Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC | L1 | Accepted-AOC Acceptance of Contract | |
| 2 | L2₹31.0 L+₹60,310 (1.99%)Rejected-AOC | L2 | Rejected-AOC OK | |
| 3 | L3₹34.0 L+₹3.6 L (11.9%)Rejected-AOC 00 KAMALWAGANJA ROAD NEAR HANUMAN MANDIR HARINAGAR SHIV PURAM PHASE 1 HALDWANI NAINITAL UTTARAKHAND 263139 | NAINITAL | UTTARAKHAND | 263139 | L3 | Rejected-AOC OK | |
| 4 | L4₹34.5 L+₹4.1 L (13.6%)Rejected-AOC 5 DARSHANI GATE DEHRADUN PIN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L4 | Rejected-AOC OK | |
| 5 | L5₹37.3 L+₹6.9 L (22.8%)Rejected-AOC SHOP NO 5 OPP SHANI MANDIR PROFESSOR COLONY DISTT YAMUNA NAGAR HARYANA 135001 | YAMUNANAGAR | HARYANA | 135001 | L5 | Rejected-AOC OK |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
20 Jun 2024, 6:00 pmClosed
GE IMA Dehradun
GE IMA Dehradun
REPAIR AND MAINT OF SUMMER COOLING APPLIANCES INCLUDING WATER PURIFIER AND OTHER CONNECTED WORKS UNDER GE IMA DEHRADUN
2024_MES_654351_1
GE/IMA/T-39 of 2024-2025 9428/E8
Open Tender
Support/Maintenance Service
Item Rate
270 days
GE IMA Dehradun
Refer NIT
6 documents required · 6 mandatory
₹500
Yes
GE IMA Dehradun
₹80,000
Yes
3 Sept 2024
16 May 2024
22 Jun 2024
17 May 2024
20 Jun 2024
6 Jun 2024
Amount
M&L For Preventive Maintenance (i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of water cooler and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of water cooler of any capacity/Make and replacemnt of damaged /unsv parts of water cooler Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only. Rate for fixing of new items/ Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item. (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The cost for minor items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, etc is included in this item. (iv) GE IMA comprises of 157 water cooler at this point of time of make: Voltas,Bluestar,Sriram Usha, Sidwal of storage capacity 40/60/80/120/150 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (V) The T&P required for repair and replacement of equipments will be provided by the Contractor.
Taking down and Supply only of New Following spare parts mentioned in item No.01 suitable for water cooler of make: Voltas,Bluestar,Sriram Usha, Sidwal of storage capacity 40/60/80/120/150 Ltrs.
Condensor fan Motor along with condenser fan blade. Make:-Make: GE/Crompton/ Coolmaster/Kirloskar/Copeland
Over load protector
Running capacitor 10/25 mfd . Make:- Havells / TIBCON /Epcos
Thermostat switch.
Push/lifting type self closing tap of 15mm dia chromium plated.
Wiring kit
PVC drain pipe 2m long of size 25 to 40mm dia complete with 04 Nos hose clip.
Stainless steel water tray.
PVC float valve 15mm dia with epoxy coated aluminium rod and high density plastic ball min weight 142 gms with Nipple & long screws. Make: Prayag Polymers Pvt Ltd/Polytuff/Cera.
PVC connection 15 mm dia size 450/600/750 mm long with brass union nuts on both ends. Make: Prayag Polymers Pvt Ltd/Polytuff / Cera.
Gun metal globe/gate valve with iron wheel head, both ends screwed for iron pipe 15mm/20mm bore. Make:-Zoloto/Leader/Kirlosker.
New compressor of Appropriate Make Usha Sri Ram, Blue star, voltas for Water Cooler 40/60/80/120/150 ltr Storage capacity fixed in repair complete including testing of nitrogen gas pressure and charging of gas R-134A/R-22/ whatever required upto required pressure and proper working effect
Refrigerant gas (Make Mafron R-134A/R-22) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Refrigerator and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Refrigerator of any capacity/Make and replacement of damaged /unsv parts of Refrigerator Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items/Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The cost for minor items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, door light switch (push button type) with lamp holder (including lamp), Glass cover for vegitable tray, bi metallic switch, vegitable basket, etc is included in this item. (iv) GE IMA comprises of 29 Refrigerator at this point of time of make: LG, Samsung, Whirlpool of capacity 190/265/320 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.
Taking down and Supply only of New Following spare parts mentioned in item no. 03 suitable for Refrigerator of make: LG, Samsung, Whirlpool of capacity 190/265/320 Ltrs.
Starting relay box type
Thermostat switch
Freezer unit with door assembly
Fan motor for frost free Refrigerator
frost heater
Timer suitable for frost free Refrigerators
Condensor coil with accessories including charging of refrigerant gas R-134A and leakage testing for proper working of compressor
Compressor unit including testing by nitrogen pressure and charging of gas R-134A upto required pressure and proper working effect
Refrigerant gas (Make Mafron R-134A/R-600) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Deepfreezer and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Deepfreezer of any capacity/Make and replacement of damaged /unsv parts of Deepfreezer Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items/Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The cost for minor items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, door light switch (push button type) with lamp holder (including lamp), Glass cover for vegetable tray, bi metallic switch, vegitable basket, etc is included in this item. (iv) GE IMA comprises of 7 Deepfreezer at this point of time of make: Voltas of capacity 320 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.
Taking down and Supply only of New Following spare parts mentioned in item no.05 suitable for Deep freezer:-
Condensor fan Motor including fan blade (wherever necessary).
Compressor unit suitable for deep freezer capacity 300/320 litre with complete testing by nitrogen pressure and charging of gas R-134A upto required pressure and proper working effect duly complete all as specified and directed.
Refrigerant gas (Make Mafron R-134A) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete
M&L For Preventive Maintenance (i.e Checking of Loose connection, Leakge of Body, Damage of any part of Desert Cooler and fan motor,Capacitor ,float valve,Water Pump and Overhauling of Desert cooler of any capacity/Make and replacemnt of damged /unsv parts of water cooler Installed at different Location of IMA Campus . Note : The spare part required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items/ (ii) Scrapping/painting/Welding/soldering/brazing/Fabrication work is included in this item (iii) The cost for minor items required for repair such as front grills, nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 1.5 sqmm stranded copper conductor, Woodwool pad (complete set), Capacitor 4 Mfd, fan blade, switch/controlling knob, water pipe, etc is included in this item. (iv) GE IMA comprises of 184 Desert Cooler at this point of time of make: Surecool/Summercon. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.
Taking down and Supply only of New Following spare parts mentioned in item no. suitable for Desert Cooler of make:Surecool/Summercon:-
Copper wound electric blower fan motor 1/5 HP 1400 RPM single shaft.
Water lifting submersible pump 1/7 HP 1400 RPM.
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Cold storage plant and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Cold storage plant of any capacity/Make and replacement of damaged /unsv parts of Cold storage plant Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items/Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The cost for minor items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, door light switch (push button type) with lamp holder (including lamp), Glass cover for vegetable tray, bi metallic switch, vegitable basket, 6 Amp /16 Amp Plug Top (PVC/Metallic) , Air tight door rubber gasket, etc is included in this item. (iv) GE IMA comprises of 8 Cold storage plant at this point of time of make: Bluestar, Carrier, Kirloskar of capacity 5TR . Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.
Taking down and Supply only of New Following spare parts mentioned in item no. suitable for Cold storage plant of make: Bluestar, Carrier, Kirloskar of capacity 5TR :-
Compressor Three phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.
Compressor Single phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.
Blower fan motor
Single pole, 25 Amp contactor.
Condensor fan motor along with blade set.
Refrigerant Gas (R-404A/R-22) to make up the required pressure.
Cut off panel of cooling system with senser and all accessories.
Evaporating unit with all accessories.
Condenser coil including charging of refrigerant gas R-22/R - 404A and leakage testing.
Taking down and Supply only of New Following spare parts mentioned in item no.11 suitable for SPLIT AC/ window AC Make: Whirlpool,LG,Voltas,Lloyd,Carrier of capacity 1/1.5/2/3 TR :-
Refrigerant Gas R-22 Mono chloro difluoro methane (CHCLF2)/R-122/R410/R-32 to make up the required pressure complete
Running capacitor 36/45 mfd. Make:- Havells / TIBCON /Epcos
Electric condenser fan motor alongwith fan blade, 220 Volts, Single phase.
Nylon/press jute filter
Wiring Kit.
Reverse cycle valve for heating system including charging of refrigerant gas R-22/R-32 and leakage testing complete
Thermostat switch
PVC insulated and sheathed cable 3 core 4.0 sqmm stranded copper conductor Make:-Plaza/Havells/Polycab
Compressor Three phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.
Compressor Single phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.
Copper tubing with insulation of sizes 1/2"or1/4''or 3/8''or 5/8" (as per site requirement).
Condenser coil including testing of nitrogen gas pressure and charging of gas R-22/R-122/R-R410/R-32 upto required pressure and proper working effect.
Three pole contactor.
Single pole, 25 Amp contactor.
Mild steel angle iron wall/ floor stand factory made suitable for out door unit.
Blower fan motor single phase 220/230 volts 1400 RPM
Blower fan motor three phase 415 volts 1400 RPM.
Indoor blower motor single phase 220/230 volts 1400 RPM.
PCB plate complete with connections suitable for any type of existing AC
PVC flexible Pipe 25mm/40mm/50mm dia size over insulated copper tube 3/8” or 5/8”,with necessary packing tape 50mm wide for protection.
Shifting and fixing split AC cap- 1.0/ 1.5 / 2.0 TR including cutting for hole on wall and making good of disturbed surface with matching existing finishes. Note:The transportation cost of AC from one place to another within the premises of IMA Campus is deemed to be included in the quoted rate.
M & L for Dismantling and taking out unserviceable split AC indoor unit and S & F new split AC indoor unit suitable for existing Split type AC 1.5/2 TR capacity suitable for all weather conditions (HOT and COLD) with copper evaporator coil complete including testing of nitrogen gas pressure and charging of gas R-22/R-32 upto required pressure and proper working effect to the satisfaction. complete all as specifed and directed. Make & capacity as per existing
Dismantling and taking out unserviceable split AC outdoor unit and S&F in replacement split AC outdoor unit Suitable for existing Split type AC 1.5/2 TR capacity suitable for all weather conditions (HOT and COLD) with copper condenser coil and compresor complete including testing ofnitrogen gas pressure and charging of gas R-22/R-32 upto required pressure and proper wdorking effect to the satisfaction complete all as specifed and directed.Make & capacity as per existing
Taking down and Supply only of New Following spare parts mentioned in item no.17 suitable for water purifier:-
Membrane 300/150 /100 GPD
Solenoid Valve
Power supply (SMPS 2.5), 240 volts, 50 Hz
UV balance set
MH hoising 300/150/100 GPD
Sediment filter set / UF + MF filter suitable for existing water purifier / Copper Filter/ Carbon Filter/ Precarbon filter
Auto cut Float valve (SENSOR TYPE)
Water purifier booster water pump 100/150/300 GPD
Supply and Fixing Water purifier system ( RO+UV+TDS Controller 50 LPH water purification system ) having following specifications:- a) Dimension (WxDxH) - 500 mm x 300 mm x 650 mm b) Purification Technology - RO+UV+TDS Controller c) Frame Material - CRCA Steel d) Purified Water Recovery - 50% or more e) Purification Capacity - 50 Ltr/Hrs. f) Input Water Pressure - 1 kg/sq.cm-2 kg.sq.cm g) Maximum input water TDS in PPM - Upto 2000 h) Purification Stage - 7 Stage i) Operation - Fully Automatic j) Installation Type - Wall Mounted k) Power supply - 24 V DC & 48 V DC l) TDS Rejection - 90% m) UV Lamp - Yes n) TDS Controller - Yes o) Body of Filters - ABS food graded p) Auto Flashing - Yes q) RO Body Cover - Metallic Sheet r) Warranty and servicing ( including material) - 01 Year Make : Kent, Usha, Jaquar
Supply and Fixing Water purifier system storage type ( RO+UV+TDS Controller 50 LPH water purification system ) having following specifications:- a) Dimension (WxDxH) - 525 mm x 425 mm x 1450 mm b) Purification Technology - RO+UV+TDS Controller c) Frame Material - Outer body CRCA Steel d) Purified Water Recovery - 25%-30% e) Purification Capacity - 50 Ltr/Hrs. f) Input Water Pressure - 1 kg/sq.cm-2 kg.sq.cm g) Maximum input water TDS in PPM - Upto 2000 h) Purification Stage - 7 Stage i) Operation - Fully Automatic j) Installation Type - Floor standing k) Power supply - 24 V DC & 48 V DC l) TDS Rejection - 90% m) UV Lamp - Yes n) TDS Controller - Yes o) Body of Filters - ABS food graded p) Auto Flashing - Yes q) RO Body Cover - Metallic Sheet r) Warranty and servicing ( including material) - 01 Year Make : Kent, Usha, Jaquar
S & F in replacement Copper wound voltage stabilizer single phase for automatic operation, naturally air cooled wall each mounting type and designed for input voltage between 150 volts to 285 volts with output stabilizes voltage 230 volts with accuracy of ± 2.5 % having digital display with time delay of 5 min initally starts of capacity 5 KVA complete all as specified and directed. Make:-V-Gaurd/Microtech/Blue bird. The Contractor should also provide and fiix mounting MS stand suitable to withstand the load of voltage stabilizer.
S & F in replacement Voltage stabilizer Three phase for automatic operation, naturally air cooled wall each mounting type and designed for input voltage between 110 volts to 290 volts with output stabilizes voltage 230 volts with accuracy of ± 2.5 % having digital display with time delay of 5 min initally starts of capacity 30 A, 10 KVA complete all as specified and directed. Make:-V-Gaurd/Microtech/Blue bird. The Contractor should also provide and fiix mounting MS stand suitable to withstand the load of voltage stabilizer.
AIRCOM
M/S K K ENTERPRISES
Tarachand gurudutt
JS CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .