Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.1 CrAdmitted-Finance GH9 135 PASCHIM VIHAR NEW DELHI 110087 | NEW DELHI | NEW DELHI | DELHI | 110087 | L1 | Admitted-Finance | ||
| 2 | L2₹13.2 Cr+₹1.2 Cr (9.84%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.3 Cr+₹1.2 Cr (10.3%)Admitted-Finance 101 DDA MARKET PHASE III PKT B ASHOK VIHAR CHITTOOR 110052 | NORTH | DELHI | 110052 | L3 | Admitted-Finance | ||
| 4 | L4₹14.0 Cr+₹2.0 Cr (16.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹14.1 Cr+₹2.0 Cr (16.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹19.6 Cr
Closing Date
26 Jul 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer North Roads PWD
Opp. Khalsa College, Mall Road, Delhi -110054
Construction of RCC Drain from Village Palla to Hiranki Check Post via Village Bakhtawar Pur under PWD North Roads, Delhi
2021_PWD_205481_1
12/EE/NR/PWD/21-22/Delhi
Open Tender
Civil Works - Roads
Percentage
300 days
North Delhi
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
28 Jul 2021
7 Jul 2021
26 Jul 2021
7 Jul 2021
26 Jul 2021
14 Jul 2021
30 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kind of Soil | 43,817 | cum | 125.95 | ₹55,18,751.15 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
All kinds of soil | 19,241 | cum | 51.75 | ₹9,95,721.75 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 15,221 | cum | 125.75 | ₹19,14,040.75 |
| 4 | Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.
Note : (1) Excess/less cement used than specified in this item is payable/ recoverable separately.
(2) Fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS : 456. Uniform blending with cement is to be ensured in accordance with clauses 5.2 and 5.2.1 of IS: 456 -2000 in the items of BMC and RMC.
M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) | 1,980 | cum | 5,695.25 | ₹1,12,76,595 |
| 5 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads & lift, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. All works upto plinth level. Note:- Cement content considered in this item is minimum @330 kg/cum. Nothing extra shall be payable on account of design mix specified more than @ 330 kg/cum | 10,112 | cum | 6,481.3 | ₹6,55,38,905.6 |
| 6Centering and shuttering including strutting, proping etc. and removal of form for: foundation, footings, base of columns etc. and mass concrete | |||||
| 6.01 | Foundations, footings, bases of columns, etc. for mass concrete | 3,020 | sqm | 193.95 | ₹5,85,729 |
| 6.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 63,120 | sqm | 378.6 | ₹2,38,97,232 |
| 6.03 | Suspended floors, roofs, landings, balconies and access platform. | 902 | sqm | 422.3 | ₹3,80,914.6 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 11,84,456 | kg | 56.6 | ₹6,70,40,209.6 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_261614.xls
BOQ • 0.30 MB
NITRCCDrainVillagePallatoHiranki.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .