Arts and Commerce College at Khergam,
Ta. Khergam, Di. Navsari (Providing Drainage Line, Repairs to Compound Wall etc.)
BILL OF QUANTITIES
Percentage Rate Tender
Item Description of Item Quantity Unit Rate In Amount
1 Excavation for foundation upto 1.5 m depth including 24.30 Cum. 120.01
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil
2 Providing and laying controlled cement concrete 24.30 Cum. 3927.44
M.150 for curing complete excluding cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings,Base of columns
and Mass concrete For PCC
3 Providing laying (to level or slopes) and jointing 135.00 Rmt 2212.21
reinforced concrete Light duty non-pressure pipes
I.S. class NP2 of the following internal diameter with
collars and butt ends prepared for collar joints
including testing of joints complete.(H)
4 Constructing brick masonry chamber for 13.00 No. 9356.64
underground C.I. Inspection chamber and bends with
bricks having crushing strength not less than 35Kg.
Cm2 in C.M. 1:5 precast RCC cover 600mm x 850mm
intenal dimensions with frame (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand :4-graded stone
aggregate 20mm size) foundation concrete 1:5:10
inside plaster 15mm thick with cement mortar 1:3
finished smooth with a floating coat of neat cement
on walls and bed concrete etc. complete (i) Inside
dimensions 600mmx 850mm and 1050mm deep for
pipe lines with three or more inlets.
5 Filling available excavated earth (excluding rock) 1442.00 Cum. 133.65
intrenches. plinth, sides of foundations etc. in layers
not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
6 Providing and fixing pre-cast Rubber Dye inter 138.00 Sqm 704.07
locking concrete block 60mm thick with grade of
concrete M30 pnumatic compressed by mechanically
pressed and as per approved design confirming to IS
15658: 2006 including 35mm Sand layer for levelling
and filling the joint with sand in proper line and level
as per guidelines of IRC SP 63-2018 etc complete.
7 20 mm Thick sand faced Gutka cement plaster on 922.74 Sqm 339.15
walls upto all height consisting of 12 mm Thick
backing coat of c.m. 1:3 (1 cement : 3 sand) and 8 mm
Thick finishing coat of c.m. 1:1 (1 cement : 1 sand)
etc. with required 1x1cm grooved including
scaffolding curing etc. complete.
Item Description of Item Quantity Unit Rate In Amount
8 Finishing wall with weather proof exterior 100% 4613.70 Sqm 117.40
acrylic emulsion water repellant paint including
primer on wall surface (two coats) to give an
required shape even shade after thoroughly brushing
the surface to remove all dirt, and remains of loose
powdered materials.etc complete as per directed
engineer incharge.
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our
Tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
1 Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
4 items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the
Deputy Executive Engineer Executive Engineer
Chikhli ( R & B ) Sub Division Navsari ( R & B ) Division
Chikhli Navsari
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD - Rep. Reno. Arts Comm. College Khergam.pdf
1.1 GR.pdf
2. BOQ - Rep. Reno. Arts Comm. College Khergam.pdf
3. Specification - Rep. Reno. Arts Comm. College Khergam.pdf
4. Building-Specification Booklet.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .